31-12-2021 | Press Release - NEPRA & 1LINK join hands for Online Solution for Payment of Fees | View |
31-12-2021 | Publication of NEPRA Draft Consumer Eligibility Criteria Regulations for Eliciting Public Opinion within 30 days | View |
Draft NEPRA Consumer Eligibility Criteria (Electric Power Suppliers) Regulations, 2021 | View | |
Draft NEPRA Consumer Eligibility Criteria (Distribution Licensees) Regulations, 2021 | View | |
31-12-2021 | Notice for comments Generation Licence Application of YDE SA (SMC-Private) Limited | View |
Generation Licence Application filed by YDE SA (SMC-Private) Limited | View | |
31-12-2021 | Notice for comments Generation Licence Application of Atlas Energy Limited | View |
Generation Licence Application filed by Atlas Energy Limited | View | |
30-12-2021 | Decision of the Authority in the matter of Requests filed by XWDISCOs for Periodic Adjustment in Tariff for the 4th Quarter of FY 2020-21 | View |
30-12-2021 | Public Notice for seeking comments in the matter of Renewal/Extension of Term of Distribution Licence of Lahore Electric Supply Company Limited | View |
Application for Renewal/Extension of Distribution Licence of Lahore Electric Supply Company Limited | View | |
30-12-2021 | Notice Licensee Proposed Modification (LPM) in the Generation Licence of Water & Power Development Authority | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Water & Power Development Authority | View | |
25-12-2021 | Notice to Provide Comments - In the matter of Draft Grid Code 2021 submitted by NTDC for Approval of the Authority within 30 days. | View |
Draft Grid Code 2021 submitted by NTDC for Approval of the Authority | View | |
24-12-2021 | Press Release - NEPRA Imposes Fine of Rs. 21 Million on GEPCO | View |
23-12-2021 | Notice of Hearing - Hearing in the matter of request filed by K-Electric regarding monthly FCA for the month of November 2021 & Quarterly Adjustment for the Quarter ending September 2021 under MYT 2017-2023 | View |
Monthly Cost Variation for the month of November 2021 under Multi-Year Tariff 2017-2023 | View | |
Quarterly variation for the quarter July 2021 to September 2021 under Multi-Year Tariff 2017-2023 - Revised | View | |
Quarterly variation for the quarter July 2021 to September 2021 under Multi-Year Tariff 2017-2023 | View | |
23-12-2021 | Publication of Draft Amendment in NEPRA (Fees) Regulations, 2021 for Eliciting Public Opinion within 30 days | View |
23-12-2021 | Publication of Draft NEPRA (Electric Power Trader) Regulations, 2021 for Eliciting Public Opinion within 30 days | View |
Draft NEPRA (Electric Power Trader) Regulations, 2021 | View | |
23-12-2021 | Addendum: Notice of Public Hearing in the Matter of Integration Plan into the Competitive Trading Bilateral Contract Market (CTBCM) submitted by the K-Electric Limited (KEL) for Approval of the Authority | View |
19-12-2021 | Hearing Regarding Fuel Charges Adjustment for the month of November 2021 for EX-WAPDA Distribution Companies | View |
CPPAG - XWDISCOs Energy Purchase data for month of November 2021 | View | |
18-12-2021 | Distribution Transformer Explosion | View |
17-12-2021 | Addendum: Notice of Public Hearing in the Matter of Integration Plan into the Competitive Trading Bilateral Contract Market (CTBCM) submitted by the K-Electric Limited (KEL) for Approval of the Authority | View |
17-12-2021 | Publication of Draft Amendments in NEPRA Licensing (Application, Modification, Extension And Cancellation) Procedure Regulations, 2021 for Eliciting Public Opinion within 30 days | View |
Draft Amendments in NEPRA Licensing (Application, Modification, Extension And Cancellation) Procedure Regulations, 2021 | View | |
17-12-2021 | Draft Licensing (Microgrid) Regulations, 2021 for comments of General Public & Stakeholders by 20-12-2021 | View |
14-12-2021 | Notice for Comments Generation Licence Application of GSolar Power (Private) Limited | View |
Application for Generation License for 1,045.925 kWp | View | |
14-12-2021 | Notice for Comments Generation Licence Application of Zero Carbon Power (Private) Limited | View |
Application for the Grant of Distributed Generation License for 1.82 MW Solar Power Plant at Bulleh Shah Packaging (Private) Limited. Kot Krishan Radha Road, Kasur. | View | |
11-12-2021 | Publication of NEPRA Draft Performance Standards Regulations For Eliciting Public Opinion within 30 days | View |
Draft NEPRA Performance Standards (Distribution) Regulations, 2021 | View | |
Draft NEPRA Performance Standards (Supplier) Regulations, 2021 | View | |
10-12-2021 | Draft NEPRA Licensing (Microgrid) Regulations, 2021 for comments of stakeholders by 20th December 2021 | View |
Schedules 1, 2 and 3 of Draft NEPRA Licensing (Microgrid) Regulations, 2021 for comments of stakeholders by 20th December 2021 | View | |
09-12-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of October 2021 for XWDISCOs along with Notification Thereof | View |
09-12-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of October 2021 for XWDISCOs along with Notification Thereof | View |
09-12-2021 | Notice of Public Hearing - Power Acquisition Request (PAR) submitted by Peshawar Electric Supply Company Ltd. (PESCO) for Procurement of Energy from 40.8 MW Koto Hydropower Project Developed by Pakhtunkhwa Energy Development Organization (PEDO) | View |
Power Acquisition Request (PAR) submitted by Peshawar Electric Supply Company Ltd. (PESCO) for Procurement of Energy from 40.8 MW Koto Hydropower Project Developed by Pakhtunkhwa Energy Development Organization (PEDO) | View | |
Notice of Public Hearing - Power Acquisition Request (PAR) submitted by Peshawar Electric Supply Company Ltd. (PESCO) for Procurement of Energy from 40.8 MW Koto Hydropower Project Developed by Pakhtunkhwa Energy Development Organization (PEDO) | View | |
08-12-2021 | Publication of Draft Amendment in National Electric Power Regulatory Authority (Fees) Regulations, 2021 for Eliciting Public Opinion within 30 days | View |
08-12-2021 | Publication of Notification of Draft National Electric Power Regulatory Authority (Registration) Regulations, 2021 for Eliciting Public Opinion within 30 days | View |
Draft NEPRA (Registration) Regulations, 2021 | View | |
07-12-2021 | Corrigendum with regard to SRO 1576(1)/2021 dated 06.12.2021 - K-Electric | View |
06-12-2021 | Decision of the Authority in the matter of Monthly Fuel Charges Adjustment of K-Electric Limited for the month of September 2021 and Notification (S.R.O. 1576(1)12021 dated 06.12.2021 ) Thereof | View |
03-12-2021 | Addendum: Notice of Public Hearing in the Matter of Integration Plan into the Competitive Trading Bilateral Contract Market (CTBCM) submitted by the K-Electric Limited (KEL) for Approval of the Authority | View |
02-12-2021 | K-Electric Limited monthly Cost Variation for the month of October 2021 under Multi-Year Tariff 2017-2023 (Revised) | View |
K-Electric Limited Summary of required adjustment on account of Variation in cost of fuel and power purchases | View | |
02-12-2021 | Notice of Hearing - Hearing regarding Adjustment request for Indexation of Multi Year Tariff (MYT) Components for the FY 2021-22 and other Adjustments in the Consumer end Tariff of Lahore Electric Supply Company Limited (LESCO) | View |
Application fir Adjustment request for Indexation of Multi Year Tariff (MYT) Components for the FY 2021-22 and other Adjustments in the Consumer end Tariff of Lahore Electric Supply Company Limited (LESCO) | View | |
29-11-2021 | Determination of National Electric Power Regulatory Authority in the matter of Tariff Petition filed by Siachen Energy Limited for Determination of Generation Tariff in respect of 100.008 MWp Solar Power Project | View |
27-11-2021 | Notice of Public Hearing in the Matter of Integration Plan into Competitive Trading Bilateral Contract Market (CTBCM) submitted by the K-Electric Limited (KEL) for Approval of the Authority | View |
KE Evaluation & Integration Plan for Competitive Trading Bilateral Contracts Market (CTBCM) | View | |
Issues of Public Hearing in the matter of K-Electric (KE) Integration Plan into CTBCM | View | |
27-11-2021 | Re-Scheduling of Hearing - Petition filed by Hyderabad Electric Supply Company Limited (HESCO) for the Determination of its Tariff for Supply and Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
27-11-2021 | Re-Scheduling of Hearing - Petition filed by Sukkur Electric Power Company Limited (SEPCO) for the Determination of its Tariff for Supply and Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
26-11-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Nishat Mills Limited | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Nishat Mills Limited | View | |
21-11-2021 | NEPRA Tender No. 15/2021 - Hiring of Consultant | View |
20-11-2021 | Notice of Hearing - Hearing in the matter of Request filed by K-Electric regarding Monthly Fuel Charge Adjustment for the month of October 2021 under Multi Year Tariff (MYT) 2017-2023 | View |
K-Electric monthly Cost Variation for the month of October 2021 under Multi Year Tariff 2017-2023 | View | |
20-11-2021 | Hearing regarding Fuel Charges Adjustment for the Month of October 2021 for Ex-WAPDA Distribution Companies | View |
CPPAG Energy Purchase Data for the month of October 2021 for XWDISCOs | View | |
20-11-2021 | Notice of Admission/ Hearing - All- stakeholders, interested/affected persons and the general public are notified that Hyderabad Electric Supply Company Limited (HESCO) has filed petition with the National Electric Power Regulatory Authority (NEPRA) for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
Application of Hyderabad Electric Supply Company Limited (HESCO) for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
HESCO Additional Information for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
Issues for Hearing � Multi Year Tariff petition filed by Hyderabad Electric Supply Company Limited (HESCO) for determination of tariff for Distribution of Power for the FY 2020-21& FY 2024-25 | View | |
20-11-2021 | Notice of Admission/ Hearing - All stakeholders, interested/affected persons and the general public are notified that Hyderabad Electric Supply Company Limited (HESCO) has filed petition with the National Electric Power Regulatory Authority (NEPRA) for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
Application of Hyderabad Electric Supply Company Limited (HESCO) for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
HESCO Additional Information for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
Issues for Hearing � Multi Year Tariff petition filed by Hyderabad Electric Supply Company Limited (HESCO) for determination of tariff for Supply of Power for the FY 2020-21& FY 2024-25 | View | |
20-11-2021 | Notice of Admission/ Hearing - Hearing regarding Adjustment request for Indexation of Multi Year Tariff (MYT) components for the FY 2021-22 and other Adjustments in the Consumer end Tariff of Islamabad Electric Supply Company Limited (IESCO) | View |
Application of adjustment request for Indexation of Multi Year Tariff (MYT) components for the FY 2021-22 and other Adjustments in the Consumer end Tariff of Islamabad Electric Supply Company Limited (IESCO) | View | |
20-11-2021 | Notice of Admission/ Hearing - All- stakeholders, interested/affected persons and the general public are notified that Sukkur Electric Power Company Limited (SEPCO) has filed petition with the National Electric Power Regulatory Authority (NEPRA) for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
Application of Sukkur Electric Power Company Limited (SEPCO) for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
Issues for Hearing � Multi Year Tariff petition filed by Sukkur Electric Power Company Limited (SEPCO) for determination of tariff for Distribution of Power for the FY 2020-21& FY 2024-25 | View | |
20-11-2021 | Notice of Admission/ Hearing - All stakeholders, interested/affected persons and the general public are notified that Sukkur Electric Power Company Limited (SEPCO) has filed petition with the National Electric Power Regulatory Authority (NEPRA) for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
Application of Sukkur Electric Power Company Limited (SEPCO) for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
Issues for Hearing � Multi Year Tariff petition filed by Sukkur Electric Power Company Limited (SEPCO) for determination of tariff for Supply of Power for the FY 2020-21& FY 2024-25 | View | |
20-11-2021 | Notice of Hearing - Hearing regarding Adjustment Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2021-22 and other Adjustments in the Consumer end Tariff of Faisalabad Electric Supply Company Limited (FESCO) | View |
Application regarding adjustment Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2021-22 and other Adjustments in the Consumer end Tariff of Faisalabad Electric Supply Company Limited (FESCO) | View | |
19-11-2021 | Press Release - Webinar on Preparation Strategy, Methodology & Roadmap for Indicative Generation Capacity Expansion Plan (IGCEP) | View |
18-11-2021 | Press Release - NEPRA�s HSE Webinar and Award Ceremony | View |
17-11-2021 | Licensees HSE Performance Evaluation 2020 Report | View |
17-11-2021 | Notice of Hearing - Hearing regarding Petition filed by Lahore Electric Supply Company Limited (LESCO) for Modification of Re-Determination dated 18-09-2017 of the National Electric Power Regulatory Authority regarding Multi-Year Consumer End Tariff of LESCO | View |
Petition for Modification of Re-Determination dated 18-09-2017 of the National Electric Power Regulatory Authority regarding Multi-Year Consumer End Tariff of LESCO | View | |
Framing of Issues for hearing regarding Petition filed by Lahore Electric Supply Company Limited (LESCO) for Modification of Re-Determination dated 18-09-2017 of the National Electric Power Regulatory Authority regarding Multi-Year Consumer End Tariff of LESCO | View | |
16-11-2021 | Modification-I in the Generation Licence of NASDA Green Energy (Private) Limited (NGEPL) | View |
16-11-2021 | Modification-I in the Generation Licence of Artistic Wind Power (Private) Limited (AWPPL) | View |
13-11-2021 | Public Notice for seeking comments in the matter of Renewal/ Extension of Term of Distribution Licence of Faisalabad Electric Supply Company Limited (FESCO) | View |
Application of FESCO for Renewal/ Extension of Distribution Licence No. 02/DL/2002 | View | |
12-11-2021 |
National Electric Power Regulatory Authority (Fine) Regulations, 2021 | View |
12-11-2021 | Notice Licensee Proposed Modification (LPM) in the Generation Licence of Lucky Energy (Private) Limited | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Lucky Energy (Private) Limited | View | |
11-11-2021 | NEPRA Social Investment Guidelines 2021 S.R.O No. 1459(I)/2021 | View |
09-11-2021 | Notification S.R.O No. 1448(I)/2021 distributed generation facility using solar or wind power generation upto 25 kilowatt, connected with the network of a distributed licensee through net metering facility, shall not require a generation licence from the National Electric Power Regulatory Authority | View |
08-11-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of September 2021 for XWDISCOs along with Notification Thereof | View |
08-11-2021 | Tariff Notifications of XWDISCOs (Winter Package) S.R.O No. 1418 dated 05 November 2021 | View |
06-11-2021 | Publication of Notification of National Electric Power Regulatory Authority (NEPRA) Licensing (System Operator and Market Operator) Regulations, 2021 for eliciting public opinion within 30 days | View |
The National Electric Power Regulatory Authority (NEPRA) Licensing (System Operator) Regulations, 2021 | View | |
The National Electric Power Regulatory Authority (NEPRA) Licensing (Market Operator) Regulations, 2021 | View | |
05-11-2021 | Press Release - NEPRA Imposes Fine of Rs. 26 Million on FESCO | View |
05-11-2021 | Decision of the Authority in the matter of Motion filed by the Federal Government under Section 7 and 31 of the NEPRA Act 1997 read with Rule 17 of the NEPRA (Tariff Standards and Procedure) Rules 1998 with respect to Recommendation of the Consumer-end-Tariff for XWDISCOs & K-Electric | View |
05-11-2021 | Re-scheduling of Hearing - Petition filed by Tribal Areas Electric Supply Company Limited (TESCO) for the Determination of its Tariff for Supply and Distribution of Electric Power for the FY 2020-21 to 2024-25 | View |
04-11-2021 | Sample Calculations for K-Electric Monthly FCA | View |
03-11-2021 | Press Release - MoU signed between NEPRA and Dawood Global foundation Ladies Fund Energy (Pvt.) Ltd. | View |
03-11-2021 | Decision of the Authority in the matter of Motion filed by the Federal Government with respect to Winter Incentive Package for Electricity Consumers on Incremental Consumption of XWDISCOs & K-Electric | View |
02-11-2021 | Notice of Hearing - Hearing regarding Quarterly Adjustments of XWDISCOs on account of Capacity Charges, Transmission Charges and Market Operation Fee, Variable Operation and Maintenance Charges and Impact of T&D Losses on FCA for the 4th Quarter of FY 2020-21 | View |
Application for Quarterly Adjustments of XWDISCOs on account of Capacity Charges, Transmission Charges and Market Operation Fee, Variable Operation and Maintenance Charges and Impact of T&D Losses on FCA for the 4th Quarter of FY 2020-21 | View | |
29-10-2021 | Order of the Authority for allowing Provisional Renewal in the Distribution Licence of Islamabad Electric Supply Company | View |
29-10-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Mughal Energy Limited | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Mughal Energy Limited | View | |
28-10-2021 | Notice of Admission / Hearing - Federal Government Motions with respect to recommendation of Consumer-end Tariff for K-Electric & XWDISCOs, under section 7 & 31 of the Regulations, Generation, Transmission and Distribution of Electric Power Act, 1997 (The "Act") read with rule 17 of the NEPR tariff (Standards and Procedures) rules, 1998 | |
Federal Government Motion with respect to recommendation of Consumer-end Tariff for XWDISCOs, under section 7 & 31 of the Regulations, Generation, Transmission and Distribution of Electric Power Act, 1997 (The "Act") read with rule 17 of the NEPR tariff (Standards and Procedures) rules, 1998 | View | |
Federal Government Motion with respect to recommendation of Consumer-end Tariff for K-Electric, under section 7 & 31 of the Regulations, Generation, Transmission and Distribution of Electric Power Act, 1997 (The "Act") read with rule 17 of the NEPR tariff (Standards and Procedures) rules, 1998 | ||
27-10-2021 | Notice of Admission / Hearing - Petition filed by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) for Determination of its Multi-year Market Operation Fee for the FY 2021-22 to FY 2023-24 | |
Petition filed by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) for Determination of its Multi-year Market Operation Fee for the FY 2021-22 to FY 2023-24 | ||
27-10-2021 | Notice of Admission / Hearing - TESCO has filed Petition with the NEPRA for the Determination of its Tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | |
Petition filed by TESCO for Determination of its Tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
Issues for Hearing � Multi Year Tariff petition filed by Tribal Areas Electric Supply Company Limited (TESCO) for determination of tariff for supply of power for the FY 2020-21& FY 2024-25. | ||
27-10-2021 | Notice of Admission / Hearing - TESCO has filed Petition with the NEPRA for the Determination of its Tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | |
Petition filed by TESCO for Determination of its Tariff for Distrbution of Electric Power for the FY 2020-21 to FY 2024-25 | View | |
Issues for Hearing � Multi Year Tariff petition filed by Tribal Areas Electric Supply Company Limited (TESCO) for determination of tariff for distribution of power for the FY 2020-21& FY 2024-25. | ||
27-10-2021 | Decision of the Authority in the matter of Monthly Fuel Charges Adjustment of K-Electric Limited for the month of August 2021 and Notification (S.R.O. 1397(1)/2021 dated 27.10.2021 '1 Thereof | View |
26-10-2021 | Notice of Admission / Hearing - QESCO has filed Petition with the NEPRA for the Determination of its Tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | |
Petition filed by QESCO for the Determination of its Tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | ||
Issues for Hearing � Multi Year Tariff petition filed by QESCO for determination of tariff for Supply of power for the FY 2020-21 & FY 2024-25. | ||
26-10-2021 | Notice of Admission / Hearing - QESCO has filed Petition with the NEPRA for the Determination of its Tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | |
Petition filed by QESCO for the Determination of its Tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | ||
Issues for Hearing � Multi Year Tariff petition filed by QESCO for determination of tariff for distribution of power for the FY 2020-21 & FY 2024-25. | ||
25-10-2021 | Decision of the Authority in the matter of Monthly Fuel Charges Adjustments of K-Electric Limited for the month of July 2021 and Notification (S.R.O. 1393(1)/2021 dated 25.10.2021) Thereof | View |
22-10-2021 | Press Release - NEPRA hosts a Seminar on Cyber Security | |
22-10-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) in respect of 1.875 MW Shishi Hydropower Plant at Chitral | |
21-10-2021 | Notice for Hearing hearing in the matter of Request filed by K-Electric regarding Monthly Fuel Charges Adjustment for the Month of September 2021 under Multi Year Tariff (MYT) 2017-2023 | |
Application of K-Electric for monthly cost variation for the month of September 2021 under Multi-Year Tariff 2017-2023 | ||
20-10-2021 | Hearing regarding Fuel Charges Adjustment for the Month of September 2021 for EX-WAPDA Distribution Companies | |
CPPAG - XWDISCOs Energy Purchase Data for month of September 2021 | ||
16-10-2021 | Hearing regarding Federal Government Motion with respect to recommendation of Extension of Incremental Consumption Package for K-Electric Industrial Consumers | |
Motion with respect to recommendation of extension of incremental consumption package for K-Electric industrial consumers | ||
16-10-2021 | Public Hearing regarding Federal Government Motion with respect to Winter Incentive Package for Electricity Consumers on Incremental Consumption for Domestic, Commercial and General Services Consumers of K-Electric and XWDISCOs | |
Motion with respect to winter incentive package for electricity consumers on incremental consumption for domestic, commercial & general services consumers of K-ELECTRIC and XWDISCOs | ||
14-10-2021 | Notice of Hearing on Additional Issues - Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 2.6 MW Machai Hydropower Project located at Mardan, Khyber Pakhtunkhwa Province | |
14-10-2021 | Notice of Hearing on Additional Issues - Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 36.6 MW Daral Khwar Hydropower Project located at Swat, Khyber Pakhtunkhwa Province | |
14-10-2021 | Notice of Hearing on Additional Issues - Petition for Tariff Modification filed by Punjab Power Development Company Limited (PPBCL) for its 4.04 MW Deg-Outfall Hydropower Project located at Sheikhupura, Punjab Province | |
14-10-2021 | Notice of Hearing on Additional Issues - Petition for Tariff Modification filed by Punjab Power Development Company Limited (PPBCL) for its 5.38 MW Chianwali Hydropower Project located at Chianwali, Punjab Province | |
12-10-2021 | Public Notice for seeking comments in the mater of Renewal of Term of Generation Licence of Pakistan Steel Mills Corporation (Pvt.) Limited | |
Application of Pakistan Steel Mills Corporation (Pvt.) Limited for Renewal of Term of Generation Licence | ||
11-10-2021 | Press Release - NEPRA Imposes fine of Rs. 26 Million on HESCO on account of fatalities due to Transformer Blast | |
08-10-2021 | Press Release - NEPRA delegates visited Kot Addu Power Company (KAPCO) to sign MoU between KAPCO and Akhuwat Foundation under NEPRA CSR Power with Prosperity to make solar power more accessible to the unserved communities of Pakistan | |
08-10-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of August 2021 for XWDISCOs along with Notification Thereof | |
06-10-2021 | Press Release - MoU signing ceremony | |
01-10-2021 | Modification-XI in the Generation Licence of K-Electric Limited (KEL) | |
01-10-2021 | Modification-I in the Generation Licence of Lucky Cement Limited (LCL) | |
30-09-2021 | Press Release - Publication of Annual and State of Industry Reports, 2021 | |
30-09-2021 | Notification S.R.O 1278(I)/2021 quarterly adjustments of XWDISCOs for the 1st and 2nd Quarters of FY 2020-21 | |
27-09-2021 | Press Release - Newly appointed Chairmen of Board of Directors (BODs) of the respective DISCOs were invited by NEPRA Authority for a meeting today at NEPRA Headquarters | |
26-09-2021 | Public Hearing regarding excessive billing beyond one month | |
25-09-2021 | Publication of Notification of NEPRA (Uniform System of Accounts) Regulations, 2021 for eliciting public opinion within 30 days | |
NEPRA (Uniform System of Accounts) Regulations, 2021 | ||
Templates of Regulatory Accounts for Generation Companies | ||
Templates of Regulatory Accounts for Transmission Companies | ||
Templates of Regulatory Accounts for Distribution Companies | ||
25-09-2021 | Notice of Admission/ Hearing - Petition for Tariff Modification filed by Central Power Purchasing Agency Guarantee Limited (CPPA-G) in respect of Kohala Hydropower Company (Pvt.) Ltd. for 1,124 MW Power Project at Azad Jammu and Kashmir, Pakistan | |
CPPAG Proposal for Modification of Tariff of Kohala Hydro Company (Pvt.) Limited (Tariff Determination dated 11th October 2018) | ||
25-09-2021 | Press Release - NEPRA holds webinar on Personal Protective Equipment (PPE)/ Tools & Plants (T&P) in Power Sector | |
24-09-2021 | Press Release - NEPRA approves IGCEP 2021-30 | |
24-09-2021 | Determination of the Authority in the matter of Indicative Generation Capacity Expansion Plan (IGCEP) 2021-30 | |
24-09-2021 | Application of Shahtaj Sugar Mills Limited for Review of Generation Tariff dated January 02, 2017 Notified Vide SRO No. 453(I)/2017 dated June 07, 2017 before NEPRA in respect of SSML 32 MW Bagasse Based Co-Generation Power Project. | |
23-09-2021 | Press Release/ Brief - Providing basis for Re-Targeting Power Sector Subsidies | |
23-09-2021 | Determination in the matter of Policy Guidelines forwarded by the Ministry of Energy (MoE) under Section 31 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 for providing basis for Re-Targeting Power Sector Subsidies in Future | |
23-09-2021 | Public Notice for seeking Comments- in the matter of Renewal/ Extension of Term of Generation Licence of Altern Energy Limited | |
Application of Extension of the Generation Licence of Altern Energy Limited | ||
22-09-2021 | Notice of Hearing - Hearing in the matter of request filed by K-Electric regarding Monthly Fuel Charge Adjustment for the Month of August 2021 under Multi Year Tariff (MYT) 2017-23 | |
K-Electric Monthly Cost Variation for the month of August 2021 under Multi Year Tariff (MYT) 2017-23 | ||
22-09-2021 | Notice of Hearing - Hearing in the matter of request filed by K-Electric regarding Monthly Fuel Charge Adjustment for the Month of August 2021 under Multi Year Tariff (MYT) 2017-23 | |
K-Electric Monthly Cost Variation for the month of August 2021 under Multi Year Tariff (MYT) 2017-23 | ||
22-09-2021 | Notice - Licencsee Proposed Modification (LPM)in the Generation Licence of Ettihad Power Generation Limited | |
Application for Licencsee Proposed Modification (LPM)in the Generation Licence of Ettihad Power Generation Limited | ||
Generation Licence No. IGSPL/56/2015 Licence Application No. LAG-283 Etihad Power Generation Limited | ||
21-09-2021 | Hearing regarding Fuel Charges Adjustment for the Month of August 2021 for EX-WAPDA Distribution Companies | |
CPPAG XWDISCOs Energy Purchase Date for the Month of August 2021 | ||
19-09-2021 | Press Release - NEPRA�s Authority visits Wind Power Plants at Jhimpir, Thatta | |
17-09-2021 | Press Release - NEPRA Authority Visits K-Electric Facilities | |
15-09-2021 | Modification Generation Licence No. GLIO4/2002 - (Modification-XI) Licence Application No. LAG-05 K-Electric Limited, (KEL) | |
15-09-2021 | Notice for eliciting Public Opinion on proposed amendment in NEPRA Service Regulations within 30 days | |
Appendix 9 - New NEPRA Policy for Official Vehicles | ||
Appendix 9 - Old NEPRA Policy for Official Vehicles | ||
14-09-2021 | Publication of "Public Electric Vehicle Charging Stations" Chapter in Consumer Service Manual for eliciting public opinion within 21 days | |
11-09-2021 | Modification-I in the Generation Licence of Metro Wind Power Limited (MWPL) | |
11-09-2021 | Modification-I in the Generation Licence of Gul Ahmad Electric Limited (GAEL) | |
10-09-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of July 2021 for XWDISCOs along with Notification Thereof | |
10-09-2021 | Notice regarding Public Hearing - in the Matter of the request for Proposal (RFP) submitted by K-Electric for Three Solar Project at Vinder, Uthal and Bella Districts of Balochistan | |
Submission of Request For Proposal (RFP) for three (03) Solar Projects at Vinder, Uthal and Bela Districts of Balochistan | ||
List of Prequalified Bidders along with their Company Profile | ||
List of Issues for Public Hearing of K-Electric | ||
10-09-2021 | Public Notice for Seeking Comments in the matter of Renewal/ Extension of Term of Distribution Licence of Islamabad Electric Supply Company Limited (IESCO) | |
Application of IESCO for Renewal/ Extension of Distribution Licence No. 01/DL/2001 | ||
09-09-2021 | Notice of Admission/ Hearing - Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 18 MW Pehur Hydropower Project located t Swabi, Khyber Pakhtunkhwa Provine | |
Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 18 MW Pehur Hydropower Project located t Swabi, Khyber Pakhtunkhwa Provine | ||
08-09-2021 | Press Release - Over-billing in terms of raising bills beyond approved billing period by various DISCOs | |
08-09-2021 | Presentation - Hearing regarding tariff to be charged from electric vehicles by electric vehicle charging station | |
08-09-2021 | Seeking Comments on Draft Regulatory Framework for Electric Vehicle charging station within 30 days | |
07-09-2021 | Press Release - Sukker Electric Power Company (SEPCO) fined Rs 28 Million | |
03-09-2021 |
Notice for Comments - Generation Licence
Application of Pakistan Atomic Energy Commission for its
Chashma Nuclear Power Plant Unit-5 |
|
02-09-2021 |
Decision of the Authority in the matter of
Petition filed by Pak Matiari Lahore Transmission Company
(Pvt.) Ltd. (PMLTC or the Petitioner or The Company) for
Modification of Tariff Determination dated December 4, 2018 |
|
01-09-2021 |
Hearing regarding Tariff to be charged from Electric Vehicles by Electric Vehicles Charging Station | |
31-08-2021 |
Press Release - Zero-accidents in the power sector is NEPRAs ultimate goal: Chairman NEPRA | |
27-08-2021 |
Notice - NEPRA Invites Applications for Management Trainee Programme | |
27-08-2021 |
Notice - Cancellation of Advertisement "NEPRA Invites Applications for Internships" | |
26-08-2021 |
Publication of Notification of NEPRA (Fine) Regulations, 2021 for eliciting public opinion within 30 days | |
Draft NEPRA (Fine) Regulations, 2021 | ||
26-08-2021 |
Notice for Comments - Generation Licence Application of Pakhtunkhwa Energy Development Organization - Balakot Hydro Power Project | |
Application for Generation Licence Application of Pakhtunkhwa Energy Development Organization - Balakot Hydro Power Project | ||
25-08-2021 |
Grant of Generation Licence No. IGSPL/108/2021 Licence Application No. LAG-487 Sapphire Hydro Limited (SHL) | |
25-08-2021 |
Notice of Hearing - Hearing in the Matter of requests filed by K-Electric regarding monthly Fuel Charges Adjustment for the month of July 2021 and Quarterly Adjustment for the Quarter ending June 2021 under Multi Year Tariff (MYT) 2017-23 | |
Application of K-Electric regarding monthly Fuel Charges Adjustment for the month of July 2021 | ||
Application of K-Electric regarding Quarterly Adjustment for the Quarter ending June 2021 under Multi Year Tariff (MYT) 2017-23 | ||
23-08-2021 |
Decision of the Authority in the matter of Motion for Leave for Review filed by Energy and Power Department, Govt. of Khyber Pakhtunkhwa against the Authority Decision dated April 5, 2021 regarding WAPDA Hydroelectric Tariff Petition for FY 2020-21 | |
23-08-2021 | Decision of the Authority in the matter of Motion for Leave Review filed by Northern Power Generation Company Ltd. (NPGCL) against Determination of the Authority dated December 30, 2020 in the matter of Tariff Petition for Muzaffargarh Units 1-6 and GTPS Faisalabad Units 5-9 | View |
18-08-2021 |
Hearing regarding Fuel Charges Adjustment for the Month of July 2021 for EX-WAPDA Distribution Companies | View |
CPPAG - XWDISCOs Energy Purchase Data for the Month of July 2021 | View | |
14-08-2021 |
Press Release - NEPRA Celebrates Pakistan Independence Day | View |
06-08-2021 |
Decision of the Authority in the matter of Monthly Fuel Charges Adjustments of K-Electric Limited for the period from January-June 2021 and Notification (S.R.O. 995(1)/2021 dated 06.08.2021 ) Thereof | View |
06-08-2021 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the month of June 2021 for XWDISCOs along with Notification Thereof | View |
05-08-2021 |
Decision of the Authority in the matter of Interim Relief of Tariff Adjustment at Commercial Operation Date (COD) Stage Pursuant to Rule 4(7) of the NEPRA Tariff (Standards & Procedure) Rules, 1998 - Sindh Transmission & Dispatch Company (Private) Limited | View |
05-08-2021 |
Modification-IV in the Generation Licence of Jamshoro Power Company Limited (AWPL) | View |
05-08-2021 |
Modification-II in the Generation Licence of Tapal Energy (Private) Limited (TEPL) | View |
05-08-2021 |
Modification in the Generation Licence of Gul Ahmed Energy Limited (GAEL) | View |
05-08-2021 |
Modification-I in the Generation Licence of ACT II Wind (Private) Limited (AWPL) | View |
05-08-2021 |
Re-Scheduling of Hearing in the matter of petitions filed by Peshawar Electric Supply Company Ltd. regarding distribution and supply of power tariff petitions for the FY 2020-21 to the FY 2024-25 | View |
31-07-2021 |
Hearing regarding Policy Guidelines under Section 31 of Regulation, Generation, Transmission Distribution of Electric Power Act, 1997 for Providing basis for Re-Targeting Power Sector Subsidies in future | View |
Policy Guidelines under Section 31 of Regulation, Generation, Transmission Distribution of Electric Power Act, 1997 for Providing basis for Re-Targeting Power Sector Subsidies in future | View | |
30-07-2021 | Decision of the Authority in the matter of Tariff Proposal submitted by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) for Import of 969 MW from Neelum Jhelum Hydropower Project | |
30-07-2021 |
Decision of the Authority in the matter of Requests filed by XWDISCOs for Periodic Adjustment in Tariff for the 3td Quarter of FY 2020-21 | View |
27-07-2021 |
Re-Scheduling of Hearing in the matter of requests filed by K-Electric regarding Monthly Fuel Charges Adjustments for the period from January 2021 to June 2021, and Quarterly Adjustment for the quarter ending March 2021 under Multi Year Tariff (MYT) 2017-2023 | View |
16-07-2021 |
Hearing regarding Fuel Charges Adjustment for the Month of June 2021 for EX-WAPDA Distribution Companies | View |
CPPAG Energy Purchase data for the Month of June 2021 | View | |
16-07-2021 |
Notice of Hearing - Hearing in the Matter of Requests filed by K-Electric regarding Monthly Fuel Charge Adjustments for the Period January 2021 to June 2021, Quarterly Adjustment for the Quarter ending March 2021 under Multi Year Tariff (MYT) 2017-2023 | View |
K-Electric requests for Fuel Charges Adjustment for the months of Jan 2021 to June 2021 (Summary) | View | |
K-Electric requests for Fuel Charges Adjustment for the months of Jan 2021 to June 2021 (Complete Request) | View | |
K-Electric Request Quarterly Adjustment for the Quarter ending March 2021 (Summary) | View | |
K-Electric Request Quarterly Adjustment for the Quarter ending March 2021 (Complete Request) | View | |
16-07-2021 |
Modification-I in the Generation Licence of Liberty Wind Power 2 (Private) Limited (LWPPL-2) (Formerly Noor Solar Energy (Private) Limited | View |
16-07-2021 |
Modification-II in the Generation Licence of Safe Solar Power (Private) Limited (SSPPL) | View |
14-07-2021 |
Notice of Admission / Hearing - MEPCO has filed Petition with NEPRA for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Petition filed by MEPCO with NEPRA for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Issues for Hearing - Multi Year Tariff petition filed by MEPCO for determination of tariff for Distribution of power for the FY 2020-21 & FY 2024-25 | View |
14-07-2021 |
Notice of Admission / Hearing - MEPCO has filed Petition with NEPRA for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Petition filed by MEPCO with NEPRA for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Issues for Hearing - Multi Year Tariff petition filed by MEPCO for determination of tariff for Supply of power for the FY 2020-21 & FY 2024-25 | View |
14-07-2021 |
Notice of Admission / Hearing - PESCO has filed Petition with NEPRA for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Petition filed by PESCO with NEPRA for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Issues for Hearing - Multi Year Tariff petition filed by PESCO for determination of tariff for Distribution of power for the FY 2020-21 & FY 2024-25 | View |
14-07-2021 |
Notice of Admission / Hearing - PESCO has filed Petition with NEPRA for the Determination of its Multi-Year tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Petition filed by PESCO with NEPRA for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Issues for Hearing - Multi Year Tariff petition filed by PESCO for determination of tariff for Supply of power for the FY 2020-21 & FY 2024-25 | View |
14-07-2021 |
Notice of Admission / Hearing - GEPCO has filed Petition with NEPRA for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Petition filed by GEPCO with NEPRA for the Determination of its tariff for Distribution of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Issues for Hearing - Multi Year Tariff petition filed by GEPCO for determination of tariff for Distribution of power for the FY 2020-21 & FY 2024-25 | View |
14-07-2021 |
Notice of Admission / Hearing - GEPCO has filed Petition with NEPRA for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Petition filed by GEPCO with NEPRA for the Determination of its tariff for Supply of Electric Power for the FY 2020-21 to FY 2024-25 | View |
14-07-2021 |
Issues for Hearing - Multi Year Tariff petition filed by GEPCO for determination of tariff for Supply of power for the FY 2020-21 & FY 2024-25 | View |
13-07-2021 |
Grant of Generation Licence No. SGC/158/202 1 Licence Application No. LAG-490 Ittehad (Private) Limited (ITDPL) | View |
13-07-2021 |
Grant of Generation Licence No. SGC/157/2021 Licence Application No. LAG-497 YDE SA (SMC-Private) Limited (YDE) | View |
12-07-2021 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the month of May 2021 for XWDISCOs along with Notification Thereof | View |
09-07-2021 |
Modification-I in the Generation Licence of Access Solar (Private) Limited (ASPL) | View |
09-07-2021 |
Modification-I in the Generation Licence of Access Electric (Private) Limited | View |
08-07-2021 | NEPRA Vacancy Announcement | View |
07-07-2021 |
Modification-IV in the Generation Licence of Northern Power Generation Company Limited (NPGCL) | View |
07-07-2021 |
Modification-x in the Generation Licence of K-Electric Limited (KEL) | View |
07-07-2021 |
Modification-II in the Generation Licence of Liberty Win Power 1 (Private) Limited (LWPPL-1) | View |
07-07-2021 |
Modification-I in the Generation Licence of Din Energy Limited (DEL) | View |
07-07-2021 |
Modification-II in the Generation Licence of Karachi Nuclear Power Plant of Pakistan Atomic Energy Commission (PAFC/KANUPP) | View |
07-07-2021 |
Public Notice for Seeking Comments in the matter of Renewal of Term of Generation Licence of Kot Addu Power Company Limited | View |
Application for Generation Licence extension proposed for Generation Licence No. IPGL/020/2004 relating to 1600 MW KAPCO Complex Located at Kot Addu, Muzaffargrah, Punjab, Pakistan | View | |
06-07-2021 | Notice for Comments - Application of Fauji Fertilizer Bin Qasim Limited for Grant of Generation Licence | View |
Application of Fauji Fertilizer Bin Qasim Limited for Grant of Generation Licence | View | |
02-07-2021 |
Press Release - NEPRA Capacity Building Training Programme in collaboration with FSR-MIT | View |
02-07-2021 |
Decision of the Authority in the matter of Reconsideration Request filed by the Federal Government under Section 31(7) of the NEPRA Act 1997 read with Rule 17 of the NEPRA (Tariff Standards and Procedure) Rules, 1998 with respect to Quarterly Adjustments of XWDISCOs for the 1st and 2nd Quarters of FY 2020-21 | View |
01-07-2021 |
Form for submission of Motion for Leave for Review under Regulation 3(2) NEPRA (Review Procedure) Regulations, 2009 | View |
28-06-2021 | Notice of Admission/ Hearing - Petition for Modification of Tariff Determination dated 04 December 2018 filed by Pak Matiari Lahore Transmission Company (Private) Limited | View |
27-06-2021 | Invitation to Bid NEPRA Tender No. 05/2021 - NEPRA Invites Bids for Printing of Annual Report 2020-21 and State of Industry Report 2021 | View |
26-06-2021 | Modification-V in the Generation Licence of Water and Power Development Authority (WAPDA) | View |
26-06-2021 | Modification-I in the Generation Licence of Siachen Energy Limited | View |
26-06-2021 | Modification-I in the Generation Licence of Zhenfa Pakistan New Energy Company (Private) Limited (ZPNCPL) | View |
26-06-2021 | Public Notice regarding approval of the Modification-I in the Generation Licence of PEDO for its Pehur Hydel Power Plant | View |
26-06-2021 | Modification-I in the Generation Licence of Jilani Energy (Private) Limited (JEPL) | View |
23-06-2021 | NEPRA Power Safety Code for Licensees 2021 | View |
22-06-2021 | Grant of Generation Licence No. SGC/156/2021 Licence Application No. LAG-485 Matol (Private) Limited (MTPL) | View |
20-06-2021 | NEPRA Invites Application for Internship | View |
20-06-2021 | Notice of Admission/Hearing Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 36.6 MW Daral Khwar Hydropower Project located at Swat, Khyber Pakhtunkhwa Province | View |
Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 36.6 MW Daral Khwar Hydropower Project located at Swat, Khyber Pakhtunkhwa Province | View | |
19-06-2021 | Hearing regarding Quarterly Adjustments of XWDICOs on Account of Capacity Charges, Transmission Charges & MOF, Variable Operation & Maintenance Charges and Impact of T&D Losses on FCA for the 3rd Quarter of FY 2020-21 | View |
Application for Quarterly Tariff Adjustment for the 3rd Quarter of the Financial Year 2021 | View | |
18-06-2021 | Hearing regarding Fuel Charges Adjustment for the Month of May 2021 for Ex-WAPDA Distribution Companies | View |
CPPAG XWDISCOs Energy Purchase Data for the Month of May 2021 | View | |
18-06-2021 | Modification-I in the Generation Licence of International Industries Limited | View |
18-06-2021 | Notice of Admission - Petition filed by Pakistan Atomic Energy Commission for Determination of Generation Tariff of Karachi Nuclear Power Plant Unit-2 | View |
17-06-2021 | Decision of the Authority in the matter of Motion filed by the Ministry of Energy (Power Division) and request of K-Electric with respect to recommendation for Extension of 'Abolishment of Time of Use Tariff Scheme' for industrial consumers of XWDISCOs and K-Electric | View |
13-06-2021 | Proposals for Pre-Qualifications - NEPRA Tender No. 04/2021 - Mandatory Training Programme required for Promotion of the NEPRA Professionals. | View |
Pre-Qualifications Documents as Per PPRA Rules - Tender No. 04/2021 - Mandatory Training Programme required for Promotion of the NEPRA Professionals. | View | |
11-06-2021 | Press Release - NEPRAs SUO MOTO notice about excessive load shedding | View |
10-06-2021 | Notice of Admission/ Hearing - Neelum Jhelum Hydropower Project Situated in AJK under NEPRA Import of Power Regulations, 2017 | View |
Application for Determination of Reference Tariff for Import of Power from 969 MW Neelum Jhelum Hydropower Project | View | |
Issues Framed for Hearing - Tariff Application by CPPA-G on behalf of Neelum Jhelum Hydropower Company (NJHPC) | View | |
09-06-2021 | Press Release - NEPRA takes notice of the excessive load shedding | View |
09-06-2021 | Press Release - NEPRA-OGRA Joint Interactive Session | View |
07-06-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of April 2021 for XWDISCOs along with Notification Thereof | View |
04-06-2021 | Decision of the Authority in the matter of Monthly Fuel Charges Adjustments of K-Electric Limited for the period from June-December 2020 and Notification (S.R.O. 707(1)12021 dated 04.06.2021 )Thereof | View |
04-06-2021 | Notice of Admission/ Hearing Petition for Modification of Tariff Determination dated 04 December 2018 filed by Pak Matiari Lahore Transmission Company (Private) Limited | View |
Petition for Modification of Tariff Determination dated 04 December 2018 filed by Pak Matiari Lahore Transmission Company (Private) Limited | View | |
Issues for Hearing - Pak Matiari Lahore Transmission Company (Private) Limited | View | |
03-06-2021 | Public Hearing in the Matter of the Indicative Generation Capacity Expansion Plan 2021-30 (IGCEP-2021) | View |
Indicative Generation Capacity Expansion Plan 2021-30 (IGCEP-2021) | View | |
03-06-2021 | Notice for Hearing - Hearing in the matter of requests filed by K-Electric regarding monthly Fuel Charges Adjustments for the period January 2021 to April 2021, Quarterly Adjustment for the Quarter ending March 2021 under Multi Year Tariff (MYT) 2017-2023 | View |
K-Electric Monthly Cost Variation for the months of January 2021 to April 2021 under Multi-Year Tariff 2017-23 | View | |
K-Electric Quarterly Variation for the quarter January 2021 to March 2021 under Multi-year Tariff 2017-2023 | View | |
02-06-2021 | S.R.O. 660 (1)/2021 dated 31-05-2021 regarding National Electric Power Regulatory Authority (Fees) Regulations 2021 | View |
02-06-2021 |
Draft NEPRA Social Investment Guidelines
2021. Any person can file comments
within period of 30 days in the following
manner: through email: registrar@nepra.org.pk though post: Registrar, NEPRA Tower Attaturk Avenue (East), Sector G-5/1, Islamabad, Pakistan |
View |
02-06-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Sapphire Power Generation Limited | View |
Application for Modification in Generation Licence of Sapphire Power Generation Limited | View | |
01-06-2021 | Notice of Public Hearing in the Matter of Licensing (Electric Power Supplier) Regulations, 2021 and NEPRA Licensing (Distribution) Regulations, 2021 | View |
List of Issues Framed for the Public Hearing in the Matter NEPRA Licensing Regulations for Supplier and Distribution | View | |
Comments of the Stakeholders & draft NEPRA Licensing (Supplier & Distribution) Regulations 2021 | View | |
30-05-2021 | Hearing - Hearing regarding request for reconsideration of Quarterly Adjustment decision of the Authority for 1st and 2nd Quarter of FY 2020-21 for XWDISCOs | View |
Application request for reconsideration of Quarterly Adjustment decision of the Authority for 1st and 2nd Quarter of FY 2020-21 for XWDISCOs | View | |
28-05-2021 | Press Release - NEPRA-AKHUWAT Collaboration to Support NEPRA�S CSR Drive | View |
28-05-2021 | Performance Evaluation Report 2019-20 of NTDC and K-Electric | View |
28-05-2021 | Grant of Generation Licence No. SGC/155/2021 Licence Application No. LAG-493 Burj DG (Private) Limited (BDGPL) | View |
27-05-2021 | Notice of Admission - Application of AGJV (Private) Limited for grant of Generation Licence | View |
Application of AGJV (Private) Limited for grant of Generation Licence | View | |
25-05-2021 | Performance Evaluation Report (PER) of Distribution Companies for the FY 2019-20 | |
21-05-2021 | Hearing regarding Fuel Charges Adjustment for the Month of April 2021 for EX-WAPDA Distribution Companies | |
CPPAG - XWDISCOs Energy Purchase Data for the Month of April 2021 | View | |
21-05-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of K-Electric Limited (KEL) | |
Application of K-Electric for Modification of Generation Licence (GL/04/2002) | ||
21-05-2021 | Press Release - NEPRA-AKHUWAT CSR Collaboration to bring Power with Prosperity | view |
20-05-2021 | Notice of Admission / Hearing - Petition for Tariff Modification filed by Punjab Power Development Company Limited (PPBCL) for its 5.38 MW Chianwali Hydropower Project located at Chianwali, Gujranwala, Punjab Province | |
Petition for Tariff Modification filed by Punjab Power Development Company Limited (PPBCL) for its 5.38 MW Chianwali Hydropower Project | ||
20-05-2021 | Notice of Admission / Hearing - Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 2.6 MW Machai Hydropower Project located at Mardan, Khyber Pakhtunkhwa Province | |
Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 2.6 MW Machai Hydropower Project | ||
20-05-2021 | Notice of Admission / Hearing - Petition for Tariff Modification filed by Punjab Power Development Company Limited (PPBCL) for its 4.04 MW DEG-Outfall Hydropower Project located at Sheikhupura, Punjab Province | |
Petition for Tariff Modification filed by Punjab Power Development Company Limited (PPBCL) for its 4.04 MW DEG-Outfall Hydropower Project | ||
20-05-2021 | Notice of Admission - Application for Shams Power (Private) Limited for the Grant of Generation Licence | |
Application for Shams Power (Private) Limited for the Grant of Generation Licence at Shifa International Hospital Islamabad | ||
19-05-2021 | Hearing regarding extension of "Abolishment of Time of Use Tariff Scheme" for Industrial Consumers of XWDISCOs and K-Electric | |
Federal Government Motion with Respect to Recommendation for Extension of Abolishment of Time-of-USE Tariff Scheme for Industrial Consumers of EX-WAPDA DISCOs | ||
K-Electric Request for Extension of 'Abolishment of Time-of-Use Scheme' for Industrial Consumers | ||
17-05-2021 | Akhuwat-NEPRA Webinar scheduled to be held on 20th May, 2021 at 02:00 PM | |
17-05-2021 | Akhuwat-NEPRA Webinar scheduled to be held on 20th May, 2021 at 02:00 PM | |
07-05-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of March 2021 for XWDISCOs along with Notification Thereof | |
07-05-2021 | Decision of the Authority in the matter of Requests filed by XWDISCOs for Periodic Adjustment in Tariff for the Pt and 2 Quarter of FY 2020-21 | |
07-05-2021 | Notice of Admission/ Hearing - Petition for Cost-Plus Tariff Determination for Trans Atlantic Energy (Private) Limited in respect of its its 48.3 MW Wind Power Project at Jhimpir District Thatha, Sindh | |
Petition for Cost-Plus Tariff Determination for Trans Atlantic Energy (Private) Limited | ||
07-05-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Lucky Electric Power Company Limited (LEPCL) | |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Lucky Electric Power Company Limited (LEPCL) | ||
07-05-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Lucky Electric Power Company Limited (LEPCL) | |
05-05-2021 | Grant of Generation Licence No. SGC115412021 Licence Application No. LAG-488 Zero Carbon Power (Private) Limited (ZCPPL) | |
01-05-2021 | Notice of Admission/ Hearing - Power Acquisition Request filed by Multan Electric Power Company Limited (MEPCO) for Permission to Acquire 300 KW Soar and 50 KW Biogas Power from Micro Power Plant at Vehari for the Project "Energy Solution using Indigenous Resources in Village" | |
30-04-2021 | Grant of Generation Licence No. SGC/153/2021 Licence Application No. LAG-494 Directorate of Power Projects, Energy Department, Govt. of the Punjab | |
27-04-2021 | NEPRA Licensing (Application, Modification, Extension and Cancellation) Procedure Regulations, 2021 S.R.O. 521(I)/2021 | |
21-04-2021 | Hearing regarding Fuel Charging Adjustment for the Month of March 2021 for EX-WAPDA Distribution Companies | |
CPPAG - XWDISCOs Energy Purchase Data for the Month of March 2021 | ||
21-04-2021 | Determination of the Authority in the matter of Authority Proposed Modification (APM) in the Distribution Licence of K-Electric Limited. | |
19-04-2021 | Decision of the Authority in the matter of Tariff Petition filed by Uzghor Hydropower (Pvt.) Ltd. (UHPCO) for Tariff Determination of 82.25 MW Turtonas Uzghor Hydropower Project | |
09-04-2021 | Press Release - Reduction in Tariff of Bagasse, Wind and Solar PV Power Plants established under Renewable Energy Policy 2006 | view |
09-04-2021 |
Decision of the
Authority in the matter of Application
filed by Central Power Purchasing Agency
Guarantee Ltd. (CPPA-G) for Adjustment
in Components of Tariff pursuant to
Signing of Master Agreement with FFC
Energy Ltd. (FFCEL) |
|
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with Hamza Sugar Mills Ltd. (HSML) | view |
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with Chanar Energy Ltd. (CEL) | view |
09-04-2021 |
Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with Artistic Energy (Pvt.) Ltd. (AEPL) | |
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with AJ Power (Pvt.) (AJPPL) | |
09-04-2021 |
Decision of the Authority in the matter of
Application filed by Central Power Purchasing Agency Guarantee
Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to
Signing of Master Agreement with Harappa Solar (Pvt.) Ltd. (HSPL) |
|
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power� Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with Al-Moiz Industries Ltd. (AMIL) | View |
09-04-2021 |
Decision of the
Authority in the matter of Application
filed by Central Power Purchasing Agency
Guarantee Ltd. (CPPA-G) for Adjustment
in Components of Tariff pursuant to
Signing of Master Agreement with Act
Wind Power (Pvt.) Ltd. |
|
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with JDW Sugar Mills Ltd. (Unit-Ill) | view |
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with JDW Sugar Mills Ltd. (Unit-II) | view |
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with Thal Industries Corporation Ltd. (TICL) | View |
09-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment in Components of Tariff pursuant to Signing of Master Agreement with RYK Mills Ltd. (RYKML) | view |
09-04-2021 |
Notice of Hearing - Hearing regarding Adjustments Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2020-21 and Prior Period Adjustment in the Consumer end Tariff of Lahore Electric Supply Company Limited (LESCO) | |
Adjustments Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2020-21 and Prior Period Adjustment in the Consumer end Tariff of LESCO | ||
Issues in the matter of adjustment request filed by LESCO for adjustment in tariff for the FY 2020-21. | ||
09-04-2021 |
Notice of Hearing - Hearing regarding Adjustments Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2020-21 and other adjustments in the Consumer end Tariff of Islamabad Electric Supply Company Limited (IESCO) | |
Adjustments Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2020-21 and other adjustments in the Consumer end Tariff of IESCO | ||
Issues in the matter of adjustment request filed by IESCO for adjustment in tariff for the FY 2020-21. | ||
09-04-2021 |
Notice of Hearing - Hearing regarding Adjustments Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2020-21 and Prior Period Adjustment in the Consumer end Tariff of Faisalabad Electric Supply Company Limited (FESCO) | |
Adjustments Request for Indexation of Multi Year Tariff (MYT) Components for the FY 2020-21 and Prior Period Adjustment in the Consumer end Tariff of FESCO | ||
Issues in the matter of adjustment request filed by FESCO for adjustment in tariff for the FY 2020-21. | ||
07-04-2021 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the month of February 2021 for XWDISCOs along with Notification Thereof | |
05-04-2021 |
Determination of the Authority in the matter of Tariff Petition filed by WAPDA Hydroelectric for FY 2020-21 | |
02-04-2021 | Press Release - Reduction in Tariff of Twelve (12) Thermal Power Plants Established Under Power Generation Policy 2002 | View |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the signing of the Master Agreement with Nishat Power Ltd. (NPL) | View |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the signing of the Master Agreement with Nishat Chunian Power Ltd. (NCPL) | |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the Signing of the Master Agreement with Atlas Power Ltd. (APL) | view |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the signing of the Master Agreement with Narowal Energy Ltd. (NEL) | view |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the Agreement dated February 11, 2021 with Foundation Power Company Daharki Ltd. (FPCDL) | view |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the signing of the Master Agreement with Liberty Power Tech Ltd. (LPTL) | View |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the Agreement dated February 11, 2021 with Halmore Power Generation Company Ltd. (HPGCL) | view |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the Agreement with Sapphire Electric Company Ltd. (SECL) | |
02-04-2021 |
Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the Agreement with Saif Power Ltd. (SPL) | |
02-04-2021 |
Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the Agreement with Orient Power Company (Pvt.) Ltd. (OPCL) | view |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the Agreement with Attock Gen Ltd. (AGL) | View |
02-04-2021 | Decision of the Authority in the matter of Application filed by Central Power Purchasing Agency Guarantee Ltd. (CPPA-G) for Adjustment of ROE and ROEDC Components of Tariff pursuant to the signing of the Master Agreement with Engro Powergen Qadirpur Ltd. (EPQL) | View |
01-04-2021 | Publication of Draft Amendment to the National Electric Power Regulatory Authority (Review Procedure) Regulations, 2009 for Eliciting Public Opinion within 30 days | View |
26-03-2021 | Invitation to Bid NEPRA Tender No. 03/2021 - NEPRA Invites Bids for Civil Works from firms | View |
24-03-2021 | NEPRA Energy Week, 2021, in view of the recent hike in Covid-19 cases, has been POSTPONED till further notice | |
20-03-2021 | Publication of Notification of NEPRA Licensing (Electric Power Supplier) Regulations, 2021 for eliciting public opinion within 30 days | view |
Draft NEPRA Licensing (Electric Power Supplier) Regulations, 2021 | view | |
Presentation NEPRA Licensing (Electric Power Supplier) Regulations, 2021 | view | |
20-03-2021 | Publication of Notification of NEPRA Licensing (Distribution) Regulations, 2021 for eliciting public opinion within 30 days | view |
Draft NEPRA Licensing (Distribution) Regulations, 2021 | view | |
Presentation NEPRA Licensing (Distribution) Regulations, 2021 | view | |
19-03-2021 | Hearing regarding Fuel Charges Adjustment for the Month of February 2021 for EX-WAPDA Distribution Companies | view |
CPPA - XWDISCOs Energy Purchase Data for the month of February 2021 | view | |
18-03-2021 | SAARC Energy Regulators to be rescheduled on 08-09-2021 | |
17-03-2021 | Notice of Hearing - Hearing regarding Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the 1st & 2nd Quarter of the FY 2020-21 | view |
Application for Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the 1st & 2nd Quarter of the FY 2020-21 | view | |
17-03-2021 | Notice of Admission / Hearing - Petition filed by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) for Determination of its Market Operation Fee for the FY 2020-21 | view |
CPPA-G Petition for the Determination of Market Operation Fee for the Financial Year 2020-21 | view | |
Addendum CPPA-G Petition for the Determination of Market Operation Fee for the Financial Year 2020-21 | view | |
Issues for Hearing - Petition for determination of market operation fee for the Financial Year 2020-21 | view | |
16-03-2021 | Notice of Admission - Application of Grid Edge (Private) Limited for Grant of Generation Licence | view |
Application of Grid Edge (Private) Limited for Grant of Generation Licence | view | |
15-03-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of 69 MW Lawi Hydropower Project | view |
13-03-2021 | Press Release - NEPRA directed HESCO and SEPCO to ensure uninterrupted power supply | View |
10-03-2021 | Decision of the Authority in the matter of Quarterly Adjustments of K-Electric Limited for the period from April 2019 to March 2020 | View |
10-03-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of 40.8 MW Koto Hydropower Project | view |
10-03-2021 | Decision of the Authority in the matter of Change of Base Year 2007-2008 to Base Year 2015-16 for Consumer Price Index (CPI) for Indexation of Fixed and Variable O&M (Local) Components of Generation Tariff | View |
09-03-2021 | Decision of the Authority in the matter of Fuel Charges Adjustments for the Period from July 2019 to May 2020 for K-Electric Limited and Notification (S.R.O.293(1)/2021 dated 09.03.2021) Thereof | View |
09-03-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of January 2021 for XWDISCOs along with Notification Thereof | |
09-03-2021 | Decision of the Authority in the matter of Request filed by Central Power Purchasing Agency (Guarantee) Limited for Procurement of Power from 102 MW Gulpur Hydrpower Project of Mira Power Ltd. | View |
08-03-2021 | Press Release - NEPRA celebrates International Womens Day | |
05-03-2021 | Order of the Authority in the matter of Final Approval of the Initialed Tripartite Power Purchase Agreement in respect of K-Electric Ltd. for Additional Power Supply of 150 MW from National Grid | View |
05-03-2021 | Publication of Draft NEPRA Power Purchase Agreements (Review and Approval) Regulations, 2021 for eliciting public opinion within 30 days | View |
05-03-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Trans Atlantic Energy (Private) Limited | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Trans Atlantic Energy (Private) Limited | View | |
05-03-2021 | Notice of Admission/ Hearing - Tariff Petitions filed by Siachen Energy Limited for the Determination of Generation Tariff in respect of 100 MWp Solar PV Power Plant | View |
Tariff Petitions of Siachen Energy Limited for the Determination of Generation Tariff in respect of 100 MWp Solar PV Power Plant | View | |
03-03-2021 | Request for Expression of Interest - Reformation of Panel of Lawers/ Chambers/ Firms | View |
01-03-2021 | Revised / Modified Template of O&M Agreement | |
27-02-2021 | Notice of Admission / Hearing Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Solar PV Independent- Power Producers (IPPs). | |
Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Solar PV Independent- Power Producers (IPPs). | ||
27-02-2021 | Notice of Admission - Application of Artistic Hydro II (Private) Limited for Grant of Generation Licence | |
Application of Artistic Hydro II (Private) Limited for Grant of Generation Licence | ||
27-02-2021 | Notice of Admission - Atlas Energy Limited for the Grant of Generation Licence | |
Application of Atlas Energy Limited for the Grant of Generation Licence | ||
27-02-2021 | Notice of Admission - Burj DG (Private) Limited for Grant of Generation Licence | |
Application of Burj DG (Private) Limited for Grant of Generation Licence | ||
26-02-2021 | Press Release - Grant of Licence to Khyber Pakhtunkhwa Transmission & Grid System Company (Private) Limited as a Provincial Grid Company | |
26-02-2021 | Grant of Transmission Licence to act as Provincial Grid Company. Licence Application No. LAT-07 Khyber Pakhtunkhwa Transmission and Grid System Company (Private) Limited | |
26-02-2021 | Notice of Admission/ Hearing - Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Independent Power Producers (IPPs) | |
Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Independent Power Producers (IPPs) | view | |
26-02-2021 | Notice of Admission/ Hearing - Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Bagasse Co-Gen Independent Power Producers (IPPs) | |
Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Bagasse Co-Gen Independent Power Producers (IPPs) | ||
26-02-2021 | Notice of Admission/ Hearing - Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Wind based Independent Power Producers (IPPs) | |
Application for Adjustment in Components of Tariff pursuant to Agreements entered between Power Purchaser and Wind based Independent Power Producers (IPPs) | ||
24-02-2021 | Press Release - Reduction in Tariff of the Nuclear Power Plants | |
24-02-2021 | Determination of the Authority in the matter of Petition for Revision of Tariff Determination filed by Quaid-e-Azam Thermal Power (Pvt.) Ltd. for Reduction of Return on Equity (ROE) Component | |
24-02-2021 | Determination of the Authority in the matter of Petition for Revision of Tariff Determination filed by Punjab Thermal Power (Pvt.) Ltd. for Reduction of Return on Equity (ROE) Component | |
24-02-2021 | REQUEST OF SADIQABAD POWER (PRIVATE) LIMITED (SPPL) FOR CANCELLATION OF ITS GENERATION LICENCE NO. IGSPLI99I2018 DATED JULY 17, 2018 | View |
23-02-2021 | REQUEST OF GHOTKI POWER (PRIVATE) LIMITED (GPPL) FOR CANCELLATION OF ITS GENERATION LICENCE NO. LGSPL/96/2017 DATED NOVEMBER 27, 2017 | View |
23-02-2021 | Inquiry Report regarding Total Power System Collapse dated 9th January 2021 | View |
20-02-2021 | Press Release - Barriers and Drivers of Solar Prosumage: A Case Study of Pakistan� launched NEPRA providing enabling regulatory environment for clean energy goals | View |
19-02-2021 | Press Release - First-ever Webinar on Industrial Security hosted by NEPRA | View |
19-02-2021 | Hearing regarding Fuel Charges Adjustment for the month of January 2021 for EX-WAPDA Distribution Companies | View |
CPPAG XWDISCOs Energy Purchase Data for the month of January 2021 | View | |
17-02-2021 | Grant of Generation Licence No. IGSPL/107/2021 Licence Application No. LAG-434 Master Hydro (Private) Limited (MIHPL) | View |
17-02-2021 | Notification of Tariff of XWDISCOs - S.R.O.182(I)/2021 to S.R.O.191(I)/2021 | View |
17-02-2021 | Notification of K-Electric S.R.O.192(I)/2021 | View |
17-02-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of HNDS Energy (Private) Limited | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of HNDS Energy (Private) Limited | View | |
17-02-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Meridian Energy (Private) Limited | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Meridian Energy (Private) Limited | View | |
17-02-2021 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Helios Power (Private) Limited | View |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Helios Power (Private) Limited | View | |
16-02-2021 |
National Electric Power Regulatory Authority (Selection
of Operation and Maintenance Contractors by Generation Companies)
Guidelines, 2021 |
|
16-02-2021 | Grant of Generation Licence No. GL/2712021 Licence Application No. LAG-486 Pakistan Atomic Energy Commission (PAEC) | View |
16-02-2021 | Decision of the Authority in the matter of approval of Request for Proposal (RFP) Packages submitted for Competitive Bidding of Wind & Solar Power Projects falling under Category-Ill of the Decision of Cabinet Committee on Energy | View |
12-02-2021 | Decision of the Authority in the matter of Motion filed by the Federal Government under Section 7, 31(4) and 31(7) of the NEPRA Act 1997 read with Rule 17 of the NEPRA (Tariff Standards and Procedure) Rules, 1998 with respect to Recommendation of the Consumer-end Tariff for XWDISCOs | View |
10-02-2021 | Grant of Generation Licence No. SGC/152/2021 Licence Application No. LAG-454 Mughal Energy Limited (MEL) | View |
10-02-2021 | Decision of the Authority in the matter of Requests filed by XWDISCOs for Periodic Adjustment in Tariff for the 4th Quarter of FY 2019-20 | View |
10-02-2021 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of December 2020 for XWDISCOs along with Notification Thereof | View |
10-02-2021 | Publication of Draft amendment to the National Electric Power Regulatory Authority Licensing (Application, Modification, Extension and Cancellation) Procedure Regulations, 1999 for eliciting Public Opinion within 30 days | View |
09-02-2021 | Grant of Generation Licence No. GL(Hydel)/17/2021 Licence Application No. LAG-475 Pakhtunkhwa Energy Development Organization (PEDO) (Lawi Hydropower Project) | View |
09-02-2021 |
Notice of Hearing - Hearing in the matter
of requests filed by K-electric regarding
Monthly Fuel Charge Adjustment for the
period June 2020 to December 2020, Quarterly
Adjustments for the Quarters ending June
2020, September 2020 & December 2020 under Multi
Year Tariff (MYT) 2017-2023 |
|
K-electric Monthly Cost Variation for the
for the period June 2020 to December 2020,
|
||
K-electric , Quarterly Variation
for the Quarters ending June 2020,
September 2020 & December 2020 under Multi Year
Tariff (MYT) 2017-2023 |
||
08-02-2021 | Determination of the Authority in the matter of Petition filed by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) for Determination of Market Operation Fee for the FY 2019-20 | View |
08-02-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of 11.8MW Karora Hydropower Project | view |
06-02-2021 |
Notice of Hearing - in the matter of
Modification Petition filed by Jamshoro Power
Company Limited |
|
04-02-2021 |
Notice of Admission - Generation Licence
Application of Pakhtunkhawa Energy
Development Organization |
|
Application of Pakhtunkhawa Energy
Development Organization for Grant of
Generation Licence |
||
04-02-2021 |
Notice of Admission - Application of
Artistic Hydro (Private) Limited for Grant
of Generation Licence |
|
Application of Artistic Hydro
(Private) Limited for Grant of Generation
Licence |
||
30-01-2021 |
Notice of Admission/ Hearing in respect
for Determination of Consumer End Tariff
filed by the
Federal Government under Section 7, 31(4) and 31(7) of
NEPRA Act read with Rule 17 of the NEPRA Tariff
(Standards and Procedures) Rules, 1998
|
|
Federal Government Motion with respect to
Recommendation of Consumer End Tariff for
XWDISCOs, under Section 31(4) and 31(7) of
the Regulation of Generation, Transmission and
Distribution of Electric Power Act 1997 (The
Act) read with Rule 17 of the NEPRA Tariff
(Standards and Procedures) Rules, 1998
|
||
29-01-2021 |
Addendum to the Notice of
Public Hearing about the application of Khyber Pakhtunkhwa Transmission & Grid System Company (Private) Limited for the Grant of Licence as Provincial Grid Company
|
|
29-01-2021 |
Notice of Admission -
Application of YDE SA (SMC-Private) Limited
for grant of Generation Licence |
|
Application of YDE SA (SMC-Private) Limited for grant of Generation Licence | view | |
26-01-2021 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s. Safe
Solar Power (Pvt.) Ltd. for Determination of
Generation Tariff in respect of 10.275 MWp Solar
PV Power Project |
|
23-01-2021 | Notice of Public Hearing in the Matter of Application of Khyber Pakhtunkhwa Transmission & Grid System Company (Pvt.) Limited for the Grant of Licence as Provincial Grid Company | |
Issues in the Matter of Application of Khyber Pakhtunkhwa Transmission & Grid System Company (Pvt.) Limited for the Consideration of Grant of Provincial Grid Company | ||
Comments of NTDC, CPPA-G and PPDB in the Matter of Application of Khyber Pakhtunkhwa Transmission & Grid System Company (Pvt.) Limited | ||
Notice of Admission - Application of Khyber Pakhtunkhwa Transmission & Grid System Company (Pvt.) Ltd. for grant of Transmission Licence for Provincial Grid Company | ||
Application of Khyber Pakhtunkhwa Transmission & Grid System Company (Pvt.) Ltd. for grant of Transmission Licence for Provincial Grid Company | ||
22-01-2021 | Draft NEPRA Health, Safety and Environment (HSE) Code 2021 for Licensees Review | |
21-01-2021 | Decision of the Authority in the matter of Motion for Leave for Review filed by Iran-Pak Wind Power (Pvt.) against the Tariff Determination dated August 18, 2020 | |
21-01-2021
|
Hearing regarding Fuel Charges Adjustment for the Month of December 2020 for Ex-WAPDA Distribution Companies | |
CPPAG Energy Purchase Data for the Month of December 2020 | View | |
21-01-2021
|
Notice of Admission / Hearing - Petitions for Revision of Tariff Determinations of Quaid-e- Azam Thermal Power (Pvt.) Ltd., Punjab Thermal Power (Pvt.) Ltd and Quaid-e-Azam Solar (Pvt.) Ltd for Reducation of Return on Equity (ROE) Component | |
Petitions for Revision of Tariff Determinations of Quaid-e- Azam Thermal Power (Pvt.) Ltd for Reducation of Return on Equity (ROE) Component | ||
Petitions for Revision of Tariff Determinations of Punjab Thermal Power (Pvt.) Ltd for Reducation of Return on Equity (ROE) Component | ||
Petitions for Revision of Tariff Determinations of Quaid-e-Azam Solar (Pvt.) Ltd for Reducation of Return on Equity (ROE) Component | View | |
19-01-2021
|
Press Release - NEPRA Unveils Its CSR Drive "Power with Prosperity" |
|
18-01-2021
|
Approval of Heat Rate for 97 MW KGTPS of K-Electric
(KE) |
|
18-01-2021
|
Approval of Heat Rate for 97MW Site Gas Turbine Power
Station (SGTPS) of K-Electric (KE) |
|
14-01-2021
|
Decision of the Authority pursuant to the Judgment
dated 08.09.2020 of Honorable Peshawar High Court, Peshawar in Writ
Petitions No. 4932/20, 5210/20, 4200/20, 4543/20, 5255/20 and Judgment
Dated 29.09.2020 passed by Honorable Peshawar High Court, Mingora Bench
/ Dar ut Qaza Swat in WP No. 847-M/2020 |
|
14-01-2021
|
Notice of Hearing - Modification Petition filed
by Central Power Purchasing Agency (Guarantee) Limited for
approval of Negotiated/ Signed Power Purchase Agreement regarding
procurement of Power from 102 MW Gulpur Hydropower Project of
Mira Power Limited |
|
Application for Modification Petition filed by
Central Power Purchasing Agency (Guarantee) Limited for approval
of Negotiated/ Signed Power Purchase Agreement regarding procurement of
Power from 102 MW Gulpur Hydropower Project of Mira Power
Limited |
||
13-01-2021
|
Case Officer's report in the matter of
Modification of the Tariff Determination - Sindh Transmission &
Dispatch Company Company (Pvt.) Limited (STDC) |
|
13-01-2021
|
Consumer Service Manual - January 2021 |
|
11-01-2021 |
Decision of the Authority in
the matter of Wheeling Costs to be
included in the Tariff Determination of
DISCOs under Annual & Multi-Year Tariff
Regime (FY 2018-19 & FY 2019-20)
|
|
11-01-2021 |
Press Release - Peshawar
Electric Supply Company (PESCO) fined Rs. 13
Million |
|
11-01-2021 |
Postponement of Hearing
in the matter of Modification petition filed by
Jamshoro Power Company Limited (JPCL) |
|
11-01-2021 |
Press Release - NEPRA to Investigate the Nationwide Power Blackout |
|
11-01-2021 |
Decision of the Authority in
the matter of Fuel Charges Adjustment for
the months of October 2020 & November 2020 for
XWDISCOs alone with Notification Thereof |
|
09-01-2021 |
Publications of draft
amendment to the National Electric Power
Regulatory Authority (Fees Pertaining to the
Tariff Standards and Procedure) Regulations,
2002 for eliciting public opinion within 30
days |
|
07-01-2021 |
Notice of Admission -
Generation Licence Application of Pakhtunkhwa
Energy Development Organization (Gabral
Hydropower Project) |
|
Application for
Generation Licence of Pakhtunkhwa Energy
Development Organization (Gabral Hydropower
Project) |
||
07-01-2021 |
Notice of Admission -
Generation Licence Application of Pakhtunkhwa
Energy Development Organization (Madyan
Hydropower Project) |
|
Application for
Generation Licence of Pakhtunkhwa Energy
Development Organization (Madyan Hydropower
Project) |
||
03-01-2021 | Vacant Positions - (Sr. Advisor's) | View |
03-01-2021 | Vacancy Announcements (DD, AD, Jr. Exe) | View |
01-01-2021 |
Notice of Hearing -
Tariff Modification Petition for Approval/
Determination of Revised Tariff for Jamshoro
Power Company Limited (JPCL) |
31-12-2020 | Grant of Generation Licence No. IGSPL/106/2020 Licence Application No. LAG-482 Uzghor Hydro Power Company (Private) Limited (IJHPCPL) | View |
31-12-2020 |
Notice of Hearing -
Petition for Modification Cycle Power Plant
Nandipur Gujranwala Northern Power
Generation Company Limited - (GENCO-III) |
|
30-12-2020 | Determination of the Authority in the matter of Petition filed by Sukkur Electric Power Company Ltd. (SEPCO) for Determination of its Supply Tariff for the FY 2018-19 & FY 2019-20 | view |
30-12-2020 |
Determination of the Authority
in the matter of Tariff Petition filed by
Northern Power Generation Company Ld. (NPGCL)
for its Old Blocks of Muzaffar Garh Units 1-6
and GTPS Faisalabad Units 5-9 |
|
30-12-2020 |
Decision of the Authority in
the matter of Review Motion filed by Anoud
Power Generation Ltd. (APGL) regarding
Monthly Fuel Charges and Quarterly Adjustments
of K-Electric Limited for the period from
July 2016 to June 2019 |
|
30-12-2020 |
Order of the Authority under
Rule 4(6) of the National Electric Power
Regulatory Authority (Fines) Rules, 2002 in the
matter of Explanation dated January 16, 2020
issued to Sanjwal Solar Power (Private) Ltd. |
|
30-12-2020 |
Decision of the Authority in
the matter of Tariff Petition filed by
Pakhtunkhwa Energy Development Organization (PEDO)
for Tariff Determination of 10.2 MW Jabori
Hydropower Project |
|
30-12-2020 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s.
Access Electric (Private) Ld. for
Determination of Generation Tariff in respect of
10 MWp Solar PV Power Project |
|
30-12-2020 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s.
Access Solar (Private) Ld. for Determination
of Generation Tariff in respect of 11.52 MWp
Solar PV Power Project |
|
30-12-2020 |
Notice of Admission/ Hearing -
Tariff Revision Petitions in COD Tariff
Determinations of the NEPRA dated 20th
May 2020 for 1230.54 MW (Gross) Power
Project at Haveli Bahadurshah &
1223.106 MW at Balloki, Punjab |
|
NPPMCL Tariff Revision Petitions in COD Tariff Determinations of the NEPRA dated 20th May 2020 for Power Project at Haveli Bahadurshah | ||
NPPMCL Tariff Revision Petitions in COD Tariff Determinations of the NEPRA dated 20th May 2020 for Power Project at Balloki, Punjab | ||
24-12-2020 |
Determination of the Authority in the
matter of Petition filed by Multan
Electric Power Company Ltd. (MEPCO)
for Determination of its Supply
of Power Tariff for the FY 2018-19 & FY
2019-20 |
|
24-12-2020 |
Determination of the Authority in the
matter of Petition filed by Multan
Electric Power Company Ltd. (MEPCO)
for Determination of its Distribution
Tariff for the FY 2018-19 & FY 2019-20 |
|
24-12-2020 | Determination of the Authority in the matter of Petition filed by Sukkur Electric Power Company Ltd. (SEPCO) for Determination of its Distribution Tariff for the FY 2018-19 & FY 2019-20 | view |
24-12-2020 |
Determination of the Authority in the
matter of Petition filed by Gujranwala
Electric Power Company Ltd. (GEPCO)
for Determination of its Supply
of Power Tariff for the FY 2019-20 |
|
24-12-2020 |
Determination of the Authority in the
matter of Petition filed by Gujranwala
Electric Power Company Ltd. (GEPCO)
for Determination of its Distribution
Tariff for the FY 2019-20 |
|
24-12-2020 |
Determination of the Authority in the
matter of Petition filed by Gujranwala
Electric Power Company Ltd. (GEPCO)
for Determination of its Supply
of Power Tariff for the FY 2018-19 |
|
24-12-2020 |
Determination of the Authority in the
matter of Petition filed by Gujranwala
Electric Power Company Ltd. (GEPCO)
for Determination of its Distribution
Tariff for the FY 2018-19 |
|
23-12-2020 |
Notification of Tariff of
XWDISCOs SROs. 1372-(I)/ 2020
to SROs 1381 (1)/2020 |
|
23-12-2020 | Hearing regarding Fuel Charges Adjustment for the Months of October and November 2020 for Ex-WAPDA Distribution Companies | view |
CPPAG XWDISCO's - Energy Purchase Data for the Month of October 2020 | view | |
CPPAG XWDISCO's - Energy Purchase Data for the Month of November 2020 | view | |
23-12-2020 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Western Energy (Private) Limited | view |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Western Energy (Private) Limited | view | |
23-12-2020 | Notice of Admission - Petitions for Tariff Modification of Chashma Nuclear Power Generation Station in respect of C2, C3 and C4 to the Extent of ROE Component | view |
22-12-2020 | Press Release - NEPRA Hosted Webinar on CTBCM Model | view |
16-12-2020 | Postponement of Fuel Charges Adjustment Hearing for the Month of October 2020 for EX-WAPDA Distribution Companies | view |
16-12-2020 | Notice of Admission - Application of Directorate of Power Projects Energy Department, Government of Punjab for Grant of Generation Licence | view |
Application of Directorate of Power Projects Energy Department, Government of Punjab for Grant of Generation Licence | view | |
16-12-2020 | Notice of Admission - Application of Burj DG (Private) Limited for Grant of Generation Licence | view |
Application of Burj DG (Private) Limited for Grant of Generation Licence | view | |
14-12-2020 | Decision of the Authority in the matter of Fuel Charges Adjustment for the month of September 2020 for XWDISCOs along with Notification Thereof | view |
11-12-2020 | Notice of Hearing: Hearing regarding Fuel Charges Adjustment for the month of October 2020 for Ex-Wapda Distribution Companies. | view |
XWDISCO's - Energy Purchase Data for the Month of October 2020 | view | |
11-12-2020 | Notice of Admission: Application of Nestle Pakistan (Pvt) Ltd Sheikhupura for Grand of Generation Licence | view |
Application for seeking Generation Licence Nestle Pakistan (Pvt.) Limited Sheikhupura | view | |
11-12-2020 | Notice of Admission: Application of Nestle Pakistan (Pvt) Ltd Kabirwala for Grand of Generation Licence | view |
Application for seeking Generation Licence Nestle Pakistan (Pvt.) Limited Kabirwala | view | |
11-12-2020 | Notice: Licensee Proposed Modification in the Generation Licence of Jilani Energy (Pvt) Ltd | view |
Application for Licensee Proposed Modification (LPM) in the Generation License of Jilani Energy (Pvt.) Limited (JEPL) |
view | |
07-12-2020 | ||
Notice of Admission: Petition for Modification of Reference Tariff of Combined Cycle Power Plant Nandipur Gujranwala (Northen Power Generation Company Limited (GENCO-III) | view | |
Petition for Modification of Reference Tariff of Combined Cycle Power Plant Nandipur Gujranwala Northen Power Generation Company Limited (GENCO-III) |
view | |
01-12-2020 | Decision of the Authority in the matter of Motion filed by the Ministry of Energy (Power Division) with respect to recommendations of Support Package for Additional Consumption and Abolishment of Time of Use Tariff Scheme for Industrial Consumers of XWDISCOs | view |
01-12-2020 | Decision of the Authority in the matter of Request of the Ministry of Energy (Power Division) for Incorporation of Support Package for Additional Consumption and Abolishment of Time of Use Tariff Scheme for Industrial Consumers of K-Electric | view |
25-11-2020 |
Re-Hearing regarding Quarterly Adjustments of XWDISCOs on account of variation in Power Purchase Price (PPP) for the 4th quarter of FY 2019-20 |
view |
Applications for Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the 4th Quarter of FY 2019-20 | View | |
Revised 4th Quarter Adjustment of Tariff of LESCO for the FY 2019-20 | view | |
Revised 4th Quarter Adjustment of Tariff of SEPCO for the FY 2019-20 | view | |
Revised 4th Quarter Adjustment of Tariff of TESCO for the FY 2019-20 | view | |
24-11-2020 | Notice of Admission - Tariff Modification Petition for Approval/ Determination of Revised Tariff for Jamshoro Power Company Limited | view |
Revised Tariff Petition for Approval/ Determination of Revised Tariff for Jamshoro Power Compay Limited (JPCL) | view | |
23-11-2020 | Petition for Modification of Reference Tariff of Combined Cycle Power Plant Nandipur Gujranwala (Northern Power Generation Company Limited - GENCO-III | view |
20-11-2020 | Rebuttal by NEPRA - A Private News channel and some social media accounts are airing a news that NEPRA has initiated an enquiry against Ex- Prime Minister of Pakistan, Mr. Shahid Khaqan Abbasi with respect to theft of electricity and illegal connections. It is clarified that NEPRA is not conducting any enquiry in this regard | view |
20-11-2020 | Notice of Admission - Application of Ittehad (Private) Limited for Grant of Generation Licence | view |
Application of Ittehad (Private) Limited for Grant of Generation Licence | view | |
18-11-2020 | Notice of Admission/ Hearing - Tariff Modification Petition in Tariff Determination of the NEPRA Dated 24th February 2006 for Central Power Generation Company Limited (CPGCL) | view |
Tariff Petition for Revision/ Modification in Tariff Determination of the NEPRA dated 24th February, 2006 for Central Power Generation Company Limited (CPGCL) | view | |
17-11-2020 | Draft of New / Revised O&M Template for seeking public comments within 15 days | view |
17-11-2020 | Notice of Admission - Gawadar Free Zone Company Limited for Grant of Generation Licence | view |
Application of Gawadar Free Zone Company Limited for Grant of Generation Licence | view | |
17-11-2020 | Notice of Admission - Zero Carbon Power (Pvt) Limited for Grant of Generation Licence | view |
Application of Zero Carbon Power (Pvt) Limited for Grant of Generation Licence | view | |
13-11-2020 | Decision of the Authority in the Matter of Motion for Leave for Review filed by Port Qasim Electric Power Company (Private) Limited against the Decision of the Authority in the Matter of Adjustment Of Sinosure Component of Capacity Charge Part of Tariff dated 23 July 2020 | view |
12-11-2020 |
Determination of the Authority in the matter of Detailed Design and Implementation Roadmap of the Competitive Trading Bilateral Contract Market (CTBCM) | View |
12-11-2020 |
Grant of Generation Licence No. SGC/151/2020 Licence Application No. LAG-476 Bulleh Shah Packa2ing (Private) Limited (BSPPL) | View |
11-11-2020 |
Notice of Hearing - Hearing regarding Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the 4th Quarter of FY 2019-20 | View |
Applications for Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the 4th Quarter of FY 2019-20 | View | |
11-11-2020 |
Notice of Admission/ Hearing - Application of Sapphire Hydro Limited for Grant of Generation Licence | View |
Application of Sapphire Hydro Limited for Generation License for 152.12 MW Sharmai Hydro Power Project Located at Panjkora River, Upper Dir KPK | View | |
11-11-2020 |
Notice of Admission - Generation Licence Application of Pakistan Atomic Energy Commission (PAEC) for its Karachi Nuclear Power Plant Unit-3 (KANUPP-3) | View |
10-11-2020 |
Press Release - NEPRA Approves Detailed Design & Implementation Plan of CTBCM | View |
10-11-2020 |
Notice of Admission/ Hearing - Tariff Petition of Trident Power JR Private Limited for 7.55 MW LCC Hydropower Project, District Gujranwala | View |
Tariff Petition of LCC Hydro Power Project for 7.55 MW at Lower Chenab Canal Road Gujranwala | View | |
10-11-2020 |
Notice of Admission/ Hearing - Tariff Petition of Trident Power JB Private Limited for 4.6 MW Ravi Hydropower Project at LBDC RD 260+000, Okara Cantt | View |
Tariff Petition of Trident Power JB Private Limited for 4.6 MW Ravi Hydropower Project at LBDC RD 260+000, Okara Cantt | View | |
10-11-2020 |
Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Pakistan Atomic Energy Commission (PAEC) for its Karachi Nuclear Power Plant | View |
09-11-2020 |
Decision of the Authority in the matter of Fuel Charges Adjustment for the Month of August 2020 for XWDISCOs alone with Notification Thereof | View |
05-11-2020 |
S.R.O 1175(1) 2019 Dated 03-11-2020. Amendment in Net-Metering Regulation 2015 | View |
05-11-2020 |
Notice - Licencee Proposed Modification in the Generation Licence of RYK Mills Limited | |
LPM filed by RYK Mills Limited | View | |
04-11-2020 |
Notice of Hearing - Petition filed by WAPDA Hydroelectric for Revision of Tariff for FY 2020-21 for Supply of Power from WAPDA Hydel Power Stations | |
29-10-2020 |
Decision of the Authority pursuant to the Judgment dated 03.09.2020 of Honorable Peshawar High Court in Writ Petition No. 5180-P/2019: and other Petitions regarding Decision of the Authority in the matter of requests filed by XWDISCOs for Periodic Adjustment in the Tariff | |
26-10-2020 |
Press Release - NEPRA Organizes Breast Cancer Awareness Session | |
23-10-2020 |
Addendum to Notice of Admission/ Hearing - Amendment to Modification Petition dated 30th July 2020 to include an Open Cycle Tariff for the 747 MW CCP at Guddu in CPGCLs Notified Tariff | |
Tariff Modification Petition to include an Open Cycle Tariff for the 747 MW (Gross) at Guddu in CPGCL�s Notified Tariff | ||
23-10-2020 |
Notice of Hearing - Change of Base Year 2015-16 from Base Year 2007-08 for Consumer Price Index (CPI) | |
22-10-2020 |
Notice of Admission - Application of Khyber Pakhtunkhwa Transmission & Grid System Company (Pvt.) Ltd. for grant of Transmission Licence for Provincial Grid Company | |
Application of Khyber Pakhtunkhwa Transmission & Grid System Company (Pvt.) Ltd. for grant of Transmission Licence for Provincial Grid Company | ||
21-10-2020 |
Hearing regarding Fuel Charges Adjustment for the Month of September 2020 for Ex-WAPDA Distribution Companies. | |
CPPAG XWDISCOs Energy Purchase Data for the month of September 2020 | ||
20-10-2020 |
NEPRA State of Industry Report 2020 | View |
20-10-2020 |
NEPRA Annual Report 2019-20 | View |
16-10-2020 |
Grant of Generation Licence No. GL(Hydel)/16/2020 Licence Application No. LAG-474 Pakhtunkhwa Energy Development Organization (PEDO) (Koto Hydel Power Plant) | View |
17-10-2020 |
Notice Regarding Public Hearing In the Matter of the Request for Proposal (RFP) Documents submitted by Alternative Energy Development Board (AEDB) for Competitive Bidding of Wind & Solar PV Power Projects Falling under Category III of the CCoEs Decision | |
List of Issues in the RFP Documents submitted by AEDB for Wind and Solar PV Power Projects under Category-III | ||
Draft RFP for Wind Power Projects | ||
Draft RFP for Solar PV Power Projects | ||
10-10-2020 |
Notice of Admission/ Hearing - Tariff Modification Petition to include an Open Cycle Tariff for the 747 MW (Gross) at Guddu in CPGCL's Notifies Tariff | View |
Tariff Modification Petition to include an open cycle Tariff for the 747 MW CCPP at Guddu in CPGCL's notified Tariff under Section 3(I) of the National Electric Power Regulatory Authority (Tariff Standards and Procedure Rules, 1998) | View | |
09-10-2020 |
Grant of Generation Licence No. SGC/149/2020
Licence Application No. LAG-481 Atlas
Energy Limited (ATEL) |
|
08-10-2020 |
Decision of the Authority in the matter
of Fuel Charges Adjustment for
the Month of July 2020 for
XWDISCOs along with Notification
Thereof |
|
01-10-2020 |
Modification-IV in Generation Licence
No. GL/01/2002 Licence Application No.
LAG-02 Jamshoro Power Company Limited
(JPCL) |
|
01-10-2020 |
Grant of Generation Licence No. SGC/148/2020
Licence Application No. LAG-480 Atlas
Energy Limited (ATEL) |
|
01-10-2020 |
Grant of Generation Licence No. SGC/147/2020
Licence Application No. LAG-479 Atlas
Energy Limited (ATEL) |
|
01-10-2020 |
Grant of Generation Licence No. SGC/146/2020
Licence Application No. LAG-478 Atlas
Energy Limited (ATEL) |
|
01-10-2020 |
Grant of Generation Licence No. SGC/145/2020
Licence Application No. LAG-477 Atlas
Energy Limited (ATEL) |
|
30-09-2020 |
Decision of National Electric Power
Regulatory Authority in the Matter of
Motion for Leave for Review Filed by JDW
Sugar Mills Limited against the
Determination of the Authority Dated
November 10, 2017 in the Matter of Bagasse Upfront Tariff, 2017 for New Bagasse Cogeneration Power Projects |
|
24-09-2020 |
Decision of the Authority in the matter of Requests filed by XWDISCOs for Periodic Adjustment in Tariff for the 2nd and 3rd Quarters of FY 2019-20 | |
23-09-2020 |
Hearing regarding Fuel Charges Adjustment for the Month of August 2020 for Ex-WAPDA Distribution Companies | |
XWDISCOs Energy Purchase Data for the month of August 2020 | ||
18-09-2020 |
Notice of Admission/ Hearing - Petition filed by National Transmission & Despatch Company Limited (NTDCL) for Determination of USE of System Charges (UoSC) for the FY 2019-20, FY 2020-21 and FY 2021-22 | |
Petition filed by National Transmission & Despatch Company Limited (NTDCL) for Determination of USE of System Charges (UoSC) for the FY 2019-20, FY 2020-21 and FY 2021-22 | ||
Framing of issues - NTDCL for Determination of USE of System Charges (UoSC) for the FY 2019-20, FY 2020-21 and FY 2021-22 | view | |
11-09-2020 |
Notice of Admission/ Hearing - Tariff Petition of 1.875 MW Shishi Hydropower Project Submitted by Pakhtunkhwa Energy Development Organization | |
Tariff Petition of 1.875 MW Shishi Hydropower Project Submitted by Pakhtunkhwa Energy Development Organization | ||
10-09-2020 |
Notice of Public Hearing - in the matter of Authority Proposed Modification in the Distribution Licence of K-Electric Limited (KEL) | |
09-09-2020 |
Publication of Draft amendments to the National Electric Power (Wheeling of Electric Power) Regulations, 2016 for eliciting public opinion within 30 days of this publication | |
Draft Notification amendments to the National Electric Power (Wheeling of Electric Power) Regulations, 2016 | ||
09-09-2020 |
Grant of Generation Licence No. SGC/144/2020 Licence Application No. LAG-463 Grid Edge (Private) Limited (GEPL) | |
09-09-2020 |
Modification-I in Generation Licence No. SPGL/05/2O14 Licence Application No. LAG-244 Access Electric (Private) Limited (AEPL) | |
09-09-2020 |
Grant of Generation Licence No. SGC/136/2020 Licence Application No. LAG-466 Solis Charlie Energy (Private) Limited (SCEPL) | |
09-09-2020 |
Grant of Generation Licence No. SGC/139/2020 Licence Application No. LAG-467 Solis Charlie Energy (Private) Limited (SCEPL) | |
09-09-2020 |
Grant of Generation Licence No. SGC/140/2020 Licence Application No. LAG-470 Solis Delta Energy (Private) Limited (SDEPL) | |
09-09-2020 |
Grant of Generation Licence No. SGC/141/2020 Licence Application No. LAG-468 Solis Bravo Energy (Private) Limited (SBEPLI) | |
09-09-2020 |
Grant of Generation Licence No. SGC/143/2020 Licence Application No. LAG-465 Solis Bravo Energy (Private) Limited (SBEPL) | |
09-09-2020 |
Grant of Generation Licence No. SGC/137/2020 Licence Application No. LAG-469 Solis Alpha Energy (Private) Limited (SAEPL) | |
09-09-2020 |
Grant of Generation Licence No. SGC/142/2020 Licence Application No. LAG-464 Solis Alpha Energy (Private) Limited (SAEPL) | |
09-09-2020 |
Hearing on
Additional Issues on XWDISCOs
Tariff Petition for the FY 2018-19 and
FY 2019-20 |
|
09-09-2020 |
Amendment in
NEPRA (Review Procedure) Regulations, 2009 notified vide S.R.O. 833 |
|
08-09-2020 |
Amendment in NEPRA (Supply of
Power) Regulations, 2015 notified vide S.R.O. 832 |
|
08-09-2020 |
Notice -
Licensee Proposed Modification (LPM) in
the Generation Licence of Siachen
Energy Limited |
|
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Siachen Energy Limited | ||
07-09-2020 |
Grant of Generation Licence No. SGC/138/2020 Licence Application No. LAG-471 Solis Alpha Energy (Private) Limited (SAEPL) | |
07-09-2020 |
Determination of
National Electric Power Regulatory
Authority in the matter of Tariff
Petition filed by M/s. Asia Energy
(Private) Ltd. for Determination of
Generation Tariff in respect of 30 MWp
Solar Power Project |
|
07-09-2020 |
Decision of National Electric Power Regulatory Authority in the matter of Motion for Leave for Review filed by M/s. Zorlu Solar Pakistan Limited against the Authority Determination of Generation Tariff dated January 15,2020 | |
05-09-2020 | Notice - to Submit Comments in the Matter of Authority Proposed Modification in the Existing Distribution Licence of K-Electric Limited (KEL) within 03 days | View |
K-Electric Response - Authority Proposed Modification in the Existing Distribution Licence | View | |
04-09-2020 | Press Release - NEPRA to formally investigate electrocution cases in Karachi | View |
04-09-2020 | Performance Evaluation Report 2018-19 of DISCOs & K-Electric with a comparison to 2014-15 through 2017-18 With a comparison to 2014-15 through 2017-18 | |
03-09-2020 | NEPRA's Annual Procurement Plan for the Year 2020-21 | |
03-09-2020 | Notice of Public Hearing - in the Matter of Mid-Term Review of the Multi Year Tariff of the K-Electric Limited | |
Petition for Mid-Term Review of the Multi Year Tariff of the K-Electric Limited | View | |
Response of K-Electric Limited to the Queries of the Authority | View | |
Issues for-Public Hearing K-Electric Limited Mid-Term Review | View | |
01-09-2020 | Press Release - Fuel Price Adjustment for the Month of July 2020 | |
01-09-2020 | Grant of Generation Licence No. SGCI135/2020 Licence Application No. LAG-459 Shams Power (Private) Limited (SPPL) | |
31-08-2020 | Determination of the Authority in the matter of Motions for Leave for Review Filed by Wind Power Projects Regarding Registration of Central Power Purchasing Agency (Guarantee) Limited | |
29-08-2020 | Notice of Admission/ Hearing - Tariff Petition filed by Uzghor Hydro Power Company Pvt. Limited for its 82.25 MW Turtonas-Uzghor Hydropower project | |
Tariff Petition of Uzghor Hydro Power Company Pvt. Limited for its 82.25 MW Turtonas-Uzghor Hydropower project | View | |
29-08-2020 | Notice of Admission/ Hearing - Tariff Petition of 69 MW Lawi Hydropower Project submitted by Pakhtunkhwa Energy Development Organization (PEDO) | |
Tariff Petition of Lawi Hydropower Project submitted by Pakhtunkhwa Energy Development Organization (PEDO) | View | |
27-08-2020 | Notice of Admission - Application of Matol (Private) Limited for Grant of Generation Licence | |
Application of Matol (Private) Limited for Grant of Generation Licence | View | |
26-08-2020 | Notice of Admission/ Hearing - regarding Petition filed by GEPCO for the determination of its tariff for Supply of electric power for the FY 2019-20 | |
Petition filed by GEPCO for the determination of its tariff for Supply of electric power for the FY 2019-20 | View | |
Issues for hearing in the matter of Petition filed by GEPCO for determination of tariff for Supply of Power for the Financial Year 2019-20 | View | |
26-08-2020 | Notice of Admission/ Hearing - regarding Petition filed by GEPCO for the determination of its tariff for Supply of electric power for the FY 2018-19 | |
Petition filed by GEPCO for the determination of its tariff for Supply of electric power for the FY 2018-19 | View | |
Issues for hearing in the matter of Petition filed by GEPCO for determination of tariff for Supply of Power for the Financial Year 2018-19 | View | |
26-08-2020 | Notice of Admission/ Hearing - regarding Petition filed by GEPCO for the determination of its tariff for Distribution of electric power for the FY 2019-20 | |
Petition filed by GEPCO for the determination of its tariff for Distribution of electric power for the FY 2019-20 | View | |
Issues for hearing in the matter of Petition filed by GEPCO for determination of tariff for Distribution of Power for the Financial Year 2019-20 | View | |
26-08-2020 | Notice of Admission/ Hearing - regarding Petition filed by GEPCO for the determination of its tariff for Distribution of electric power for the FY 2018-19 | |
Petition filed by GEPCO for the determination of its tariff for Distribution of electric power for the FY 2018-19 | View | |
Issues for hearing in the matter of Petition filed by GEPCO for determination of tariff for Distribution of Power for the Financial Year 2018-19 | View | |
25-08-2020 | Hearing regarding Fuel Charges Adjustment for the Month of July 2020 for EX-WAPDA Distribution Companies | |
CPPAG - XWDISCOs Energy Purchase Data for the Month of July 2020 | View | |
21-08-2020 | Publication of National Electric Power Regulatory Authority (Selection of Operation and Maintenance Contractors by Generation Companies) Guidelines, 2020 For eliciting public Opinion within 30 days | |
National Electric Power Regulatory Authority (Selection of Operation and Maintenance Contractors by Generation Companies) Guidelines, 2020 | ||
20-08-2020 | Notice of Admission - Petition filed by WAPDA Hydroelectric for Revision of Tariff for FY 2020-21 for Supply of Power from WAPDA Hydel Power Stations | |
Petition filed by WAPDA Hydroelectric for Revision of Tariff for FY 2020-21 for Supply of Power from WAPDA Hydel Power Stations | ||
20-08-2020 | Notice of Public Hearing in the matter of Detailed Deign and Implementation Roadmap of Competitive Trading Bilateral Contract Market (CTBCM) model submitted by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) | |
Detailed Design CTBCM | View | |
Implementation Roadmap of CTBCM | View | |
Comments of Stakeholders CTBCM | View | |
List of Issues framed for the Public Hearing in the matter of Detailed Design and Implementation Roadmap of CTBCM Submitted by CPPA-G | View | |
18-08-2020 | Publication of draft National Electric Power Regulatory Authority (Fee) Regulations, 2020 for eliciting public opinion within 30 days of this publication. | |
14-08-2020 | Notice Licensee proposed Modification (LPM) in the Generation Licence of Zhenfa Pakistan New Energy Company (Private) Limited | |
Application for Licensee proposed Modification (LPM) in the Generation Licence of 100MWp Zhenfa Pakistan New Energy Company (Private) Limited | View | |
14-08-2020 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Zorlu Solar Pakistan (Private) Limited | |
Application for License Proposed Modification Application for 100 MW Zorlu Solar Pakistan (Pvt.) Ltd. | View | |
11-08-2020 | Notice Regarding Postponement of Public Hearing in the Matter of Application of CJ Hydro (Private) Limited for the Grant of Generation Licence | |
08-08-2020 | Press Release - NEPRA Regional Offices in Sindh to remain open on weekends due to monsoon rain spell | View |
08-08-2020 | Notice of Admission/ Hearing - Tariff Petition of Pakhtunkhwa Energy Development Organization (PEDO) for 40.8 MW Koto Hydropower Project | View |
Tariff Petition for EPC Stage Tariff Petition of 40.80 MW Koto Hydropower Project submitted by Pakhtunkhawa Energy Development Organization (PEDO) | View | |
List of Issues for Hearing EPC Stage Tariff Petition of 40.80 MW Koto Hydropower Project submitted by Pakhtunkhawa Energy Development Organization (PEDO) | View | |
07-08-2020 | Decision of the Authority in the matter of Fuel Charges Adjustment for the Months of November 2019 to June 2020 for XWDISCOs along with Notification Thereof | View |
06-08-2020 | Notice Licensee Proposed Modification (LPM) in the Generation Licence of Foundation Power Company (Dharaki) Limited | View |
30-07-2020 | Review Petition filed by PESCO against determination of the Authority dated April 27, 2020 in the matter of LPM of PEDO for its Pehur Hydel Power Plant | View |
29-07-2020 | Notice of Admission - Application of F1 Solar PK (Private) Limited for the grant of Generation Licence | View |
Application of F1 Solar PK (Private) Limited for the grant of Generation Licence | View | |
28-07-2020 | Press Release Electrocution cases in Karachi | View |
25-07-2020 | Notice Regarding Public Hearing in the Matter of Application of CJ Hydro (Private) Limited for the Grant of Generation Licence | View |
Application of CJ Hydro (Private) Limited for grant of Generation Licence | ||
List of Issues framed for the Public Hearing in the matter of the Application of CJ Hydro (Private) Limited for the Grant of Generation Licence | View | |
Comments of Stakeholders-Generation Licence Application of CJ Hydro (Private) Limited | View | |
25-07-2020 | Notice of Hearing - Power Acquisition Request filed by K-Electric for Purchase of Power from Lucky Cement Limited for onward supply to DHA City Karachi | View |
21-07-2020 | Amendment in NEPRA (Import of Electric Power Regulations, 2017 notified vide S.R.O 634(I)/2020 | View |
21-07-2020 | Press Release - Report of NEPRA�s fact-finding Committee in the matter of excessive load shedding in Karachi | View |
21-07-2020 | Press Release - Public Hearings in the matter of unscheduled load shedding and over-billing by HESCO & SEPCO | View |
19-07-2020 | Corrigendum: Correction of Email address in Urdu advertisement published on 18.07.2020 | View |
18-07-2020 | Notice Regarding Public Hearings to be Held in the Matter of Unscheduled Load Shedding and Excessive Billing by HESCO, SEPCO, PESCO, TESCO, QESCO, LESCO and MEPCO | View |
17-07-2020 | Decision of the Authority in the matter of Tariff Proposal submitted by Sapphire Hydropower Private Limited for 150 MW Sharmai Hydropower Project | View |
16-07-2020 | NEPRA Rebuttal/ Clarification about fake Press Release | View |
16-07-2020 | Rescheduling of Hearing - Requests filed by K-Electric regarding Monthly Fuel Charges Adjustments for the Period January to May 2020, Quarterly Adjustments for the Quarters ending December 2019 to March 2020 under Multi Year Tariff (MYT) FY 2017-2023 | View |
K-Electric Monthly Cost Variation for the month of May 2020 under Multi-Year Tariff 2017 - 2023 (already uploaded K-Electric FCA data from January to April 2020 and Quarterly adjustments data for Quarter 2 and 3 of FY 2019-20 on dated 11-06-2020) | View | |
16-07-2020 | Rescheduling of Hearing - Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the 2nd & 3rd Quarter from October 2019 to March 2020 | View |
Application of XWDISCOs for Quarterly Tariff Adjustment for the 2nd Quarter of the Financial Year 2019-20 | View | |
Application of XWDISCOs for Quarterly Tariff Adjustment for the 3rd Quarter of the Financial Year 2019-20 | View | |
16-07-2020 | Hearings Regarding Fuel Charges Adjustment for the Months of November 2019 to June 2020 for EX-WAPDA Distribution Companies | View |
CPPAG Energy Purchase Data of XWDISCO's | View | |
16-07-2020 | Notice of Admission/ Hearing - Tariff Petition filed by Western Energy (Pvt.) Limited for the Determination of Generation Tariff in respect of 50 MW Wind Power Project | View |
Tariff Petition filed by Western Energy (Pvt.) Limited for the Determination of Generation Tariff in respect of 50 MW Wind Power Project | View | |
15-07-2020 | Press Release - Public Hearing in the matter of Indicative Generation Capacity Expansion Plan (IGCEP) 2047 | View |
13-07-2020 | K-Electric Submission of Power Acquisition Request in Relation to Power Acquisition from Lucky Cement Limited | View |
10-07-2020 | In response to the suggestions received from consumers during the Public Hearing held on July 10, 2020 following new E-mail address has been created for filing complaints against K-Electric regarding un-scheduled loadsheding and excessive billing kecomplaints@nepra.org.pk | |
10-07-2020 | Press Release - Public Hearing in the matter of excessive load shedding in Karachi | View |
08-07-2020 | Determination of National Electric Power Regulatory Authority in the matter of Tariff Petition filed by M/s. P&G Energy (Private) Limited for Determination of Generation Tariff in respect of 62.2 MWp Solar Power Project | View |
08-07-2020 | Revised Consumer Service Manual (June 2020) | View |
08-07-2020 | Publication of draft amendments to the National Electric Power Regulatory Authority (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015 for eliciting public opinion within 30 days | View |
08-07-2020 | Publication of draft amendments to the National Electric Power Regulatory Authority (Review Procedure) Regulations, 2009 for eliciting public opinion within 30 days | View |
08-07-2020 | Notice of Admission / Hearing - Sindh Transmission & Dispatch Company Limited Modification Petition | View |
08-07-2020 | Notice of Admission - Application of CTGI WK Cholistan Solar Power Project (Private) Limited (CWCSP) for grant of Generation Licence | View |
Application of CTGI WK Cholistan Solar Power Project (Private) Limited (CWCSP) for grant of Generation Licence | View | |
06-07-2020 | Notice Regarding Public Hearing Proposed to be Held in the Matter of Load Shedding in Karachi | View |
06-07-2020 | Publication of draft amendments to the National Electric Power Regulatory Authority (Supply of Power) Regulations , 2015 for eliciting public opinion within 30 days of this publication | View |
03-07-2020 | Notice Admission/ Hearing - Tariff Petition Filed by Access Electric (Pvt.) Limited for the Determination of Generation Tarif in Respect of 10 MWp Solar PV Power Plant | View |
Tariff Petition Filed by Access Electric (Pvt.) Limited for the Determination of Generation Tarif in Respect of 10 MWp Solar PV Power Plant | View | |
03-07-2020 | Notice Admission/ Hearing - Tariff Petition Filed by Access Solar (Pvt.) Limited for the Determination of Generation Tarif in Respect of 11.52 MWp Solar PV Power Plant | View |
Tariff Petition Filed by Access Solar (Pvt.) Limited for the Determination of Generation Tarif in Respect of 11.52 MWp Solar PV Power Plant | View | |
29-06-2020 | Notice Regarding Public Hearing Proposed to be Held in the Matter of the Indicative Generation Capacity Expansion Plan 2047 (IGCEP) | View |
Comments of Stakeholders on IGCEP 2047 | View | |
Indicative Generation Capacity Expansion Plan (IGCEP 2047) | View | |
26-06-2020 |
Press Release - Un-Scheduled Load Shedding by the Distribution Companies |
|
25-06-2020 |
Press Release - Un-Scheduled Load Shedding and Issuance of Excessive Bills by HESCO & SEPCO |
|
24-06-2020 |
Press Release - Un-Scheduled Load Shedding and Issuance of Excessive Bills by K-Electric |
|
17-06-2020 |
||
Notice - Licensee Proposed Modification (LPM) in the Generation Licence of International Industries Limited | view | |
Application for Licensee Proposed Modification (LPM) in the Generation Licence of International Industries Limited | view | |
15-06-2020 |
||
Motion for leave for Review against the Determination of NEPRA in the Matter of Tariff Petition filed by Burj Wind Energy (Private) Limited for Determination of Reference Generation Tariff in Respect of 13.80 MW Wind Power Project | view | |
11-06-2020 |
||
Motion for leave for Review of the Tariff Determination for Trans Atlantic Energy (Private) Limited in respect of its 48.3 MW Wind Power Project at Jhimpir District Thatta, Sindh under Rule 16(6) of the NEPRA (Tariff Standards and Procedure) Rules 1998 read with NEPRA (Review Procedure) Regulations 2009) | view | |
11-06-2020 |
Notice of Hearing - Hearing in the matter of requests filed by K-Electric regarding Monthly Fuel Charge Adjustment for the period January to April 2020, Quarterly Adjustment for Quarter ending December 2019 & March 2020 under Multi-Year Tariff FY 2017-2023 of K-Electric | view |
Quarterly variation for the quarter October 2019 to December 2019 under Multi-Year Tariff 2017 - 2023 | view | |
Monthly Cost Variation for the month of January 2020 under Multi-Year Tariff 2017 - 2023 | view | |
Monthly Cost Variation for the month of February 2020 under Multi-Year Tariff 2017 - 2023 | view | |
Monthly Cost Variation for the month of March 2020 under Multi-Year Tariff 2017 - 2023 | view | |
Quarterly variation for the quarter January 2020 to March 2020 under Multi-Year Tariff 2017 - 2023 | view | |
Monthly Cost Variation for the month of April 2020 under Multi-Year Tariff 2017 - 2023 | view | |
Issues for Hearing in the matter of Monthly Fuel Charge Adjustment for the period January to April 2020, Quarterly Adjustment for Quarter ending December 2019 & March 2020 under Multi-Year Tariff FY 2017-2023 of K-Electric | view | |
K-Electric Mechanism of Claw back within the MYT Determination 2017-2023 | view | |
10-06-2020 |
Notice of Admission/ Hearing - Petition filed by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) for Determination of its Market Operation Fee for the FY 2019-20 | view |
CPPA-G Petition for Determination of its Market Operation Fee for the FY 2019-20. | view | |
Issues for Hearing in the matter of Petition for determination of market operation fee for the Financial Year 2019-20 filed by CPPA-G. | view | |
04-06-2020 |
Decision of National Electric Power Regulatory Authority in the matter of Motion for Leave for Review filed by M/s. Enertech Bostan Solar (Pvt.) Ltd. against the Authority's Determination of Generation Tariff dated February 11, 2020 | view |
04-06-2020 |
Decision of the National Electric Power Regulatory Authority in the matter of Motion for Leave for Review filed by M/s. Enertech Quetta Solar (Private) Ltd. against the Authority's Determination of Generation Tariff dated January 14, 2020 | view |
03-06-2020 | Decision of the Authority in the matter of Motion for Leave for Review filed by Gul Ahmed Energy Limited in respect of the Tariff Determination dated 21st November 2019 regarding Generation Tariff for Term Extension of RFO Based Power Plant of 136.17 MW (Gross) at Karachi | View |
29-05-2020 |
Notice - Licensee Proposed Modification (LPM) in
the Generation Licence of Reshma Power Generation (Private) Limited |
|
28-05-2020 | Determination of the Authority in the matter of Review Motions of National Grid Company & Distribution Companies in the Case of Fatima Energy Limited | View |
22-05-2020 | Notice Licensee Proposed Modification (LPM) in the Generation Licence of Gulf Powergen (Private) Limited | View |
Application of Gulf Powergen (Private) Limited for Renewal of Generation Licence | View | |
22-05-2020 | Hearing in the matter of tariff modification petition filed by WAPDA for revision of NHP/Water Usage Charges rate payable to Govt. Of AJ&K on generation from Mangla Power Station | View |
Tariff Modification Petition filed by WAPDA for revision of NHP/Water Usage Charges rate payable to Govt. Of AJ&K on generation from Mangla Power Station | View | |
List of Issues for Hearing - Tariff Modification Petition filed by WAPDA for revision of NHP/Water Usage Charges rate payable to Govt. Of AJ&K on generation from Mangla Power Station | View | |
22-05-2020 | Notice of Hearing - Hearing regarding quarterly adjustments of XWDISCOs on account of variation in Power Purchase Price (PPP) for the 2nd & 3rd quarter from October 2019 to March 2020 | View |
Application of XWDISCOs for Quarterly Tariff Adjustment for the 2nd Quarter of the Financial Year 2019-20 | View | |
Application of XWDISCOs for Quarterly Tariff Adjustment for the 3rd Quarter of the Financial Year 2019-20 | View | |
22-05-2020 | Re-Scheduling of Hearing in the Matter of Adjustments Request on Account of Indexation of Multi Year Tariff (MYT) Components for the FY 2019-20 and Prior Year Adjustment in the Consumer End Tariff of Lahore Electric Supply Company Limited (LESCO) | View |
22-05-2020 | Re-Scheduling of Hearing in the Matter of Tariff Petitions filed By SEPCO for Determination of its Distribution and Supply of Power Tariff for The FY 2018-19 & FY 2019-20 | View |
22-05-2020 | Notice of Hearing Tariff Petition filed by Northern Power Generation Company Limited for GENCO-III (Old Blocks) | View |
22-05-2020 | Re-Scheduling of Hearing - Tariff petition filed by Safe Solar Power (Pvt.) Limited for the Determination of Generation Tariff in respect of 10 MWp Solar PV Power Plant | View |
18-05-2020 | Grant of Generation Licence No. SGC/134/2020 Licence Application No. LAG-449 Shams Power (Private) Limited (SPPL) | View |
29-04-2020 | Grant of Generation Licence No. IGSPL/105/2020 Licence Application No. LAG-422 Saifco Hydropower Limited (SHPL) | View |
29-04-2020 | Grant of Generation Licence No. GL(Hydel)/15/2020 Licence Application No. LAG-402 Pakhtunkhwa Energy Development Organization (PEDO) (Jabori Hydropower Project) | View |
29-04-2020 | Grant of Generation Licence No. SPGL/38/2020 Licence Application No. LAG-472 Solution De Energy (Private) Limited (SDeEPL) | View |
27-04-2020 | Modification-I Generation Licence No. GL(HYDEL)/08/2009 Licence Application No. LAG-145 Pakhtunkhwa Energy Development Organization (PEDO) (Pehur Hydropower Project) | View |
27-04-2020 | Grant of Generation Licence No. SPGL/35/2020 Licence Application No. LAG-446 Siddiqsons Nowshera Solar Limited (SSNSL) | View |
25-04-2020 | Notice for submitting comments in the matter of Indicative Generation Capacity Expansion Plan 2047 (IGCEP) | View |
24-04-2020 | Invitation to Stakeholders for submitting comments in the matter of Indicative Generation Capacity Expansion Plan (IGCEP 2047) | View |
21-04-2020 | Grant of Generation Licence No. SPGL/37/2020 Licence Application No. LAG-460 Artistic Solar Energy (Private) Limited (ASEPL | View |
21-04-2020 | Grant of Generation Licence No. SPGL/36/2020 Licence Application No. LAG-445 Siddiqsons Kohat Solar Limited (SSKSL) | View |
15-04-2020 |
Report on NEPRA Energy Week 2020 |
|
29-03-2020 |
Notice - Licensee Proposed
Modification (LPM) in the Generation
Licence of Fimcotex Industries
(Private) Limited |
|
Application for Licensee Proposed Modification (LPM) in the Generation Licence of Fimcotex Industries (Private) Limited | View | |
25-03-2020 | NEPRA Corrigendum Vacant Positions | View |
20-03-2020 |
Result of the screening test held on January 25 & 26, 2020, for paid internship at NEPRA
Result
|
|
19-03-2020 |
Postponement of Hearings - All the
Stakeholders and general public are
hereby informed that all the
scheduled hearing at NEPRA Tower
Islamabad have been postponed as
precautionary measure against
COVID-19 |
|
17-03-2020 | Rescheduling of Hearing - Tariff Petition filed by Safe Solar Power (Pvt.) Limited for the Determination of Generation Tariff in respect of 10 MWp Solar Power Plant | View |
16-03-2020 |
Notice of Admission/
Application of Atlas Energy Limited
for the Grant of Generation License
to 995.60 kWp Solar Power Plant |
|
Application of Atlas Energy Limited (AEnL) for grant of Generation License in respect of 995.60 kWp Solar Power Plant | View | |
16-03-2020 |
Notice of Admission/
Application of Atlas Energy Limited
for the Grant of Generation License
to 858.8 kWp Solar Power Plant |
|
Application of Atlas Energy Limited (AEnL) for grant of Generation License in respect of 858.8 kWp Solar Power Plant | View | |
16-03-2020 |
Notice of Admission/
Application of Atlas Energy Limited
for the Grant of Generation License
to 638.4 kWp Solar Power Plant |
|
Application of Atlas Energy Limited (AEnL) for grant of Generation License in respect of 638.4 kWp Solar Power Plant | View | |
16-03-2020 |
Notice of Admission/
Application of Atlas Energy Limited
for the Grant of Generation License
to 608.0 kWp Solar Power Plant |
|
Application of Atlas Energy Limited (AEnL) for grant of Generation License in respect of 608.0 kWp Solar Power Plant | View | |
16-03-2020 |
Notice of Admission/
Application of Atlas Energy Limited
for the Grant of Generation License
to 501.60 kWp Solar Power Plant |
|
Application of Atlas Energy Limited (AEnL) for grant of Generation License in respect of 501.60 kWp Solar Power Plant | View | |
16-03-2020 |
Notice of Admission/
Application of Uzghor Hydro Power
Company (Pvt) Ltd for Grant of
Generation Licence |
|
Application of Uzghor Hydro Power Company (Pvt) Ltd for grant of Generation License | View | |
08-03-2020 |
Notice to Provide Comments in
the Matter of Detailed Design
Report and Implementation Roadmap of
Competitive Trading Bilateral
Contract Market (CTBCM) Model
Submitted by Central Power
Purchasing Agency (Guarantee Limited
(CPPA-G) Within 14 days |
|
CTBCM IMPLEMENTATION ROADMAP | ||
CTBCM DETAIL DESIGN REPORT | ||
07-03-2020 |
Notice of Rescheduling of Hearing
- Tariff Petition filed by
Northern Power Generation Company
Limited for GENCO-III (Old
Blocks) |
|
07-03-2020 |
Hearing regarding Fuel
Charges Adjustment for the Month of
January 2020 for EX-WAPDA
Distribution Companies |
|
XW-DISCOs FCA Mechanism-Energy Purchase Data for the Month of January, 2020 | ||
CDP Metering Data Containing Generation & Distribution Points of NTDC Transmission System (500 & 220 kV) for the Month of January 2020 | ||
07-03-2020 |
Hearing regarding Fuel
Charges Adjustment for the Month of
December 2019 for EX-WAPDA
Distribution Companies |
|
XW-DISCOs FCA Mechanism-Energy Purchase Data for the Month of December, 2019 | ||
CDP Metering Data Containing Generation & Distribution Points of NTDC Transmission System (500 & 220 kV) for the Month of December 2019 | ||
07-03-2020 |
Re-Scheduling of Hearing -
Fuel Charges Adjustment for the
Month of November 2019 for
EX-WAPDA Distribution Companies |
|
06-03-2020 |
5th Meeting of SAARC Council of Experts of Energy Regulators (Electricity) scheduled to held on March 16th & 17th - 2020 in Islamabad - Pakistan has been postponed by the SAARC Secretariat due to evolving situation of COVID-19 Corona virus |
|
04-03-2020 |
Notice of Hearing -
Hearing regarding adjustments
request on account of Indexation
of Multi Year Tariff (MYT)
components for the FY 2019-20 and
Prior Year Adjustment in the
Consumer end Tariff of LESCO |
|
LESCO Annual Revenue Requirement Adjustments/ Indexation for FY 2019-20 under Multiyear Tariff (MYT) Regime | ||
Issues framed for Hearing in the Matter of Adjustment Request filed by Lahore Electricity Supply Company Limited (LESCO) for Adjustment in Tariff for the FY 2019-20 | ||
03-03-2020 |
Notice of Admission/ Hearing
- Tariff Petition filed by Safe
Solar Power (Pvt.) Limited for
the Determination of Generation
Tariff in respect of 10 MWp Solar PV
Power Plant |
|
Petition filed by Safe Solar Power (Pvt.) Limited for the Determination of Generation Tariff in respect of 10 MWp Solar PV Power Plant | ||
02-03-2020 |
NTDC Motion for Review
against the Authority's
Determination dated 31.12.2019 in
the matter of the Licensee Proposed
Modification (LPM) dated 22.08.2019
submitted by Fatima Energy Ltd.
|
|
28-02-2020 |
Press Release - NEPRA
Energy Week (Distribution
Session and Concluding the Energy
Week |
|
28-02-2020 |
Review by FESCO against
Determination dated 31.12.2019 of
the NEPRA in the matter of approval
of Licensee Proposed Modification in
the Generation License of Fatima
Energy Limited |
|
28-02-2020 |
NTDC Review Motion against
Decision of the NEPRA in the Matter
of Grant of License to Sindh
transmission and Dispatch Company
to Act as a Provincial Grid Company
dated 05.11.2019. |
|
28-02-2020 |
KE's Motion for Review under
Regulation 3(2) of the NEPRA (Review
Procedure) Regulations, 2009 against
the Determination of NEPRA in the
Matter of Application of Grid
Edge (Private) Limited for Grant
of Generation licence |
|
28-02-2020 |
Motion for Leave for Review
against Determination of the
Authority in the Matter of
Application for Grant of Generation
License by Master Hydro Power
(Private) Limited for its 99 MW
Arkari Hydropower Project located at
Arkari Gol, Distric Chitral, KPK |
|
28-02-2020 |
Review Petition by CPGCL
against the Authority's
Determinations dated 10th July 2019 |
|
28-02-2020 |
Review by IESCO against
Determination dated 31.12.2019 of
the NEPRA in the matter of Approval
of Licensee Proposed Modification in
the Generation License of Fatima
Energy Limited (FEL) |
|
27-02-2020 |
Day 4 of NEPRA Energy Week
(Transmission): Key Challenges
and Issues in Transmission
Sector Needs to be Resolved; Member
NEPRA Highlighted Upcoming
Challenges during Transmission Session |
|
26-02-2020 |
Day 3 of NEPRA Energy Week (Innovation Session) |
|
25-02-2020 |
NEPRA Energy Week (Day -2 Generation) |
|
25-02-2020 |
Grant of Generation Licence No. SGC/133/2020
Licence Application No. LAG-432
Vision Developers (Private) Limited
(VDPL) |
|
24-02-2020 |
Inaugural and CPEC Sessions of NEPRA Energy Week |
|
19-02-2020 | Decision of the Authority in the matter of Tariff Adjustments at Commercial Operation Date (COD) of National Power Parks Management Company (Private) Limited (NPPMCL), 1223.106 MW - Balloki | |
19-02-2020 | Decision of the Authority in the matter of Tariff Adjustments at Commercial Operation Date (COD) of National Power Parks Management Company (Private) Limited (NPPMCL), 1230.54 MW Haveli Bahadar Shah | |
19-02-2020 | Motion for Leave for Review against the determination of NEPRA titled "Decision of the Authority in the Matter of Engro Powergen Qadirpur Limited ("EPQL") dated December 10, 2014 | |
Communication in connection with the Motion for Leave for Review dated December 12, 2019 in the Matter of Engro Powergen Qadirpur Limited ("EPQL") | View | |
17-02-2020 | Determination of the Authority in the matter of Approval of Amendments in the Commercial Code as Proposed by the Commercial Code Review Panel | |
16-02-2020 | Notice of Admission - Application of Bulleh Shah Packaging (Private) Limited for Grant of Generation Licence | |
Application of Bulleh Shah Packaging (Private) Limited for Grant of Generation Licence | View | |
13-02-2020 |
Hearing
- in
the matter of requests filed by
K-Electric
regarding Monthly Fuel Price
Adjustments
for the Period July 2019 to December
2019, Quarterly Adjustments
from the Quarters Apr-Jun 2019 &
Jul-Sep 2019 and Annual
Adjustment & Indexation
under the K-Electric Multi Year
Tariff (MYT) 2017-2023 |
|
K-Electric Monthly Cost Variation for the month of July 2019 under Multi-Year Tariff 2017- 2023 | View | |
K-Electric Quarterly Variation for the Quarter July 2019 to September 2019 under Multi-Year Tariff 2017 | View | |
NEPRA's Decision in the matter of Tariff Variation for the Period July 2016 to June 2019 under the Multi Year Tariff (MYT) 2017-23 | View | |
13-02-2020 | Notice of Admission - Generation Licence Application of Pakhtunkhwa Energy Development Organization for Lawi Hydro Power Project | View |
Application of Pakhtunkhwa Energy Development Organization for Generation Licence of Lawi Hydro Power Project | View | |
13-02-2020 |
Public
Notice - Regarding Approval of
the Modification-I in the Generation
Licence of Metro Wind Power
Limited (MWPL) |
|
13-02-2020 |
Public Notice
- Regarding Approval of the
Modification-II in the Generation
Licence of Fatima Energy Limited |
|
13-02-2020 |
Public Notice
- Regarding Approval of the
Modification-I in the Generation
Licence of Gul Ahmed Electric
Limited (GAEL) |
|
13-02-2020 |
Modification-I
in the Generation Licence of
Engro Powergen Thar (Private)
Limited |
|
13-02-2020 |
Public Notice
- Regarding Approval of the
Modification-I in the Generation
Licence of Gharo Solar (Private)
Limited |
|
13-02-2020 |
Public Notice
- Regarding Approval of the
Modification-I in the Generation
Licence of Din Energy Limited |
|
12-02-2020 |
Publication
of draft amendments to the National
Electric Power Regulatory Authority
(NEPRA) (Import of Electric
Power) Regulations for
eliciting public opinion
within 30 days |
|
12-02-2020 | Invitation To Bid NEPRA Tender No. 02/2020 - invites bids for Digitization/ Scanning of Files, Records & Documents | View |
12-02-2020 | Notice of Admission/ Hearing - Petition of Pakhtunkhwa Energy Development Organization (PEDO) for 10.2 MW Jabori Hydropower Project. | |
Tariff petition of 10.20 mw Jabori Hydropower Project submitted by PEDO | View | |
List of Issues for Hearing - Tariff petition of 10.20 mw Jabori Hydropower Project submitted by PEDO | View | |
12-02-2020 | Notice of Admission/ Hearing - Petition of Pakhtunkhwa Energy Development Organization (PEDO) for 11.8 MW Karora Hydropower Project. | |
Tariff petition of 11.80 mw Karora Hydropower Project submitted by PEDO | View | |
List of Issues for Hearing - Tariff petition of 11.80 mw Karora Hydropower Project submitted by PEDO | View | |
07-02-2020 | Public Notice regarding Approval of the Modification-I in the Generation Licence of Norinco International Thatta Power (Pvt.) Limited (NITPPL) | |
07-02-2020 | Approval of Modification-II in the Generation Licence of Premier Industrial Chemical Manufacturing Company (Pvt.) Limited | |
07-02-2020 | Public Notice regarding Approval of the Modification-I in the Generation Licence of Master Green Energy Limited (MGEL) | |
07-02-2020 | Public Notice regarding Approval of the Modification-I in the Generation Licence of Liberty Wind Power 1 (Private) Limited (LWPPL-1) (formerly Zulaikha Energy (Pvt.) Limited) | |
07-02-2020 | Public Notice regarding Approval of the Modification-I in the Generation Licence of Liberty Wind Power 2 (Private) Limited (LWPPL-2) (formerly Noor Solar Energy (Pvt.) Limited) | |
07-02-2020 | Public Notice regarding Approval of the Modification in the Generation Licence of FIMCOTEX Industries (Private) Limited (FMTXIPL) | |
07-02-2020 | Public Notice regarding Approval of the Modification-I in the Generation Licence of Indus Wind Energy Limited (IWEL) | |
07-02-2020 | Public Notice regarding Approval of the Modification-I in the Generation Licence of Iran-Pak Wind Power (Pvt.) Limited (IPWPPL) | |
07-02-2020 | Public Notice regarding Approval of the Modification in the Generation Licence of ICI Pakistan Limited (ICIPL) | |
07-02-2020 | Modification-I in the Generation Licence of China Power Hub Generation Company (Private) Limited | |
05-02-2020 | Modification-I in the Generation Licence of Gulf PowerGen (Pvt.) Limited | |
05-02-2020 | Modification-I in the Generation Licence of Shaheen Renewable Energy-1 (Private) Limited | |
05-02-2020 | Modification-I in the Generation Licence of Reshma Power Generation (Pvt.) Limited | |
05-02-2020 | Modification-I in the Generation Licence of Port Qasim Electric Power Company (Private) Limited. | |
05-02-2020 | Modification-I in the Generation Licence of Premier Industrial Chemical manufacturing Company (Pvt.) Limited | |
03-02-2020 | Modification-I in the Generation Licence of Hartford Alternative Energy (Private) Limited | |
03-02-2020 | Modification-I in the Generation Licence of NC Electric Company Limited | |
03-02-2020 | Modification-I in the Generation Licence of Shams Power (Private) Limited | |
03-02-2020 | Public Notice Regarding Approval of the Modification-I in the Generation Licence of SAR Energy (Pvt.) Limited | |
03-02-2020 | Modification-I in the Generation Licence of Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited | |
03-02-2020 | Notice of Admission - Tariff Petition 2019 filed by Northern Power Generation Company Limited for GENCO-III (Old Blocks) | |
Tariff Petition 2019 filed by Northern Power Generation Company Limited for GENCO-III (Old Blocks) | View | |
03-02-2020 | Modification-II in the Generation Licence of Deharki Sugar Mills (Pvt.) Limited | |
03-02-2020 | Modification-I in the Generation Licence of Lucky Electric Power Company Limited | |
03-02-2020 | Modification-I in the Generation Licence of Lotte Chemical Pakistan Limited | |
03-02-2020 | Modification-I in the Generation Licence of Zypher Power (Private) Limited | |
03-02-2020 | Modification-II in the Generation Licence of JDW Sugar Mills Limited | |
03-02-2020 | Public Notice Regarding Approval of the Modification in the Generation Licence of Hi-Tech Pipes & Engineering Industries (Pvt.) Limited (HTP&EIPL) | |
03-02-2020 | Public Notice Regarding Approval of the Modification - II in the Generation Licence of Sanjwal Solar Power (Pvt.) Limited | |
03-02-2020 | Modification-VIII - in the Generation Licence of K-Electric Limited | |
03-02-2020 | Modification-IV - in the Generation Licence of Lucky Energy (Private) Limited | |
03-02-2020 | Modification-III in the Generation Licence of ICI Pakistan PowerGen Limited | |
03-02-2020 | Notice of Admission/ Hearing - regarding Petition filed by TESCO for the determination of its tariff for Supply of electric power for the FY 2019-20. | |
Petition filed by TESCO for Determination of Tariff for Supply of Power for the FY 2019-20 | View | |
Issues in the matter of petition filed by TESCO for determination of its supply/ consumer-end tariff pertaining to the FY 2019-20 | View | |
03-02-2020 | Notice of Admission/ Hearing - regarding Petition filed by TESCO for the determination of its tariff for Supply of electric power for the FY 2018-19. | |
Petition filed by TESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View | |
Issues in the matter of petition filed by TESCO for determination of its supply/ consumer-end tariff pertaining to the FY 2018-19 | View | |
03-02-2020 | Notice of Admission - Generation Licence Application of Pakhtunkhwa Energy Development Organization (PEDO) | |
Application for Generation Licence of PEDO for 40.8 MW KOTO Hydropower Project | View | |
29-01-2020 | Corrigendum to Invitation to Bid - NEPRA Tender No. 001/2020 | |
29-01-2020 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Fatima Energy Limited | |
Application for Modification (LPM) in the Generation Licence of Fatima Energy Limited | View | |
29-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by BTPL for the determination of its tariff for Supply of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by BTPL for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20 | View | |
Issues for Hearing - petition filed by BTPL for determination of consumer-end tariff for Supply of power for the FY 2018-19 & FY 2019-20. | View | |
29-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by BTPL for the determination of its tariff for Distribution of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by BTPL for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20 | View | |
Issues for Hearing - petition filed by BTPL for determination of consumer-end tariff for Distribution of power for the FY 2018-19 & FY 2019-20. | View | |
29-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by TESCO for the determination of its tariff for Distribution of electric power for the FY 2019-20. | |
Petition filed by TESCO for Determination of Tariff for Distribution of Power for the FY 2019-20 | View | |
Issues for Hearing Petition filed TESCO for determination of tariff for distribution of power for the FY 2019-20. | View | |
29-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by TESCO for the determination of its tariff for Distribution of electric power for the FY 2018-19. | |
Petition filed by TESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View | |
Issues for Hearing Petition filed TESCO for determination of tariff for distribution of power for the FY 2018-19. | View | |
29-01-2020 | Notice of Hearing regarding Adjustments Request on Account of Indexation of Multi Year Tariff (MYT) Components for the FY 2019-20 and Prior Year Adjustment in the Consumer end Tariff of FESCO | |
Application of FESCO for Annual Adjustments/ Indexation for the FY 2019-20 and Prior Year Adjustment under Multiyear Tariff (MYT) Regime | View | |
Issues in the matter of adjustment request filed by FESCO for adjustment in tariff for the FY 2019-20. | View | |
28-01-2020 | Re-Scheduling of Hearing - Fuel Charges Adjustment for the Month of November 2019 for EX-WAPDA Distribution Companies | |
23-01-2020 | Notice of Hearing - regarding adjustment request for Indexation of Multi Year Tariff (MYT) components for the FY 2019-20 and Prior Period Adjustment in the Consumer end Tariff of IESCO | |
Adjustment request for Indexation of Multi Year Tariff (MYT) components for the FY 2019-20 and Prior Period Adjustment in the Consumer end Tariff of IESCO | View | |
Issues in the matter of adjustment request filed by IESCO for adjustment in tariff for the FY 2019-20. |
View | |
23-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by MEPCO for the determination of its tariff for Distribution of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by MEPCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View | |
Issues for Hearing - Petition filed by MEPCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View | |
23-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by MEPCO for the determination of its tariff for Supply of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by MEPCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View | |
Issues for Hearing - Petition filed by MEPCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by PESCO for the determination of its tariff for Supply of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by PESCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View | |
Issues for Hearing - Petition filed by PESCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by PESCO for the determination of its tariff for Distribution of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by PESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View | |
Issues for Hearing - Petition filed by PESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by SEPCO for the determination of its tariff for Supply of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by SEPCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View | |
Issues for Hearing - Petition filed by SEPCO for Determination of Tariff for Supply of Power for the FY 2018-19 & 2019-20. | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by SEPCO for the determination of its tariff for Distribution of electric power for the FY 2018-19 & 2019-20. | |
Petition filed by SEPCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View | |
Issues for Hearing - Petition filed by SEPCO for Determination of Tariff for Distribution of Power for the FY 2018-19 & 2019-20. | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by HESCO for the determination of its tariff for Supply of electric power for the FY 2019-20 | |
Petition filed by HESCO for Determination of Tariff for Supply of Power for the FY 2019-20. | View | |
Issues for Hearing - Petition filed by HESCO for Determination of Tariff for Supply of Power for the FY 2019-20. | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by HESCO for the determination of its tariff for Supply of electric power for the FY 2018-19 | |
Petition filed by HESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View | |
Issues for Hearing - Petition filed by HESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by HESCO for the determination of its tariff for Distribution of electric power for the FY 2019-20 | |
Petition filed by HESCO for Determination of Tariff for Distribution of Power for the FY 2019-20 | View | |
Issues for Hearing - Petition filed by HESCO for Determination of Tariff for Distribution of Power for the FY 2019-20. | View | |
22-01-2020 | Notice of Admission/ Hearing - regarding Petition filed by HESCO for the determination of its tariff for Distribution of electric power for the FY 2018-19 | |
Petition filed by HESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View | |
Issues for Hearing - Petition filed by HESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View | |
18-01-2020 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Safe Solar Power (Private) Limited | |
Application for Modification (LPM) in the Generation Licence of Safe Solar Power (Private) Limited | View | |
18-01-2020 | Notice of Admission/ Hearing regarding Petition filed by QESCO for the determination of its tariff for Distribution of electric power for the FY 2019-20 | |
Petition filed by QESCO for Determination of Tariff for Distribution of Power for the FY 2019-20 | View | |
Issues for Hearing - Petition filed by QESCO for determination of tariff for Distribution of power for the FY 2019-20. | View | |
18-01-2020 | Notice of Admission/ Hearing regarding Petition filed by QESCO for the determination of its tariff for Supply of electric power for the FY 2019-20 | |
Petition filed by QESCO for Determination of Tariff for Supply of Power for the FY 2019-20 | View | |
Issues for Hearing - Petition filed by QESCO for determination of tariff for Supply of power for the FY 2019-20 | View | |
18-01-2020 | Addendum to Notice of Admission - Pertaining to Application of Mughal Energy Limited for Grant of Generation Licence | |
17-01-2020 | Hearing regarding Fuel Charges Adjustment for the Month of November 2019 for EX-WAPDA Distribution Companies | |
CPPA Energy Purchase Data for the Month of November 2019 | View | |
CPPA Losses Data for the Month of November 2019 | View | |
17-01-2020 | Grant of Generation Licence No. SPGL/34/2020 Licence Application No. LAG-462 P&G Energy (Private) Limited (P&GEPL) | |
17-01-2020 | Grant of Generation Licence No. SGC/132/2020 Licence Application No. LAG-447 Atlas Energy Limited (ATEL) | |
17-01-2020 | Grant of Generation Licence No. SPGL/33/2020 Licence Application No. LAG-427 Enertech Bostan Solar (Private) Limited (EBSPL) | |
15-01-2020 | Order of the Authority in the matter of Review Petition filed by Lahore Electric Supply Company Limited against the Decision of the Authority dated December 21, 2016 in the matter of grant of Distribution Licence No. 23/DL/2016 dated December 26, 2016 to Defence Housing Authority Phase-XII (EME) Sector, Lahore | |
11-01-2020 | Notice of Admission/ Hearing regarding Petition filed by QESCO for the determination of its tariff for distribution of electric power for the FY 2018-19 | |
Petition filed by QESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View | |
Issues for Hearing Petition filed by QESCO for Determination of Tariff for Distribution of Power for the FY 2018-19 | View | |
11-01-2020 | Notice of Admission/ Hearing - QESCO has filed petition with the NEPRA for the determination of its tariff for supply of electric power for the FY 2018-19 | |
Petition filed by QESCO for Determination of Tariff for Supply of Power for the FY 2018-19 | View | |
Issues for Hearing Petition filed by QESCO for Determination of Tariff for Supply of Power for the FY 2018-19 |
View | |
09-01-2020 | Notice of Admission/ Hearing - Petition for Modification of Reference EPC Stage Tariff for 147 MW Patrind Hydropower Project | |
List of Issues for Hearing - Tariff Modification Petition of 147 mw Patrind Hydro Power | ||
09-01-2020 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of K-Electric Limited (KEL) | |
Application of Licensee Proposed Modification (LPM) in the Generation Licence of K-Electric Limited (KEL) | ||
03-01-2020 | Notice - Licensee Proposed Modification (LPM) in the Generation Licence of Engro Polymer & Chemicals Limited | |
Application for Modification in the Generation Licence of M/s Engro Polymer & Chemicals Ltd. | ||
03-01-2020 | Notice of Admission - Application of AB Solar Park Private Limited for Grant of Generation Licence | |
Application for a (Generation licence for 20 MWp AB Solar Park Private Limited | ||
01-01-2020 | Decision of the Authority in the matter of Fuel Charges Adjustment for the Month of October 2019 for XWDISCOs along with Notification Thereof |
31-12-2019 | Decision of the Authority in the matter of Quarterly Adjustments of K-Electric Limited for the period from July 2016 to March 2019 | |
31-12-2019 | Modification-II in Generation Licence No. SGC/96/2013 Licence Application No. LAG-222 Fatima Energy Limited (FEL) | |
31-12-2019 |
Modification-II in Generation Licence
No. SGC/124/2018 Licence Application
No. LAG-359 Premier Industrial
Chemical Manufacturing Company
(Private) Limited (PICMPL) |
|
27-12-2019 | Decision of the Authority in the matter of Fuel Charges Adjustments for the Period from July 2016 to June 2019 for K-Electric Limited and Notification (S.R.O. 1621(1)/2019 dated 27.12.2019) Thereof | |
27-12-2019 | Grant of Generation Licence No. SPGL/30/2019 Licence Application No. LAG-435 FAS Energy Power (SMC-Private) Limited (FEPSMCPL) | |
27-12-2019 | Grant of Generation Licence No. SPGL/29/2019 Licence Application No. LAG-431 Kulachi Solar Power (Private) Limited (KSPPL) | |
27-12-2019 | Modification in Generation Licence No. SGC/98/2014 Licence Application No. LAG-238 FIMCOTEX Industries (Private) Limited (FMTXIPL) | |
27-12-2019 | Hearing on Petitions for Modification in the Matter of Tariff Determination of 12 Wind Power Projects | |
Petition for Modification in the Matter of Tariff Determination of Indus Wind Energy Limited | ||
Petition for Modification in the Matter of Tariff Determination of Master Green Energy Ltd. | ||
Petition for Modification in the Matter of Tariff Determination of NASDA Green Energy (Pvt.) Ltd. | ||
Petition for Modification in the Matter of Tariff Determination of Gul Ahmed Electric Limited | ||
Petition for Modification in the Matter of Tariff Determination of Lakeside Energy Private Limited | ||
Petition for Modification in the Matter of Tariff Determination of Tricorm Wind Power (Private) Limited | ||
Petition for Modification in the Matter of Tariff Determination of Metro Wind Power Limited | ||
Petition for Modification in the Matter of Tariff Determination of Liberty Wind Power 1 (Private) Limited | ||
Petition for Modification in the Matter of Tariff Determination of Liberty Wind Power 2 (Private) Limited | ||
Petition for Modification in the Matter of Tariff Determination of Artistic Wind Power Private Limited. | ||
Petition for Modification in the Matter of Tariff Determination of ACT2 Wind (Private) Limited | ||
Petition for Modification in the Matter of Tariff Determination of DIN Energy Limited | ||
14-12-2019 | Notice for Filing of Regulatory Accounts and Audited Financial Statements by Generation, Transmission and Distribution Licensees | |
14-12-2019 | Publication of draft National Electric Power Regulatory Authority Licencing (Application, Modification, Extension and Cancellation) Procedure Regulations, 2019 for eliciting public opinion | |
14-12-2019 | Hearing regarding Fuel Charges Adjustment for the month of October 2019 for EX-WAPDA Distribution Companies | |
CPPAG Energy Purchase Data for the month of October 2019 | ||
13-12-2019 | GGrant of Generation Licence No. WPGL/58/2019 Licence Application No. LAG-436 Moro Power Company (Private) Limited (MPCPL) | |
13-12-2019 | Grant of Generation Licence No. SGC/131/2019 Licence Application No. LAG-429 U.S Apparel and Textiles (Private) Limited (USA&TPL) | |
10-12-2019 | Grant of Generation Licence No. SGC/130/2019 Licence Application No. LAG-437 Grid Edge (Private) Limited (SEPL) | |
10-12-2019 | Grant of Generation Licence No. WPGL/56/2019 Licence Application No. LAG-440 Sino Well (Private) Limited (SWPL) | |
10-12-2019 | Grant of Generation Licence No. SPGL/28/2019 Licence Application No. LAG-443 Asia Energy (Private) Limited (AEPL) | |
10-12-2019 | Grant of Generation Licence No. WPGL/57/2019 Licence Application No. LAG-439 Shafi Energy (Private) Limited (SEPL) | |
10-12-2019 | NEPRA imposes fine on KEL and directs to complete earthing/grounding of its distribution System | |
05-12-2019 | Notice of Admission/ Hearing: Tariff Petition filed by P&G Energy (Pvt) Ltd for the Determination of Generation Tariff i.r.o 50 MWp Solar PV Power Plant | |
Application for Tariff Petition for 50 MW P&G Energy Pvt Ltd | ||
05-12-2019 | Notice of Admission/ Hearing: Tariff Petition filed by ZhenfaPakistan New Energy Company (Pvt) Ltd for the Determination of Generation Tariff i.r.o 100 MWp Solar PV Power Plant | |
Application for Tariff Petition for 50 MW ZhenfaPakistan New Energy Company (Pvt) Ltd | ||
05-12-2019 | Notice of Admission/ Hearing: Tariff Petition filed by Helios Power (Pvt) Ltd for the Determination of Generation Tariff i.r.o 50 MWp Solar PV Power Plant | |
Application for Tariff Petition for 50 MW Helios Power (Pvt) Ltd | ||
05-12-2019 | Notice of Admission/ Hearing: Tariff Petition filed by Meridian Energy (Pvt) Ltd for the Determination of Generation Tariff i.r.o 50 MWp Solar PV Power Plant | |
Application for Tariff Petition for 50 MW Meridian Energy (Pvt) Ltd | ||
05-12-2019 | Notice of Admission/ Hearing: Tariff Petition filed by HNDS Energy (Pvt) Ltd for the Determination of Generation Tariff i.r.o 50 MWp Solar PV Power Plant | |
Application for Tariff Petition for 50 MW HNDS Energy (Pvt) Ltd | ||
05-12-2019 | TARIFF NOTIFICATIONS OF DISCOs: Notifications Nos. SRO. 1469(1)/2019 to SRO.1478(1)/2019 dated November 29, 2019 | |
05-12-2019 | Determination of the Authority in the matter of Competitive Trading Bilateral Contract Market Model (CTBCM) submitted by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) | |
03-12-2019 | Notice : Licensee Proposed Modification (LPM) in the Generation Licence of Pakhtunkhwa Energy Development Organization for its 18 MW PEHUR Hydropower Project | |
Licensee Proposed Modification (LPM) of Pakhtunkhwa Energy Development Organization for its 18 MW PEHUR Hydropower Project | ||
02-12-2019 | Grid Code Addendum No. 2 (Revision-1) for Grid Integration of Photovoltaic (PV) & Concentrated Solar Power (CSP) Plants | |
02-12-2019 |
Press Release 2nd Chairman CUP Inter-Departmental Cricket Tournament |
|
02-12-2019 |
Notice of
Admission/ Hearing: Sapphire Hydro
Power Limited
for
150 MW Sharmai Hydro Power Project
for feasibility stage Tariff |
|
Tariff Petition filed by Sapphire Hydro Power Limited | View | |
List of issues for Sapphire Hydro Power Limited Hearing | ||
27-11-2019 |
Notice -
Licensee Proposed Modification (LPM)
in the Generation Licence of ACT2
Wind (Private) Limited |
|
Application for a Licensee Proposed Modification of ACT2 Wind (Private) Limited | ||
26-11-2019 |
Decision of the
Authority in the matter of Requests
filed by XWDISCOs regarding
Periodic Adjustment in Tariff
for 1st Quarter of FY 2019-20 |
|
22-11-2019 |
Notice -
Licensee Proposed Modification (LPM)
in the Generation Licence of
Liberty Wind Power 2 (Private)
Limited
Formerly Noor Solar Energy
(Private) Limited |
|
Application for a Licensee Proposed Modification of Generation Licence of Liberty Wind Power 2 (Private) Limited | ||
22-11-2019 |
Notice -
Licensee Proposed Modification (LPM)
in the Generation Licence of
Liberty Wind Power 1 (Private)
Limited
Formerly Zulaikha Energy
(Private) Limited |
|
Application for a Licensee Proposed Modification of Generation Licence of Liberty Wind Power 1 (Private) Limited | ||
21-11-2019 |
Decision of the
Authority in the matter of Fuel
Charges Adjustment for the Month
of September 2019 for XWDISCOs
along with Notification Thereof |
|
21-11-2019 |
Decision of the
Authority in the matter of Tariff
Petition filed by Gul Ahmed
Energy Limited for approval of
Generation Tariff for RFO Based
Power Plant of 136.17 MW (Gross) at
Karachi for PPA Term Extension |
|
21-11-2019 |
Hearing -
Notice of Suo Moto Proceedings
-
Upfront Generation Tariff for
Muncipal Solid Waste Power Project
Request for Extension of Upfront
Tariff for MSW Power Plants by
Government of Khyber Pakhtunkhwa |
|
14-11-2019 |
NEPRA Annual
Procurement Plan for the Year
2019-20 (Under Rule 8 and
9 of the Public Procurement Rules
2004) |
|
14-11-2019 |
Notice of
Hearing - Hearing Regarding
Quarterly Adjustments of XWDISCOs
on Account of Variation in Power
Purchase Price (PPP) for the Quarter
July to September 2019 |
|
Application for Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the Quarter July to September 2019 | ||
Ministry of Energy Letter w.r.t Quarterly Adjustments of XWDISCOs on Account of Variation in Power Purchase Price (PPP) for the Quarter July to September 2019 | ||
14-11-2019 |
Notice -
Licensee Proposed Modification (LPM)
in the Generation Licence of
NASDA Green Energy (Private) Limited |
|
Application of a Licensee Proposed Modification (LPM) in the Generation Licence of NASDA Green Energy (Private) Limited | ||
13-11-2019 | Determination of the Authority in the matter of Petition filed by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) for Determination of Market Operator Fee for the FY 2018-19 | |
13-11-2019 | Grant of Generation Licence No. IGSPL/104/2019 Licence Application No. LAG-408 CHIC Pak Power Company Limited (CIHCPPCL) | View |
09-11-2019 | Notice of Public Hearing in the Matter of Amendments in the Commercial Code Proposed by the Commercial Code Review Panel | View |
Amendments in Commercial Code proposed by Commercial Code Review Panel | View | |
05-11-2019 | Press Release: CPPA-G in its monthly Fuel Charges Adjustment (FCA) for the month of September 2019, requested an increase in tariff of Rs. 2.9726/kWh. The Authority after adjusting the Generation Cost of Current month by Rs. 2.852 billion, previous adjustment by Rs. 4.994 billion and excluding the cost of Furnace Oil to the extent of Rs. 7.234 billion has considered an increase of Rs. 1.8266/kWh for the month of September 2019. The disallowed cost of furnace oil may be considered in subsequent FCA, subject to provision of information by NPCC/CPPA-G as per the direction of the Authority. |
|
05-11-2019 |
Grant of Transmission Licence to act as Provincial Grid Company - Licence Application No. LAT-06 - Sindh Transmission & Dispatch Company (Private) Limited (ST&DCPL) |
|
02-11-2019 | Notice of Admission Application of
Solution De Energy (Private) Limited for the Grant of Generation Licence |
View |
Application of Solution De Energy (Private) Limited for the Grant of Generation Licence | View | |
31-10-2019 | Notice
of Admission Application of Solis Alpha Energy (Private) Limited
for the Grant of Generation Licence
(Chhor) |
View |
Application of Solis Alpha Energy (Private) Limited for the Grant of Generation Licence | View | |
31-10-2019 | Notice of Admission Application of Solis Alpha Energy (Private) Limited for the Grant of Generation Licence
(Pano Aqil) |
View |
Application of Solis Alpha Energy (Private) Limited for the Grant of Generation Licence | View | |
31-10-2019 | Notice of Admission Application of Solis Bravo Energy (Private) Limited for the Grant of Generation Licence (Bahawalpur) | View |
Application of Solis Bravo Energy (Private) Limited for the Grant of Generation Licence | View | |
31-10-2019 | Notice of Admission Application of Solis Charlie Energy (Private) Limited for the Grant of Generation Licence (D.I.Khan & Kohat) | View |
Application of Solis Charlie Energy (Private) Limited for the Grant of Generation Licence | View | |
31-10-2019 | Notice of Admission Application of Solis Delta Energy (Private) Limited for the Grant of Generation Licence | View |
Application of Solis Delta Energy (Private) Limited for the Grant of Generation Licence | View | |
30-10-2019 | Notice of Admission Application of Solis Alpha Energy (Private) Limited for the Grant of Generation Licence
(Malir Karachi) |
View |
Application of Solis Alpha Energy (Private) Limited for the Grant of Generation Licence | View | |
30-10-2019 | Notice of Admission Application of Solis Bravo Energy (Private) Limited for the Grant of Generation Licence (Lahore & Okara) | View |
Application of Solis Bravo Energy (Private) Limited for the Grant of Generation Licence | View | |
30-10-2019 | Notice of Admission Application of Solis Charlie Energy (Private) Limited for the Grant of Generation Licence (Rawalpindi) | View |
Application of Solis Charlie Energy (Private) Limited for the Grant of Generation Licence | View | |
30-10-2019 | Notice of Admission Application of Grid Edge (Private) Limited for the Grant of Generation Licence | View |
Application of Grid Edge (Private) Limited for the Grant of Generation Licence | View | |
30-10-2019 | Notice of Admission Application of P&G (Private) Limited for the Grant of Generation Licence | View |
Application of P&G (Private) Limted for the Grant of Generation Licence | View | |
25-10-2019 | Modification in Generation Licence No. WPGL/36/2016 Licence Application No. LAG-348 Norinco International Thatta Power (Private) Limited (NITPPL) | View |
23-10-2019 | Decision of the Authority in the matter of Fuel Charges Adjustment for the Month of August 2019 for XWDISCOs along with Notification Thereof | View |
22-10-2019 | Hearing Regarding Fuel Charges Adjustment for the Month of September 2019 for EX-WAPDA Distribution Companies | View |
Energy purchase data for the month of September 2019 | View | |
21-10-2019 | Notice of Public Hearing : Regarding Authority Proposed Modification (APM) in the Existing Distribution Licence of LESCO | View |
Authority Proposed Modification in the existing Distribution Licence of LESCO and LESCO Reply | View | |
21-10-2019 | Notice of Public Hearing : Regarding Authority Proposed Modification (APM) in the Existing Distribution Licence of FESCO | View |
Authority Proposed Modification in the existing Distribution Licence of FESCO and FESCO Reply | View | |
21-10-2019 | Notice of Public Hearing : Regarding Authority Proposed Modification (APM) in the Existing Distribution Licence of HESCO | View |
Authority Proposed Modification in the existing Distribution Licence of HESCO and HESCO Reply | View | |
21-10-2019 | Notice of Public Hearing : Regarding Authority Proposed Modification (APM) in the Existing Distribution Licence of PESCO | View |
Authority Proposed Modification in the existing Distribution Licence of PESCO and PESCO Reply | View | |
21-10-2019 | Notice of Public Hearing : Regarding Authority Proposed Modification (APM) in the Existing Distribution Licence of MEPCO | View |
Authority Proposed Modification in the existing Distribution Licence of MEPCO and MEPCO Reply | View | |
21-10-2019 | Notice of Public Hearing : Regarding Authority Proposed Modification (APM) in the Existing Distribution Licence of TESCO | View |
Authority Proposed Modification in the existing Distribution Licence of TESCO and TESCO Reply | View | |
21-10-2019 |
Notice of Public Hearing : Regarding Authority Proposed Modification (APM) in the Existing Distribution Licence of DHA | View |
Authority Proposed Modification in the existing Distribution Licence of DHA and DHA Reply | View | |
14-10-2019 |
Modification-I in Generation Licence No. WPGL/52/2017 Licence Application No. LAG-398 Master Green Energy Limited (MGEL) | View |
14-10-2019 |
Modification-I in Generation Licence No. IGSPL/49/2015 Licence Application No. LAG-285 Engro Powergen Thar (Private) Limited (EPGTPL) | View |
11-10-2019 |
Notice of Admission :
Generation Licence Application of
Pakistan Atomic Energy Commission (PAEC)
for its Karachi Nuclear Power Plant
Unit-2 (KANUPP-2) |
View |
11-10-2019 |
Notice: Licensee Proposed
Modification (LPM) in the Generation
Licence of Artistic Wind Power (Pvt)
Ltd |
View |
Application of Licensee Proposed
Modification of Artistic Wind Power (Pvt)
Ltd i.r.o the Generation License No.
WPGL/41/2017 |
View | |
09-10-2019 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Months
of June & July 2019 for XWDISCOs along
with Notification Thereof |
View |
08-10-2019 |
Grant of Generation Licence No. WPGL/55/2019
Licence Application No. LAG-348
Burj Wind Energy (Private) Limited (BWEPL) |
View |
08-10-2019 |
Notice: Licensee Proposed
Modification (LPM) in the Generation Licence of
Access Solar (Private) Limited |
View |
Application for Modification of
the Generation License of Access
Solar (Private) Limited |
View | |
08-10-2019 |
Notice: Licensee Proposed
Modification (LPM) in the Generation Licence of
Access Electric (Private) Limited |
View |
Application for Modification of
the Generation License of Access
Electric (Private) Limited |
View | |
07-10-2019 |
Consolidated Mark Sheet
Final Presentation for 6th open competition of National Electric Power Regulatory Authority held on October 02, 2019 at NEPRA Tower |
View |
07-10-2019 |
Grant of Generation Licence No. WPGL/50/2017
Licence Application No. LAG-394
Indus Wind Energy Limited (IWEL)
along with
Modification-I |
View |
05-10-2019 |
Re-Scheduling of Hearing - Determination of reference Generation Tariff of Moro Power Company (Pvt) Ltd, Norinco International (Pvt) Ltd, Iran-Pak Wind Power (Pvt) Ltd, K1 Solar Power Lahore (Pvt) Ltd, Zorlu Solar Pakistan (Pvt) Ltd. |
|
04-10-2019 |
Grant of Generation Licence No. WPGL/46/2017
Licence Application No. LAG-385 Liberty Wind
Power 2
(Private) Limited (LWPPL) |
View |
04-10-2019 |
Grant of Generation Licence
No. WPGL/45/2017
Licence Application No. LAG-351
Iran-Pak Wind Power (Private) Limited along
with Modification-I (IPWPPL) |
View |
03-10-2019 |
Grant of Distribution Licence No. 25/DL/2019
Licence Application No. LAD-47
Aujla & Associates Town Developers (Private) Limited |
|
02-10-2019 |
Notice of Admission/ Hearing : Tariff Petition filed
by Zorlu Solar Pakistan (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 100 MWp Solar Power Project |
View |
Tariff Petition filed
by Zorlu Solar Pakistan (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 100 MWp Solar Power Project |
View | |
02-10-2019 |
Notice of Admission/ Hearing : Tariff Petition filed
by K1 Solar Power Lahore (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 15 MWp Solar Power Project |
View |
Tariff Petition filed
by K1 Solar Power Lahore (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 15 MWp Solar Power Project |
View | |
02-10-2019 |
Notice of Admission/ Hearing : Tariff Petition filed
by Iran-Pak Wind Power (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 50 MW Wind Power Project |
View |
Tariff Petition filed
by Iran-Pak Wind Power (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 50 MW Wind Power Project |
View | |
02-10-2019 |
Notice of Admission/ Hearing : Tariff Petition filed
by Norinco International Thatta Power (Pvt) Limited
for the Determination of reference Generation Tariff
in respect of 100 MW Wind Power Project |
View |
Tariff Petition filed
by Norinco International Thatta Power (Pvt) Limited
for the Determination of reference Generation Tariff
in respect of 100 MW Wind Power Project |
View | |
02-10-2019 |
Notice of Admission/ Hearing : Tariff Petition filed
by Moro Power Company (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 25 MW Wind Power Project |
View |
Tariff Petition Filed
by Moro Power Company (Pvt) Limited for the
Determination of reference Generation Tariff in
respect of 25 MW Wind Power Project |
View | |
01-10-2019 |
Grant of Generation Licence No. SGC/129/2019
Licence Application No. LAG-363
Lake City Management (Private) Limited (LCMPL) |
View |
28-09-2019 |
Publication of draft National Electric Power
Regulatory Authority Special Purpose Transmission
Licence (Fee) Regulations, 2019 for eliciting public
opinion |
View |
28-09-2019 |
Publication of draft amendments to the National
Electric Power Regulatory Authority (Import of
Power) Regulations for eliciting public opinion |
View |
27-09-2019 |
Interim Decision of the Authority in the matter of
Request filed by
Ministry of Energy regarding Annual Adjustment /
Indexation of
Distribution Margin of XWDISCOs |
View |
27-09-2019 |
Decision of the Authority in the matter of Requests
filed by XWDISCOs
regarding Periodic Adjustments in Tariff for 3rd &
4th Quarters of
FY 2018-2019 |
View |
26-09-2019 |
Draft Indicative Generation Capacity Expansion Plan
(IGCEP) 2018-40 for comments of stakeholders/general public |
|
25-09-2019 |
Preliminary short listing of accredited advertising agencies for placement on nepra panel - open competition 2019 |
|
25-09-2019 |
Hearing Regarding Fuel Charges Adjustment for the
Month of August 2019 for Ex-WAPDA Distribution
Companies |
|
CPPA-G
Energy Purchase Data for the Month of August 2019 |
||
20-09-2019 |
Draft Amended Consumer Service Manual (CSM) for
information/comments of general public |
|
16-09-2019 |
Press Release SAARC Training for
Professionals of Afghanistan on Pakistan’s Power
Regulatory System Scheduled to be held from 16th -
20th September 2019. |
|
14-09-2019 |
Notice of Hearing:
Regarding Quarterly Adjustment of XWDISCOs on account of
variation in Power Purchase Price (PPP) for the
Quarter January to March 2019 and April to June 2019 |
|
Request for Adjustment of Tariff Components for Financial Year 2018-19 (3rd Quarter) under Multi Year Tariff regime |
||
Request for Adjustment
of Tariff Components for Financial Year 2018-19 (4th
Quarter) under Multi Year Tariff regime |
||
Power Purchase Price
Forecast. A Report by Central Power Purchasing
Agency FY 2019-20 |
||
12-09-2019 |
Notice :
Licencsee Proposed Modification (LPM) in the
Generation Licence of Fatima Energy Limited |
|
Application for Licensee
Proposed Modification of the Generation Licence of
Fatima Energy Limited |
||
07-09-2019 |
Notice of Admission:
Tariff Petition filed by FFBL Power Company Limited for
tariff determination of additional supply of 8MW to K-Electric
Limited |
|
FPCL Petition for Additional 8
MW |
||
Addendum-FPCL Petition for
Additional 8 MW |
||
06-09-2019 |
Press Release
- Investigation Report about K-Electric |
|
03-09-2019 |
Regulatory Accounts 2016 FY 30-06-2016 Filed by K-Electric Ltd.10-10-2017_9472 | View |
FCA Presentation - July 16 to June 2019 K-Electric | View | |
30-08-2019 |
Enertech Quetta Solar Power Generation Licence |
|
30-08-2019 |
Notice of Admission:
Application of Artistic Solar Energy (Pvt) Ltd
for Grant of Generation Licence |
|
Generation Licence Application of Artistic Solar Energy Pvt Ltd |
||
29-08-2019 |
Notice of Hearing:
Regarding Fuel Charges Adjustment for the Month of July
2019 for EX-WAPDA Distribution Companies |
|
CPPA-G
Energy Purchase Data for the Month of July 2019 |
||
28-08-2019 |
Licensee Proposed Modification (LPM) in
the Generation Licence of Lucky Cement Limited |
|
LPM for Lucky Cement Limited |
||
26-08-2019 |
Notice Licensee Proposed
Modification (LPM) in the Generation Licence of NC Electric
Company Limited |
|
Application for Licensee Proposed
Modification of the Generation License NC Electric Company
Limited |
||
23-08-2019 |
List of Advertising Agencies submitted
their profiles for the 6th Open Competition 2019 |
|
17-08-2019 |
Press Release - Initiation of Formal Investigation against
K-Electric |
|
10-08-2019 |
Notice of Hearing
- Petition filed by National Power Parks
Management Company (Private) Limited for
Modification of Tariff for its RLNG based Power
Plant at Haveli Bahadur Shah, Punjab |
|
10-08-2019 |
Notice of Hearing
- Petition filed by National Power Parks Management Company
(Private) Limited for Modification of Tariff for its RLNG based
Power Plant at Balloki, Punjab |
|
09-08-2019 |
Notice of Public Hearing in the Matter of
Application of Sindh Transmission & Despatch
Company Limited for the Grant of Licence as
Provincial Grid Company |
|
Issues framed by the
Authority in the Matter of Application of
Sindh Transmission & Despatch Company Limited
for the Consideration of Grant of Provincial Grid
Company |
||
Comments/ Objections
of the stake holders in
the Matter of Application of Sindh Transmission &
Despatch Company Limited for Grant of Licence as
Provincial Grid Company |
||
Notice of Admission
- Application of Sindh Transmission & Dispatch
Company (Pvt.) Limited for Grant of Transmission
Licence for Provincial Grid Company |
||
Application of
Sindh Transmission & Dispatch Company (Pvt.)
Limited for Grant of Transmission Licence for
Provincial Grid Company- |
||
08-08-2019 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Habibullah
Coastal Power Company (Private) Limited (HCPCPL) |
|
Petition
for Licensee Proposed Modification of License No. IPGL/02/2003 of
Habibullah Coastal Power Company (Private) Limited (HCPCPL) |
||
08-08-2019 |
Monthly Fuel Price
Adjustments in the matter of K-Electric
for the period July 2016 to June 2019, Quarterly
Adjustments from Quarter ending September 2016
till Quarter ending March 2019 and annual adjustment
& indexation under the K-Electric Multi Year Tariff
2017-2023 |
|
K-Electric request
for Monthly and Quarterly Variation for the period
July 2016 to April 2019 under Multi-year Tariff -
2023 |
||
K-Electric
request for quarterly variations for the quarters
ended June 2017 and June 2018 (revised) under
Multi-year Tariff 2017-2023 |
||
01-08-2019 |
||
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Metro Wind Power Limited |
||
Application for
a Licensee Proposed Modification of Generation
Licence of Metro Wind Power Limited |
||
01-08-2019 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Gul Ahmed Electric Limited |
|
Application for
a Licensee Proposed Modification of Generation
Licence of Gul Ahmed Electric Limited |
||
31-07-2019 |
Determination of the Authority in the
matter of Petition filed by National Transmission & Despatch
Company Ltd. (NTDC) for Determination of Transfer/Wheeling
Charges for the FY 2017-18 and FY 2018-19 |
|
30-07-2019 |
Withdrawal Proceedings
of Upfront Tariff for Existing Sugar Mills Operating
under Captive Mode |
|
30-07-2019 |
Press Release
-
NEPRA issued directive to all distribution
companies regarding delays in replacement / repair
of damaged transformers |
|
29-07-2019 |
Press Release
-
NEPRA took serious notice of power outages & loss
of human lives in Karachi |
|
27-07-2019 |
||
Hearing
Regarding Fuel Charges Adjustment for the Month of
June 2019 for EX-WAPDA Distribution Companies |
||
CPPA-G
Energy Purchase Data for the Month of June 2019 |
||
20-07-2019 |
Notice of Admission
- Application of Shams Power (Private) Limited
for the Grant of Generaiton Licence |
|
16-07-2019 |
||
Decision of National
Electric Power Regulatory Authority in the matter of
Suo Moto Review Proceedings regarding
Modification of Fuel Price Mechanism of
Bagasse Based Power Projects |
||
09-07-2019 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of May 2019 for
XWDISCOs along with Notification Thereof |
|
03-07-2019 |
Tariff Notification of Quarterly Adjustment for
Ex-WAPDA
notification no.S R.O's.660(1)/2019, 661(1)/2019,
662(1)/2019, 663(1)/2019, 664(1)/2019,
665(1)/2019, 666(1)/2019, 667(1)/2019,
668(1)/2019, 669(1)/2019 |
|
29-06-2019 |
||
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of
Master Power
(Private) Limited |
||
M/S Master Power
(Private) Limited - Proposed Modification of the
Generation Licence |
||
29-06-2019 |
Notice
- Licensee Proposed Modification (LPM) in the
Generation Licence of Gharo Solar (Private)
Limited |
|
Licensee Proposed
Modification Application for 50MWp Solar PV Power
Project by Gharo Solar Limited |
||
28-06-2019 |
||
Press Release - NEPRA issued
directive to all Distribution Companies
regarding charging of cost of energy meter on
account of meter display error |
||
28-06-2019 |
Notice of Admission
- Petition filed by National Power Parks
Management Company (Private) Limited for
Modification of Tariff dated August 9, 2016 of RLNG
Based Power Plant at Balloki, Kasur, Jhang |
|
Tariff Modification Petition filed by National Power
Parks Management Company for its Balloki Power
Project |
||
28-06-2019 |
||
Notice of Admission
- Petition filed by National Power Parks
Management Company (Private) Limited for
Modification of Tariff dated August 9, 2016 of RLNG
Based Power Plant at Haveli Bahadue Shah,
Jhang |
||
Tariff Modification Petition filed by National Power
Parks Management Company for its Haveli Bahadur
Shah Power Project |
||
21-06-2019 |
Hearing
regarding Fuel Charges Adjustment for the Month of
May 2019 for Ex-WAPDA Distribution Companies |
|
CPPA Energy
Purchase Data for the month of May 2019 |
||
CPPA Energy
Purchase data (Fuel Cost per Unit) |
||
15-06-2019 |
||
Notice of Admission
- Application of Mughal Energy Limited for
Grant of Generation Licence |
||
Application of
Mughal Energy Limited for Grant of Generation
Licence |
||
14-06-2019 |
Decision of the
Authority in the matter of Requests filed by
XWDISCOs regarding Periodic Adjustment in
Tariff for 1st and 2nd Quarters of FY 2017-18 |
|
12-06-2019 |
||
Rescheduling of
Hearing -
Tariff Petition filed by Gul Ahmed Energy Limited
for Approval of Generation Tariff for RFO
based Power Plant of 136.17 MW (Gross) at Karachi |
||
12-06-2019 |
Rescheduling of
Hearing -
Tariff Petition filed by Tapal Energy (Private)
Limited for Approval of Generation Tariff for
RFO based Power Plant of 126 MW (Gross) at Karachi |
|
12-06-2019 |
||
Notice of Admission
- Application of Engro Energy Limited for the
Grant of Generation Licence for Kuchlak-IV
Solar PV Plant |
||
Engro Energy Limited
Application for Generation Licence for 50 MWp
Kuchlak-IV Solar PV Plant |
||
12-06-2019 |
Notice of Admission
- Application of Engro Energy Limited for the
Grant of Generation Licence for Kuchlak-III
Solar PV Plant |
|
Engro Energy Limited
Application for Generation Licence for 50 MWp
Kuchlak-III Solar PV Plant |
||
12-06-2019 |
||
Notice of Admission
- Application of Engro Energy Limited for the
Grant of Generation Licence for Kuchlak-II
Solar PV Plant |
||
Engro Energy Limited
Application for Generation Licence for 50 MWp
Kuchlak-II Solar PV Plant |
||
12-06-2019 |
Notice of Admission
- Application of Engro Energy Limited for the
Grant of Generation Licence for Kuchlak-I
Solar PV Plant |
|
Engro Energy Limited
Application for Generation Licence for 50 MWp
Kuchlak-I Solar PV Plant |
||
04-06-2019 |
||
Notice of Hearing
- Tariff Petition filed by Gul Ahmed Energy
Limited for Approval of Generation Tariff for
RFO based Power Plant of 136.17 MW (Gross) at
Karachi |
||
04-06-2019 |
Notice of Hearing
- Tariff Petition filed by Tapal Energy (Private)
Limited for Approval of Generation Tariff for
RFO based Power Plant of 126. MW (Gross) at Karachi |
|
03-06-2019 |
Decision of the Authority in the matter of
Fuel Charges Adjustment for the Month of April 2019 for XWDISCOs
along with Notification Thereof |
|
01-05-2019 |
||
Notice of Admission
- Application of Shams Power (Private) Limited
for the Grant of Generation Licence |
||
Application of Shams Power (Private) Limited
for the Grant of Generation Licence |
||
31-05-2019 |
Decision of the
Authority in the matter of Motion for Leave
for Review filed by CIHC Pak Power
Company Limited against the Decision
dated 19.12.2018 |
|
31-05-2019 |
Decision of
National Electric Power Regulatory Authority
in the matter of Motion for Leave for Review
filed by Harappa Solar (Private) Limited
(HSPL) against Decision of the Authority
dated 20.11.2018 |
|
30-05-2019 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of
Engro Powergen Thar (Private) Limited |
|
Application for
Modification of Generation Licence of
Engro Powergen Thar (Private) Limited |
||
28-05-2019 |
||
Notice of Admission
- Application of Solis Energy Gen 1 (Private)
Limited for the Grant of Generation Licence |
||
Application of Solis
Energy Gen 1 (Private) Limited for the Grant of
Generation Licence |
||
28-05-2019 |
Notice of Admission
- Application of Nishat Hotels and Properties
Limited for the Grant of Generation Licence |
|
Application of
Nishat Hotels and Properties Limited for the
Grant of Generation Licence |
||
28-05-2019 |
||
Notice of Admission
- Application of Nizam Power (Private) Limited
for the Grant of Generation Licence |
||
Application of Nizam
Power (Private) Limited for the Grant of
Generation Licence |
||
28-05-2019 |
Notice of Admission
- Application of K1 Solar Power Lahore (Private)
Limited for the Grant of Generation Licence |
|
Application of K1
Solar Power Lahore (Private) Limited for the
Grant of Generation Licence |
||
25-05-2019 |
||
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Water & Power Development
Authority (WAPDA) |
||
Licensee Proposed
Modification (LPM) in the Existing Licence of
WAPDA Hydroelectric (Changes in the TOtal
Capacity Values of Two Hydropower Projects |
||
24-05-2019 |
Press Release - NEPRA takes Notice of
Safety Incident in
GEPCO |
|
18-05-2019 |
||
Hearing -
Regarding Fuel Charges Adjustment for the Month of
April 2019 for EX-WAPDA Distribution Companies |
||
CPPAG
Energy Purchase data for the Month of April 2019 |
||
16-05-2019 |
Notice of Hearing - Proceedings in the Matter
of Excessive Profits of RFO Based Independent Power
Producer (IPP) M/s Nishat Chunian Power Limited
established under Power Policy for Generation |
|
14-05-2019 |
||
Press Release -
NEPRA took Notice of
Fatal Accident in MEPCO on 12-05-2019 |
||
11-05-2019 |
Notice - Licensee Proposed Modification (LPM)
in the Generation Licence of Master Green Energy
Limited |
|
Application of Master Green Energy Limited
for the Modification of the Generation Licensee |
||
03-05-2019 |
||
Notice of Admission - Application of ENI
New Energy Pakistan (Private) Limited for Grant
of Generation Licence |
||
Application of ENI
New Energy Pakistan (Private) Limited for Grant
of Generation Licence in respect of Bhit 10 MW Solar
Power Project |
||
02-05-2019 |
Press Release- Rebuttal by NEPRA on News tickers on 2nd
May, 2019 |
|
02-05-2019 |
||
Request For Proposal (RFP) - Hiring of
services of category ‘A’ or ‘B’ Chartered
Accountants Firms in the panel of auditors of SBP/NEPRA
to carry out annual audit of NEPRA accounts for the
financial year ending June 30, 2019 |
||
01-05-2019 |
||
Notice of Admission/
Hearing - Petition filed by Central Power
Purchasing Agency (Guarantee) Limited (APPA-G)
for Determination of its Market Operation Fee for
the FY 2018-19 |
||
CPPA-G Petition
for the Determination of Market Operation Fee for
the Financial Year 2018-19 |
||
Issues for hearing - CPPA-G Petition for
determination of market operation fee for the FY
2018-19 |
||
30-04-2019 |
||
Press Release
- GDDS Charges by K-Electric |
||
30-04-2019 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of March 2019
for XWDISCOs along with Notification Thereof |
|
24-04-2019 |
||
Notice of Admission
- Application of Sindh Transmission & Dispatch
Company (Pvt.) Limited for Grant of Transmission
Licence for Provincial Grid Company |
||
Application of
Sindh Transmission & Dispatch Company (Pvt.)
Limited for Grant of Transmission Licence for
Provincial Grid Company |
||
21-04-2019 |
Corrigendum - Notice - Licensee Proposed Modification (LPM)
in the Generation License of Iran Pak Wind Power
(Private) Limited |
|
19-04-2019 |
||
Notice -
Licensee Proposed Modification (LPM) in the
Generation License of Iran-Pak Wind Power
(Private) Limited |
||
Application for
Licensee Proposed Modification (LPM) in the
Generation License of Iran Pak Wind Power
(Private) Limited |
||
19-04-2019 |
Notice of Admission -
Tariff Petition filed by Gul Ahmed Energy Limited
for Approval of Generation Tariff for RFO based
Power Plant of 136.17 MW (Gross) at Karachi |
|
Tariff Petition
filed by Gul Ahmed Energy Limited for
Approval of Generation Tariff for RFO based Power
Plant of 136.17 MW (Gross) at Karachi |
||
18-04-2019 |
Hearing
regarding Fuel Charges Adjustment for the
Month of March 2019 for EX-WAPDA Distribution
Companies |
|
CPPAGL Revised
Energy Purchase Data for the Month of March
2019 |
||
16-04-2019 |
Notice of
Proceedings - Revision in Fuel Price
Adjustment Mechanism for Coal Power Plants |
|
12-04-2019 |
Notice -
Licensee Proposed Modification in the Generation
Licence of Indus Wind Energy Limited |
|
Application for Modification in the
Generation Licence of Indus Wind Energy Limited |
||
10-04-2019 |
Addendum to Notice
of Admission - Pertaining to Application of
Moro Power Company (Private) Limited for grant
of Generation Licence |
|
09-04-2019 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of February 2019
for XWDISCOs along with Notification Thereof |
|
06-04-2019 |
Notice of Admission
- Application of Atlas Energy Limited for the
Grant of Generation Licence |
|
Application of
Atlas Energy Ltd. for grant of Generation
License in respect of 10 MW Solar Power Projects at
various sites |
||
03-04-2019 |
PRESS RELEASE - NEPRA Seeks DISCOs Plan for
Reliable Power Supply to Consumers |
|
27-03-2019 |
Rescheduling of
Hearing - Fuel Charges Adjustment for the Month
of February 2019 for EX-WAPDA Distribution
Companies |
|
23-03-2019 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of
Zulaikha
Energy (Private) Limited |
|
Application of Zulaikha
Energy (Private) Limited
for Modification of a Generation |
||
23-03-2019 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of
Premier
Industrial Chemical Manufacturing Company (Private)
Limited |
|
Application of Premier
Industrial Chemical Manufacturing Company (Private)
Limited for
Modification of a Generation |
||
23-03-2019 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of
Noor Solar
Energy (Private) Limited |
|
Application of Noor Solar
Energy (Private) Limited
for Modification of a Generation |
||
16-03-2019 |
Notice of Admission
- Tariff Petition filed by Tapal Energy (Private)
Limited for Approval of Generation Tariff for
RFO based Power Plant of 126 MW (Gross) at Karachi |
|
Tariff Petition
filed by Tapal Energy (Private) Limited for
Approval of Generation Tariff for RFO based Power
Plant of 126 MW (Gross) at Karachi |
||
16-03-2019 |
Hearing
regarding fuel charges adjustment for the
month of February 2019 for EX-WAPDA
Distribution Companies |
|
CPPAG
Energy Purchase Data for the Month of February 2019 |
||
15-03-2019 |
Notification - S.R.O.
374 (I)/ 2019 - Forms (Form 1-15) for
steam turbine based power plants operating on Coal,
Residual Furnace Oil (RFO), Gas, Biomass, Bagasse,
Solid Waste and Nuclear Fuel. |
|
12-03-2019 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Sanjwal Solar Power
(Private) Limited |
|
Application for
Licensee Proposed Modification (LPM) in the
Generation Licence of Sanjwal Solar Power
(Private) Limited |
||
09-03-2019 |
Notice of Admission
- Proceedings in the matter of Excessive Profits
of RFO based Independent Power Producers
Established under Power Policy for Generation 2002 |
|
09-03-2019 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Norinco International
Thatta Power (Private) Limited |
|
Application for Licensee Proposed Modification (LPM) in the
Generation Licence of Norinco International
Thatta Power (Private) Limited |
||
07-03-2019 |
Notice of Admission / Hearing-
Tariff Petition filed by Enertech Bostan Solar (Pvt.) Limited for the
Determination of Generation Tariff in respect of 50 MWp Solar Power Project |
|
Tariff Petition filed by Enertech
Bostan Solar (Pvt.) Limited for the Determination of Generation Tariff
in respect of 50 MWp Solar Power Project |
||
07-03-2019 |
Notice of Admission/
Hearing - Tariff Petition filed by Asia
Energy (Pvt.) Limited for the Determination of
Generation Tariff in Respect of 30 MWp Solar Power
Project |
|
Tariff Petition
filed by Asia Energy (Pvt.) Limited for the
Determination of Generation Tariff in Respect of 30
MWp Solar Power Project |
||
07-03-2019 |
Notice of Admission / Hearing -
Tariff Petition filed by Enertech Quetta Solar (Pvt.) Limited for the
Determination of Generation Tariff in respect of 50 MWp Solar Power Project |
|
Tariff Petition filed by Enertech
Quetta Solar (Pvt.) Limited for the Determination of Generation Tariff
in respect of 50 MWp Solar Power Projec |
||
05-03-2019 |
Notice of Admission -
Application of Siddiqsons
Kohat Solar Limited for
the Grant of Generation Licence |
|
Application of
Siddiqsons Kohat Solar Limited for the Grant of
Generation Licence |
||
05-03-2019 |
Notice of Admission - Application of
Siddiqsons Nowshera Solar Limited for the Grant of Generation Licence |
|
Application of Siddiqsons Nowshera Solar
Limited for the Grant of Generation Licence |
||
03-03-2019 |
Walk in Interview
for the Post of Security Guard and Naib Qasid |
|
02-03-2019 |
Notice of Hearing -
Hearing regarding Quarterly Adjustments of XWDISCOs on account
of variation in Power Purchase Price (PPP) for the Quarters July to
September 2018 and October to December 2018 |
|
Applications of 1st Quarter (Jul
to Sep 2018) Adjustment of Power
Purchase Price for the FY 2018-19 of XWDISCOs |
||
Applications of 2nd Quarter (Oct
to Dec 2018) Adjustment of Power
Purchase Price for the FY 2018-19 of XWDISCOs |
||
27-02-2019 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of January 2019 for
XWDISCOs along with Notification Thereof |
|
21-02-2019 |
Notice
Licensee Proposed Modification (LPM) in the Generation Licence of Gul Ahmed Energy Limited |
|
Licensee Proposed
Modification (LPM) in respect of the Generation Licence No. IPGL/09/2003
of Gul Ahmed Energy Limited |
||
20-02-2019 |
Determination of the
National Electric Power Regulatory Authority in the
matter of Tariff Petition filed by Burj Wind
Energy (Pvt.) Limited for Determination of
Reference Generation Tariff in respect of 13.80 MW
Wind Power Project |
|
19-02-2019 |
Motion for Leave for
Review of Determining sale rate for Import of Power from Neelum Jhelum
Hydropower Project |
|
15-02-2019 |
Hearing regarding
Fuel Charges Adjustment for the Month of January 2019 for EX-WAPDA
Distribution Companies |
|
CPPAG
Energy Purchase data for the Month of January 2019 |
||
14-02-2019 |
Notice for seeking
comments in the matter of Authority Proposed Modification (APM) in
the generation licence of Saif Power Limited (SPL) |
|
14-02-2019 |
Notice For seeking
comments in the matter of Authority Proposed Modification (APM) in
the generation licence of Orient Power Company (Pvt.) Limited (OPCPL) |
|
07-02-2019 |
Notice for seeking Comments in the
matter of Authority Proposed Modification (APM) in the Generation Licence of
Halmore Power Generation Company (Pvt.) Limited (HPGCPL) |
|
04-02-2019 |
Decision of the Authority in the matter of
Fuel Charges Adjustment for the Month of December 2018 for XWDISCOs
along with Notification Thereof |
|
04-02-2019 |
K-Electric application for Review
regarding the decision of the Authority in the Matter of request filed by KE
for Approval to Utilize RLNG as an Alternate Fuel for its Generation Plants |
|
01-02-2019 |
CIHC Pak Power Company Limited
submission of Motion for Leave for Review of 300 MW Coal Fired Power Project
at Gwadar (Project) |
|
31-01-2019 |
Notice of Admission - Application of
Power Station (Private) Limited for Grant of Generation Licence |
|
Application of Power Station (Private)
Limited for Grant of Generation Licence |
||
29-01-2019 |
Notice of Admission - Application of
Asia Energy (Private) Limited for grant of Generation Licence |
|
Application for Generation Licence of
Asia Energy (Private) Limited |
||
24-01-2019 |
Re-Scheduling of Public Hearings in the
matter of Applications of Vision Developers (Private) Limited and
Lake City Management (Private) Limited for grant of Licence(s) for
Generation and Distribution/Supplier of Electric Power |
|
20-01-2019 |
Notice of Admission/ Hearing - Tariff
Petition filed by Dhadar Hydropower (Private) Limited |
|
Tariff Petition filed by Dhadar
Hydropower (Private) Limited |
||
Issues of Hearing -
Dhadar Hydropower (Private) Limited |
||
17-01-2019 |
Performance Evaluation Report 2016-17
Based on Reported Data of National Transmission & Despatch Company (NTDC)
With a comparison to 2011-12 through 2015-16 As per Performance Standards
(Transmission) Rules 2005 |
|
17-01-2019 |
Performance Evaluation Report 2016-17
Based on Reported Data of K-Electric (KE) With a comparison to
2011-12 through 2015-16 As per Performance Standards (Transmission) Rules
2005 |
|
16-01-2019 |
Addendum to Notice of Admission
Pertaining to application of Package Power (Private) Limited for
Grant of Generation Licence |
|
16-01-2019 |
Hearing regarding Fuel
Charges Adjustment for the Month of December 2018 for Ex-WAPDA Distribution
Companies |
|
CPPAG Energy Purchase
Data for the Month of December, 2018 |
||
16-01-2019 |
Notice of Admission/ Hearing
- Tariff Petition filed by Shafi Energy (Pvt.) Limited for the
Determination of Reference Generation Tariff in respect of 50 MW Wind Power
Project |
|
Tariff Petition filed by Shafi Energy (Pvt.) Limited for the
Determination of Reference Generation Tariff in respect of 50 MW Wind Power
Project |
||
16-01-2019 |
Notice of Admission/ Hearing
- Tariff Petition filed by Sino Well (Pvt.) Limited for the
Determination of Reference Generation Tariff in respect of 50 MW Wind Power
Project |
|
Tariff Petition filed by Sino Well (Pvt.) Limited for the
Determination of Reference Generation Tariff in respect of 50 MW Wind Power
Project |
||
16-01-2019 |
Notice of Admission/ Hearing
- Tariff Petition filed by Javed Solar Park (Pvt.) Limited for
the Determination of Reference Generation Tariff in respect of 49.5 MWp
Solar Power Project |
|
Tariff Petition filed by Javed Solar Park (Pvt.) Limited for
the Determination of Reference Generation Tariff in respect of 49.5 MWp
Solar Power Project |
||
12-01-2019 |
Notice of Admission/ Hearing
Petition filed by Quaid-e-Azam Thermal Power (Pvt.) Ltd. (QATPL) for
Modification of Tariff dated April 14, 2016 of RLNG based power plant at
Bhikki, Shekihupura, Punjab |
|
Petition filed by
Quaid-e-Azam Thermal Power (Pvt.) Ltd. (QATPL) for Modification of
Tariff dated April 14, 2016 of RLNG based power plant at Bhikki, Shekihupura,
Punjab |
||
10-01-2019 |
Notice of Public Hearing
in the matter of Application of Vision Developers (Private) Limited
for the Grant of Licence(s) for Generation and Distribution/ Supplier of
Electric Power |
|
Issues Of Public Hearing
in the Matter of Grant of Licence(s) for Generation and
Distribution/Supplier of Electric Power to Vision Developers (Private)
Limited |
||
10-01-2019 |
Notice of Public Hearing
in the matter of Application of Lake City Management (Private) Limited
for the Grant of Licence(s) for Generation and Distribution/ Supplier of
Electric Power |
|
Issues Of Public Hearing
in the Matter of Grant of Licence(s) for Generation and
Distribution/Supplier of Electric Power to Lake City Management (Private)
Limited |
||
04-01-2019 |
Press Release -
NEPRA Takes Notice on Un-scheduled Load Shedding |
|
02-01-2019 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of November 2018 for
XWDISCOs along with Notification Thereof |
|
02-01-2019 |
Tariff
Notification of Ex-WAPDA DISCOs |
22-12-2018 |
Notice of Admission
- Application of The Packages Limited for
Grant of Generation Licence |
|
Generation
licence application of The Packages Limited |
||
19-12-2018 |
Decision of the Authority in the matter of Motion
filed by the Federal Government under Section 7,
31(4) and 31(7) of NEPRA Act, 1997 read with Rule 17
of the NEPRA (Tariff Standards and Procedure) Rules,
1998 with respect to Recommendation of the
Consumer-end Tariff |
|
18-12-2018 |
Hearing: Regarding
Fuel
Charges Adjustment for the month of November 2018
for Ex-Wapda Distribution Companies |
|
CPPAGL Energy
Purchase Data for the Month for November 2018 |
||
14-12-2018 |
Notice: Licensee Proposed Modification (LPM)
in the Generation License of Tapal Energy (Pvt)
Ltd |
|
Application for
Licensee Proposed Modification of Generation License
of Tapal Energy (Pvt)
Ltd |
||
12-12-2018 |
Notice of Admission
- Application of Grid Edge (Private) Limited
for Grant of Generation Licence for Solar Power
Plant at Lahore |
|
Application of Grid
Edge (Private) Limited for Grant of Generation
Licence for Solar Power Plant at Lahore |
||
12-12-2018 |
Notice of Admission
- Application of Sino Well (Private) Limited
for Grant of Generation Licence |
|
Application of Sino
Well (Private) Limited for Grant of Generation
Licence |
||
12-12-2018 |
Notice of Admission
- Application of Shafi Energy (Private) Limited
for Grant of Generation Licence |
|
Application of Shafi
Energy (Private) Limited for Grant of Generation
Licence |
||
12-12-2018 |
Notice of Admission
- Application of Javed Solar Park (Private)
Limited for the Grant of Generation Licence |
|
Application of Javed
Solar Park (Private) Limited for the Grant of
Generation Licence |
||
12-12-2018 |
Notice of Admission
- Application of Grid Edge (Private) Limited
for Grant of Generation Licence for Solar Power
Plant at Karachi |
|
Application of Grid
Edge (Private) Limited for Grant of Generation
Licence for Solar Power Plant at Karachi |
||
10-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of K-Electric Limited (KEL) |
|
10-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Hyderabad Electric Supply Company (HESCO) |
|
10-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Quetta Electric Supply Company (QESCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Tribla Area Electric Supply Company
(TESCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Sukkur Electric Power Company (SEPCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Peshawar Electric Supply Company (PESCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Multan Electric Power Company (MEPCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Lahore Electric Supply Company (LESCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Islamabad Electric Supply Company (IESCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Gujranwala Electric Power Company (GEPCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Faisalabad Electric Supply Company (FESCO) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Defence Housing Authority Lahore
Phase-XII (EME Sector-DHAEME) |
|
09-12-2018 |
Notice to Submit
Comments in the Matter of Authority Proposed
Modification in the Existing Distribution
Licence of Bahria Town (Private) Limited (BTPL) |
|
28-11-2018 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Finergy (Private) Limited |
|
Licensee Proposed
Modification application for 49.95 MW Finergy
(Private) Limited |
||
22-11-2018 |
Consultative Session -
Determination of Rate of Return November 22, 2018
(Presentation) |
|
13-11-2018 |
Press Release -
NEPRA took Serious Notice of Power Breakdown in
Karachi on 12-11-2018 |
|
13-11-2018 |
Notice of Admission/ Hearing - in respect of
motion for Determination of Consumer-end Tariff
filed by the Federal Government under section 7,
31(4) and 31(7) of NEPRA Act 1997 read with rule 17
of the NEPRA Tariff (Standards and Procedure) Rules,
1998F |
|
Federal Government
Motion with respect of Recommendation of
Consumer-end Tariff vide Tariff Determination for FY
2016-17 and Quarterly Decision for FY 2017-18
(including Review Decision (if any) for XWDISCOS
under section 7 & 31(4) and 31(7) of Regulation,
Generation, Transmission and Distribution of
Electric Power Act, 1997 (The Act) read with Rule 17
of the NEPRA Tariff (Standards and Procedures) Rules
1998 |
||
10-11-2018 |
Rescheduling of
Consultative Session - Determination of Rate of
Return for Power Sector |
|
10-11-2018 |
Hearing regarding Fuel Charges Adjustment
for the Month of October 2018 for Ex-WAPDA
Distribution Companies |
|
CPPAGL Energy
Purchase Data for the Month for October 2018 |
||
10-11-2018 |
Notice of Hearing
- Withdrawal of Upfront Tariff for existing
Sugar Mills |
|
31-10-2018 |
Notice of Admission/ Hearing - Petition filed
by National Transmission & Despatch Company
Limited (NTDCL) for Determination of its Power
Transfer/ Wheeling Charges for the FYs 2017-18 and
2018-19 |
|
Tariff Petition
filed by National Transmission & Despatch Company
Limited (NTDCL) for Determination of its Power
Transfer/ Wheeling Charges for the FYs 2017-18 and
2018-19 |
||
Issues framed
for Hearing to be held on 28-01-2018 with respect to
the Petition filed by National Transmission &
Despatch Company Limited (NTDCL) for Determination
of its Power Transfer/ Wheeling Charges for the FYs
2017-18 and 2018-19 |
||
31-10-2018 |
Press Release - NEPRA Imposes Fine on KE |
|
28-10-2018 |
Public Notice for
Consultative Session - Determination of Rate
of Return for Power Sector |
|
27-10-2018 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Jamshoro Power Company
Limited (JPCL) |
|
JPCL Application
for Modification in Generation Licence (GL/01/2002
on account of addition of RLNG as Secondary/
Alternative Fuel |
||
22-10-2018 |
Press Release - NEPRA Imposes Fine on IESCO |
|
18-10-2018 |
Notice of Admission/Hearing: Tariff Petition
filed by Finergy (Pvt) Ltd for the
Determination of reference Generation Tariff i.r.o
49.8 MW Wind Power Project |
|
Tariff Petition filed by Finergy (Pvt) Ltd |
||
Notice of
Admission/Hearing: Tariff Petition filed
by Kulachi Solar Power (Pvt) Ltd for the
Determination of reference Generation Tariff i.r.o
50 MWp Solar Power Project |
||
Tariff Petition filed by Kulachi Solar Power (Pvt)
Ltd |
||
Notice of
Admission/Hearing: Tariff Petition filed
by FAS Energy Pakistan (SMC-Pvt) Ltd for the
Determination of reference Generation Tariff i.r.o
50 MWp Solar Power Project |
||
Tariff Petition filed by FAS Energy Pakistan
(SMC-Pvt) Ltd |
||
17-10-2018 |
Hearing regarding Fuel Charges Adjustment for
the Month of September 2018 for EX-WAPDA
Distribution Companies. |
|
CPPAG
Energy Purchase Data for the month of
September 2018 |
||
05-10-2018 |
Do you have any complaint against QUETTA
Electric Supply Company (QESCO) |
|
05-10-2018 |
Press Release -
NEPRA took serious notice of Power Breakdown in Karachi on 02-10-2018 |
|
28-09-2018 |
Notice of Admission - Application of Moro
Power Company (Private) Limited for Grant of Generation Licence |
|
Application for Generation
License of Moro Power Company for 25MW Wind Power Plant۔ |
||
27-09-2018 |
Press Release - NEPRA
Imposes Rs. 5 Million fine on K-Electric Limited |
|
18-09-2018 |
Hearing regarding Fuel Charges Adjustment for
the Month of August 2018 for EX-WAPDA
Distribution Companies. |
|
CPPAG
Energy Purchase Data for the month of August 2018 |
||
17-09-2018 |
Press Release - NEPRA
initiates legal proceedings against KEL on Safety Accident of 8 years
boy |
|
14-09-2018 |
Amendments
to the National Electric Power Regulatory Authority (Alternative & Renewable
Energy) Distributed Generation and Net Metering Regulations, 2015, notified
vide S.R.O. 1135(1)2018 |
|
08-09-2018 |
Notice of Admission - Application of
FAS Energy Pakistan (Private) Limited for grant of Generation Licence |
|
Application for a Generation
License of FAS Energy Pakistan for 50MWp Solar Power Plant
located at Kulachi, District Dera Ismail Khan, Province of Khyber
Pakhtunkhwa |
||
04-09-2018 |
Notice of Admission - Aujla &
Associates Town Developers (Private) Limited (ATDPL) for Grant of
Distribution Licence |
|
Application for Grant of a
Distribution Licence for 25.00 MW Aujla & Associates Town Developers
(Private) Limited for its Royal Palm Citv Housing Scheme Gujranwala |
||
04-09-2018 |
Notice of Hearing - Hearing regarding
periodic adjustments on Account of Power Purchase Price (PPP) in the
Consumer end Tariff of GEPCO, MEPCO, PESCO, HESCO, SEPCO and QESCO
Pertaining to the FY 2017-18 |
|
GEPCO
Resubmission of Power Purchase Price Quarterly Adjustments Application for
the Financial Year 2017-18 |
||
HESCO
Application for quarterly Adjustments for 1st, 2nd 3rd and 4th Quarters of
FY 2017-18 |
||
MEPCO request
for quarterly adjustment of Power Purchase Price in respect of MEPCO for the
FY 2017-18 |
||
PESCO application
for quarterly adjustments for 1st, 2nd 3rd and 4th Quarters of FY 2017-18 |
||
SEPCO request
for quarterly adjustment of Power Purchase Price in respect of SEPCO for the
4th Quarter of FY 2017-18 |
||
SEPCO request for quarterly adjustment of Power Purchase Price in respect
of SEPCO for the period Jan-2018 to Mar 2018 |
||
SEPCO Re-submission of quarterly
adjustment of Power Purchase Price in respect of SEPCO for FY 2017-18 |
||
QESCO application for 3rd Quarterly Adjustment for the FY 2017-18 |
||
31-08-2018 |
Notice of Admission - Application of
Master Hydro (Private) Limited for grant of Generation Licence |
|
Application of Master Hydro (Private) Limited
for grant of Generation Licence |
||
31-08-2018 |
Notice of Admission - Application of
Kulachi Solar Power (Private) Limited for grant of Generation Licence |
|
Application of Kulachi Solar Power (Private)
Limited for grant of Generation Licence |
||
31-08-2018 |
Notice of Admission - Application of
Matol (Private) Limited for grant of Generation Licence |
|
Application of Matol (Private) Limited for
grant of Generation Licence |
||
25-08-2018 |
Notice Licence proposed Modification (LPM)
in the Generation Licence of ICI Pakistan Limited (ICIPL) |
|
Application for Modification in ICI
Pakistan Limited Generation License — 15 MW Coal based Thermal Power
Plant |
||
18-08-2018 |
Hearing regarding Fuel Charges Adjustment for
the month of July 2018 for Ex-WAPDA Distribution Companies. |
|
CPPAG
Energy Purchase Data for the month of July 2018 |
||
18-08-2018 |
Notice of Admission - Application of
Vision Developers (Private) Limited (VDPL) for the Grant of Distribution
Licence |
|
Application of Vision Developers (Private)
Limited (VDPL) for the Grant of Distribution Licence |
||
18-08-2018 |
Notice of Admission - Application of
Vision Developers (Private) Limited (VDPL) for the Grant of Generation
Licence |
|
Application of Vision Developers (Private)
Limited (VDPL) for the Grant of Generation Licence |
||
15-08-2018 |
Notice
- Licensee Proposed Modification (LPM) in the Generation Licence of China
Power Hub Generation Company (Private) Limited (CPHGC) |
|
Application
for
Licensee Proposed Modification (LPM) in the Generation Licence of
China Power Hub Generation Company (Private) Limited (CPHGC) |
||
11-08-2018 |
Notice of admission
-
Application of
Packages Power (Private) Limited For grant of generation
licence |
|
Application of Packages Power
(Private) Limited For grant of generation
licence |
||
09-08-2018 |
Grant of Generation Licence No. IGSPL/103/2018 -
Licence Application No. LAG-425 - Lahore Xingzhong Renewable Energy
Company (Private) Limited (LXZRECPL) |
|
09-08-2018 |
NEPRA
imposes fine of rupees five million on GENCO-II for power breakdowns |
|
08-08-2018 |
Re-scheduling of Hearings - Re-scheduling of hearing regarding Periodical
Adjustments on account of Power Purchase Price (PPP), indexation of
Distribution Margin and Prior Period Adjustments pertaining to the FY
2016-17 & FY 2017-18 in the Consumer end Tariff of IESCO, FESCO & LESCO |
|
08-08-2018 |
Notice of Admission/ Hearing
- Request of K-Electric for Approval to utilize RLNG as Alternate
Fuel for its existing Power Plants |
|
02-08-2018 |
Notice Licensee
Purposed Modification (LPM) in the Generation Licence of FIMCOTEX
Industries (Private) Limited (FIPL) |
|
M/s Fimcotex Industries (Pvt.) Limited
(Company) Proposed Modification of the General Licence |
||
24-07-2018 |
Notice of Admission/
Hearing - Tariff Petition filed by Burj Wind
Energy (Pvt.) Limited for the Determination of
Reference Generation Tariff in respect of 13.80 MW
Wind Power Project |
|
Tariff Petition
filed by Burj Wind
Energy (Pvt.) Limited for the Determination of
Reference Generation Tariff in respect of 13.80 MW
Wind Power Project |
||
20-07-2018 |
Amendment in the
National Electric Power Regulatory Authority (Alternative & Renewable
Energy) Distributed Generation and Net Metering Regulations, 2015 for
eliciting public opinion within 30 days |
|
Consultative Sessions held by NEPRA on 24-04-2018 regarding Procurement
of Energy through Distributed Generation |
||
20-07-2018 |
Notice of Hearing
-
Hearing Regarding Periodical Adjustment in the
Consumer End Tariff of IESCO, FESCO and
LESCO Pertaining to the FY 2016-17 and 2017-18 |
|
IESCO
request for adjustment of Tariff components for FY
2016-17 and 2017-18 under Multi Year Tariff Regime |
||
FESCO
request for adjustment of Tariff components for FY
2016-17 and 2017-18 under Multi Year Tariff Regime |
||
LESCO
application for adjustment of 1st and 2nd quarter
for FY 2017-18 |
||
19-07-2018 |
Notice of Admission - Application of
U.S Apparel and Textiles (Private) Limited for grant of Generation
Licence |
|
Generation Licence Application of U.S Apparel
and Textiles (Private) Limited |
||
18-07-2018 |
Decision of the
Authority in the matter of Suo Moto Review
Proceedings regarding Adjustment of Tariff of
Renewable Energy Power Projects availing
State Bank of Pakistan Revised Financing Scheme |
|
18-07-2018 |
Hearing regarding Fuel Charges Adjustment for
the Month of June 2018 for Ex-WAPDA Distribution
Companies |
|
CPPAG Energy
Purchase data for the month of June 2018 |
||
17-07-2018 |
Decision of the
Authority in the matter of Motions for Leave for
Review filed against Decision of the Authority
in the matter of Induction of Security Cost for
CPEC Projects in the Power Tariff to Ensure
Security Sustainability |
|
16-07-2018 |
Press Release - NEPRA
Grants Generation Licence to Pakistan First Waste to Energy
Project |
|
13-07-2018 |
Corrigendum to
Public Hearing Notice - All stakeholders and
the general public are hereby informed that, the
CPPA-G has proposed amendment(s) to the
Commercial Code |
|
07-07-2018 |
Notice of Admission Generation License
Application for the Grant of Generation License of Enertech Quetta Solar
(Private) Limited |
|
Generation License Application for the Grant of
Generation License of Enertech Quetta Solar (Private) Limited |
||
07-07-2018 |
Notice of Admission Generation License
Application for the Grant of Generation License of
Enertech Bostan Solar (Private) Limited |
|
Generation License Application for the Grant of
Generation License of Enertech Bostan Solar
(Private) Limited |
||
05-07-2018 |
Public Hearing Notice - All stakeholders and
the general public are hereby informed that, the
CPPA-G has proposed amendment(s) to the
Commercial Code |
|
05-07-2018 |
Decision of the
Authority in the matter of Reconsideration Request
filed by the Federal Government regarding
Multi-Year Tariff (MYT) Petition of K-Electric
Ltd. for the period commencing from July 1, 2016
to June 30, 2023 |
|
04-07-2018 |
Notice of Admission/Hearing - Power Acquisition Request by K-Electric
for Purchase of upto 4 MW Power from International Industries Limited |
|
Power Acquisition Request
("PAR") between K-Electric Limited ("K-Electric") and
International Industries Limited ("IIL") |
||
04-07-2018 |
Notice Licensee Proposed Modification (LPM)
in the Generation License of K-Electric Limitd (KEL) |
|
Application of K-Electric for
MODIFICATION OF GENERATION LICENCE [GL/04/2002] |
||
30-06-2018 |
Notice of Admission/ Hearing - Petition filed
by Tribal Area Electric Supply Company (TESCO)
for Determination of its Consumer-End Tariff
Pertaining to the FY 2017-18 |
|
Tariff Petition for FY 2017-18 - Tribal Area
Electric Supply Company (TESCO) |
||
Framing of Issues
in the matter of Petition filed by Tribal Area Electric Supply Company (TESCO)
for Determination of its Consumer-End Tariff
Pertaining to the FY 2017-18 |
||
22-06-2018 |
Hearing regarding Fuel
Charges Adjustment for the Month of May 2018 for Ex-WAPDA Distribution
Companies |
|
CPPAG Energy Purchase data for the month
of May, 2018 |
||
21-06-2018 |
NEPRA imposes fine of Rupees Five Million on
GENCO-III for Power Breakdowns |
|
20-06-2018 |
Notice of Admission/
Hearing - Approval rates for Import of electric power 969 MW by (CPPA-G)
from Neelum Jhelum Hydropower Power Project situated in AJK under
NEPRA Import of Power Regulations, 2017 |
|
Tariff Petition of Neelum Jhelum Hydropower Power Project |
||
Issues
framed for hearing Neelum Jhelum
Hydropower Power Project |
||
20-06-2018 |
Amendments in
the National Electric Power Regulatory Authority
Competitive Bidding Tariff (Approval Procedure)
Regulations, 2017 |
|
20-06-2018 |
Notice of Admission -
Application of Lahore Xingzhong Renewable Energy Company (Private)
Limited for the grant of Generation Licence |
|
Generation Licence Application
of Lahore Xingzhong Renewable Energy Company (Private) Limited for
the grant of Generation Licence |
||
19-06-2018 |
National Electric Power Regulatory Authority
(Benchmarks for Tariff Determination) Guidelines, 2018. |
|
14-06-2018 |
Notice of Admission - Application of
BURJ Energy (Private) Limited for the
Grant of Generation Licence |
|
Application of BURJ Energy (Private)
Limited for the Grant of Generation
Licence |
||
14-06-2018 |
Notice of Admission/ Hearing Tariff
Petition Filed by Trance Atlantic Energy
(Pvt.) Limited for the Determination of
Reference Generation Tariff in Respect of
48.3MW Wind Power Project |
|
Tariff Petition of Trance Atlantic Energy
(Pvt.) Limited for the Determination of
Reference Generation Tariff in Respect of
48.3MW Wind Power Project |
||
08-06-2018 |
Press
Release - Nepra takes
Notice Of Increased Load shedding in
Islamabad, Lahore and Peshawar |
|
07-06-2018 |
Notice of Admission/Hearing -
Application Filed by Lotte Chemical
Pakistan Limited for change in Fuel from
Natural Gas to RLNG |
|
Request for Fuel Change Lotte Chemical
Pakistan Limited |
||
02-06-2018 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence
of Tapal Energy (Private) Limited |
|
Tapal Energy (Private) Limited -
Licensee Proposed Modification (LPM) in
the Generation Licence |
||
30-05-2018 |
Notice of Admission / Hearing - Approval of
rates for Import of Electric Power of 640 MW
by (CPPA-G) from Mahl Hydropower Project
situated in AJK under NEPRA import of Power
Regulation, 2017 |
|
Feasibility
Stage Tariff Proposal of 640 MW Mahl
Hydropower Project |
||
List of Issues
for Hearing |
||
30-05-2018 |
Notice of Admission / Hearing -
Tariff Proposal submitted by CPPA(G) in
respect of 30.4 MW Jagran-I small
Hydro Power Project in AJ&K |
|
Petition
submitted by CPPA(G) in respect of 30.4 MW
Jagran-I
small Hydro Power Project in AJ&K |
||
Issued
framed for Jagran-I
Hydro Power Project in AJ&K |
||
30-05-2018 |
Notice of Admission / Hearing -
Tariff Proposal submitted by CPPA(G) in
respect of 7.08 MW Riali-II Hydro
Power Project in AJ&K |
|
Petition
submitted by CPPA(G) in respect of
7.08 MW Riali-II Hydro Power Project in AJ&K |
||
Issued framed for
Riali-II Hydro Power Project |
||
Additional
information for
cost-plus tariff submitted by project
sponsors regarding tariff proposal of
CPPA for Riali-II hydropower project. |
||
30-05-2018 |
Notice of Admission / Hearing -
Tariff Proposal submitted by CPPA(G) in
respect of Kathai-II, 8 MW Hydro
Power Project in AJ&K |
|
Petition
submitted by CPPA(G) in respect of
Kathai-II Hydro Power Project |
||
Issued
framed for
Kathai-II Hydro Power Project |
||
Additional
information for
cost-plus tariff submitted by project
sponsors regarding tariff proposal of
CPPA for Kathai-II hydropower project |
||
21-05-2018 |
Determination
of the Authority in the matter of Cost Plus
Tariff Petition of 2 MW Birmogh Golen
Hydro Power Project, District Chitral,
Khyber Pakhtunkhwa |
|
18-05-2018 |
Hearing
regarding fuel charges adjustment for the
month of April 2018 for EX-WAPDA
Distribution Companies |
|
CPPAGL Energy Purchase Data for the
Month of April 2018 |
||
17-05-2018 |
Press Release
-
NEPRA takes serious notice of wide spread
power breakdown occurred on 16.05.2018 |
|
17-05-2018 |
Determination
of the Authority in the matter of Tariff
Proposal submitted by Central Power
Purchasing Agency (Guarantee) Ltd. (CPPA-G)
for Import of Electric Power from 700.7 MW
Azad Pattan Hydropower Project
located in AJK |
|
14-05-2018 |
Determination
of the Authority in the matter of the
Authority Proposed Modification in the
Generation Licence of Northern Power
Generation Company Limited (NPGCL) regarding
its Gas Turbine Power Station, Faisalabad. |
|
10-05-2018 |
Determination
of the Authority in the matter of the
Authority Proposed Modification in the
Generation Licence of Northern Power
Generation Company Limited (NPGCL) regarding
its Steam Power Station, Faisalabad. |
|
01-05-2018 |
Notice of
Admission/ Hearing -
Tariff Petition filed by Tricom Wind
Power (Pvt.) Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
|
Tariff
Petition of Tricom Wind Power
Private Limited for 50 MW Wind Power
Project (TWP) at Jhimpir Area, Thatta, Sindh |
||
26-04-2018 |
Notice -
Licensee Proposed Modification (LPM)
in the Generation Licence of K-Electric
Limited (KEL) |
|
Application
of K-Electric Limited Modification of
Generation Licence [GL/04/2002] |
||
20-04-2018 |
Notice of
Admission - Application of Bulleh Shah Packaging (Pvt) Limited for Grant of
Generation Licence |
|
Application
of Bulleh Shah Packaging (Pvt) Limited for Grant of
Generation Licence |
||
20-04-2018 |
Notice -
Licensee Proposed Modification (LPM)
in the Generation Licence of Northern
Power Generation Company Limited (NPGCL) |
|
Application
for Licensee Proposed Modification from
Northern Power Generation Company Limited
GENCO-III |
||
20-04-2018 |
Notice of
Admission - Application of NARA
Hydro Power (Pvt) Limited for Grant of
Generation Licence |
|
Application of NARA
Hydro Power (Pvt) Limited for Grant of
Generation Licence |
||
18-04-2018 |
Decision
of National Electric Power Regulatory
Authority in the matter of Review Motions
filed by Central Power Purchasing Agency
Guarantee Ltd. against the Award of
Upfront Tariff, 2013 to Twelve Bagasse
Cogeneration Projects |
|
18-04-2018 |
Notice of
Hearing - Regarding Fuel Charges
Adjustment for the month of March 2018
for Ex-Wapda Distribution Companies |
|
CPPAG Energy Purchase data for the Month of
March 2018 |
||
18-04-2018 |
Notice -
Licensee Proposed Modification (LPM)
in the Generation Licence of Premier
Industrial Chemical Manufacturing
Company Private Limited |
|
Application
for the Modification of Generation
Licence No.SGC/124/2018 Dated 23.02.2018
from 7 to 15 MW of Premier Industrial
Chemical Manufacturing Company Private
Limited |
||
17-04-2018 |
Press Release
- NEPRA initiates legal proceedings
against K-Electric |
|
14-04-2018 |
Notice of
Admission - Application of SAIFCO
Hydro Power Limited for Grant of
Generation Licence |
|
Application of
SAIFCO Hydro Power Limited for Grant of
Generation Licence |
||
11-04-2018 |
Consultative
Session regarding Procurement of
Energy from Distributed Generators by
Distribution Companies through Net-Metering |
|
Letter of
Ministry of Energy (Power Division)
regarding Procurement of Energy from
Distributed Generator by DISCOs through
Net-Metering |
||
11-04-2018 |
Notice of
Hearing - In the matter of Tariff
Petition Field by CIHC PAK Power Company
Ltd for Approval of Generation Tariff
for 300 MW (Gross) Coal-Fired Power Plant at
Gwadar, Balochistan |
|
10-04-2018 |
Press Release
- NEPRA Team to Investigate
Unscheduled Load Shedding in Karachi |
|
10-04-2018 |
Notice
Regarding : Licence Proposed Modification
in the Distribution Licence of Kohinoor
Mills Limited |
|
Application
for Modification in the
Distribution Licence of
Kohinoor Mills Limited |
||
10-04-2018 |
Notice of
Hearing - In the matter of
Modification in the Existing Mechanism of
Fuel Cost Component of JPCL and
NPGCL on Account of Utilization of
Re-Gasified Liquefied Natural Gas (RLNG) |
|
Application for Modification in the
Existing Mechanism of Fuel Cost Component on
account of Re-Gasified Liquefied Natural Gas
(RLNG) JPCL |
||
Application for Modification in the
Existing Mechanism of Fuel Cost Component on
account of Re-Gasified Liquified Natural Gas
(RLNG) NPGCL |
||
02-04-2018 |
Notification
of DISCO's vide SRO. 374 (I)/2018 to SRO
No. 383 (I)/2018 dated 22nd March, 2018 |
|
02-04-2018 |
Determination of the
Authority in the matter of Proposal for Approval of
EPC Stage Tariff of Kohala Hydropower Project
filed by Central Power Purchasing Agency
(Guarantee) Ltd. |
|
28-03-2018 |
Notice of
Admission/ Public Hearing - Petition
filed by Gujranwala Electric Power Company
Limited (GEPCO) for the Determination of
its Consumer-end Tariff Pertaining to the FY
2016-17 and FY 2017-18 |
|
Tariff
Petition filed by Gujranwala Electric Power Company
Limited (GEPCO) for the Determination of
its Consumer-end Tariff Pertaining to the FY
2016-17 and FY 2017-18 |
||
Framing of Issues in the matter of petition
filed by Gujranwala Electric Power
Company Limited (GEPCO) for the
determination of its consumer-end tariff
pertaining to the FY 2016-17 & FY 2017-18. |
||
28-03-2018 |
Notice of
Admission/ Public Hearing - Petition
filed by Central Power Purchasing Agency
(Guarantee) Limited (CPPA-G) for
Determination of its Market Operation Fee
for the FY 2017-18 |
|
Petition
filed by Central Power Purchasing Agency
(Guarantee) Limited (CPPA-G) for
Determination of its Market Operation Fee
for the FY 2017-18 |
||
Framing of Issues in the matter of
petition filed by Central Power
Purchasing Agency Guarantee Limited (CPPA-G)
for determination of Market Operation Fee
for the FY 2017-18. |
||
27-03-2018 |
Notice of
Admission/ Public Hearing -Petition
filed by Peshawar Electric Supply Company
Limited (PESCO) for the Determination of
its Consumer-end Tariff Pertaining to the FY
2016-17 and FY 2017-18 |
|
Tariff
Petition filed by Peshawar Electric
Supply Company Limited (PESCO) for the
Determination of its Consumer-end Tariff
Pertaining to the FY 2016-17 and FY 2017-18 |
||
Framing of
Issues in the matter of petition filed
by Peshawar Electric Supply Company
Limited (PESCO) for the determination of
its consumer-end tariff pertaining to the FY
2016-17 & FY 2017-18. |
||
27-03-2018 |
Notice of
Admission/ Public Hearing - Tariff
Petition filed by Siachen Energy Limited
for the Determination of Reference
Generation Tariff in respect of 100 MWp
Solar Power Project |
|
Tariff
Petition - filed by Siachen Energy Limited
for the Determination of Reference
Generation Tariff in respect of 100 MWp
Solar Power Project |
||
24-03-2018 |
Bidding
Documents - NEPRA Tender No. 01/2018
- Invites Proposals for Conducting Screening
test(s) for the recruitment of Human
Resource.
Anwar Malik,
Director General (Administration) NEPRA Tower, Attaturk
Avenue (East), G-5/1, Islamabad. info@nepra.org.pk |
|
Tender Documents |
||
22-03-2018 |
Notice of
Admission - Application of S2 Hydro
Limited for Grant of Generation Licence |
|
Application of
S2 Hydro Limited for Grant of Generation
Licence |
||
22-03-2018 |
Public
Notice - Regarding entities involved in
Re-sale of Electric Power after obtaining
one point Supply from Host Distribution
Companies (DISCOs) including Self Generation |
|
21-03-2018 |
Decision of the
Authority in the matter of Request filed by
the Federal Government under Section 31(4)
of NEPRA Act, 1997 for Inclusion of
Subsidy/Surcharge in the Schedule of
Tariff of XWDISCOs |
|
21-03-2018 |
Hearing
regarding Fuel Charges Adjustment for the
Month of February 2018 for Ex-WAPDA
Distribution Companies |
|
CPPAG
Energy Purchase data for the Month of
February 2018 |
||
19-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Gul Ahmed
Electric Limited for the Determination
of Reference Generation Tariff in respect of
50 MW Wind Power Project. |
|
Tariff
Petition filed by Gul Ahmed Electric
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Din Energy
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
|
Tariff
Petition filed by Din Energy Limited
for the Determination of Reference
Generation Tariff in respect of 50 MW Wind
Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Nasda Green
Energy (Pvt.) Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
|
Tariff Petition filed by Nasda Green
Energy (Pvt.) Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Metro Wind
Power Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
|
Tariff
Petition filed by Metro Wind Power
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Liberty Wind
Power 2 (Pvt.) Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
|
Tariff
Petition filed by Liberty Wind Power
2 (Pvt.) Limited for the Determination
of Reference Generation Tariff in respect of
50 MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Act2 Wind (Pvt.)
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
|
Tariff Petition
filed by Act2 Wind (Pvt.) Limited for
the Determination of Reference Generation
Tariff in respect of 50 MW Wind Power
Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Shaheen
Renewable Energy 1 (Pvt.) Limited for
the Determination of Reference Generation
Tariff in respect of 50 MW Wind Power
Project. |
|
Tariff
Petition for Negotiated Tariff under
Cost-Plus Regime for Shaheen Renewable
Energy 1 (Pvt.) Limited 51 MW Wind Power
Project at Bholari, District Thatta, Sindh |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Western Energy
(Pvt.) Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
|
Tariff
Petition filed by Western Energy (Pvt.)
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Master Green
Energy Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
|
Tariff
Petition filed by Master Green Energy
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Indus Energy
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
|
Tariff Petition
filed by Indus Energy Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Liberty Wind
Power 1 (Pvt.) Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
|
Tariff Petition
filed by Liberty Wind Power 1 (Pvt.)
Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Artistic Wind
Power (Pvt.) Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
|
Tariff
Petition filed by Artistic Wind Power
(Pvt.) Limited for the Determination of
Reference Generation Tariff in respect of 50
MW Wind Power Project. |
||
17-03-2018 |
Notice of
Admission / Hearing
- Tariff Petition filed by Lakeside
Energy (Pvt.) Limited for the
Determination of Reference Generation Tariff
in respect of 50 MW Wind Power Project. |
|
Tariff
Petition of Lakeside Energy
(Private) Limited for 50 MW Wind Power
Project |
||
10-03-2018 |
Notice of
Admission -
Application of Tricom Wind Power
(Private) Limited for the Grant of
Generation Licence |
|
Application of Tricom Wind Power
(Private) Limited for the Grant of
Generation Licence |
||
09-03-2018 |
Notice of
Hearing in respect of request filed by
the Federal Government under Section 31 of
the NEPRA Act 1997 for inclusion of Subsidy
/ Surcharges in schedule of Tariff of
XWDISCOs |
|
Intimation of
subsidy / surcharge for inclusion in
schedule of tariff for XWDISCOs |
||
Schedule of
GOP Subsidy & Surcharge |
||
08-03-2018 |
Matrix of
Amendments - Notice
for Seeking Comments of Stakeholders in the
Matter of Proposed Amendments in the
Interconnection for Renewable Generation
Facilities Regulations |
|
06-03-2018 |
Notification (S.R.O. 314(1)/2018
dated 06-03-2018) regarding applicability of the NEPRA Competitive Bidding Tariff (Approval
Procedure) Regulations 2014 & 2017" |
|
06-03-2018 |
Notice of Admission/ Hearing - Tariff
Petition Filed by Sukkur Electric Power
Company Limited (SEPCO) for
Determination of its Consumer End Tariff
pertaining to the FY 2016-17 & FY 2017-18 |
|
Tariff Petition Filed by Sukkur Electric Power
Company Limited (SEPCO) for
Determination of its Consumer End Tariff
pertaining to the FY 2016-17 & FY 2017-18 |
||
Issues
framed for hearing
- SEPCO |
||
01-03-2018 |
Notice of
Admission
- Application of CJ Hydro (Private)
Limited for grant of Generation Licence |
|
Application
of CJ Hydro (Private) Limited for
grant of Generation Licence |
||
01-03-2018 |
Notice
regarding Licensee Proposed Modification in
the Generation Licence of Kohinoor Mills
Limited |
|
Application for
Modification in the Generation Licence of
Kohinoor Mills Limited |
||
28-02-2018 |
Order of the
Authority in the matter of Suo-Moto Review
Proceedings regarding Generation Licence of
K-Energy (Pvt.) Ltd. and Licensee
Proposed Modification-V in the Generation
Licence of KEL |
|
28-02-2018 |
Suo-Moto
proceedings regarding Modification of
Working and Indexation Mechanism of Fuel
Cost Component of Bagasse Captive
Power Project and New Co-Generation Power
Projects. |
|
23-02-2018 |
Generation Licence No.
SGC/124/2018 - Licence Application No.
LAG-359 - Premier Industrial Chemical
Manufacturing Company (Private) Limited |
|
23-02-2018 |
Notice of Admission Generation
License Application of Al- Arabia Sugar
Mills Limited (ASML) |
|
Application for
Generation Licence Al-Arabia Sugar Mills
Limited (ASML) |
||
23-02-2018 |
Notice of Admission Tariff Petition
Filed by CIHC Pak Power Company Limited
for Approval of Generation Tariff for
300 MW (Gross) Coal-Fired Power Plant at
Gawadar, Balochistan |
|
Tariff Petition Filed by CIHC Pak
Power Company Limited for Approval of
Generation Tariff for 300 MW (Gross)
Coal-Fired Power Plant at Gawadar, Balochistan |
||
23-02-2018 |
Notice Licensee Proposed Modification
(LPM) in the Generation Licence of
Jamshoro Power Company Limited (JPCL) |
|
JPCL
Modification in Generation Licence
(GL/01/2002) |
||
22-02-2018 |
Tariff Petition filed by Zhenfa
Pakistan New Energy Company (Pvt.) Limited
for the Determination of Reference
Generation Tariff in Respect of 100 MWp
Solar PV Power Plant |
|
19-02-2018 |
Grant of Special Purpose
Transmission Licence No: SPTL/03/2018
Licence Application No. LAT-05 Pak
Matiari — Lahore Transmission Company
(Private) Limited |
|
19-02-2018 |
Generation Licence
No. IGSPL/98/2018 - Licence Application No.
LAG-410 - Blue Star Energy (Private)
Limited (BSEPL) |
|
19-02-2018 |
Order in the
Matter of Approval of Bid Evaluation Report
Submitted by the Pakhtukhwa Development
Organization (PEDO) for 188 MW Naran
Hydropower Project |
|
19-02-2018 |
Order in the
Matter of Approval of Bid Evaluation Report
Submitted by the Pakhtukhwa Development
Organization (PEDO) for 12.3 MW Nandihar
Hydropower Project |
|
19-02-2018 |
Order in the
Matter of Approval of Bid Evaluation Report
Submitted by the Pakhtukhwa Development
Organization (PEDO) for 20.6 MW
Ghorband Hydropower Project |
|
19-02-2018 |
Order in the
Matter of Approval of Bid Evaluation Report
Submitted by the Pakhtukhwa Development
Organization (PEDO) for 96 MW Batakundi
Hydropower Project |
|
19-02-2018 |
Order in the
Matter of Approval of Bid Evaluation Report
Submitted by the Pakhtukhwa Development
Organization (PEDO) for 99 MW Arkari Gol
Hydropower Project |
|
18-02-2018 |
Notice of
Hearing: In the Matter of Application of
Lake City Management (Private) Limited
for the Consideration of Grant of
Generation and Distribution Licences |
|
Consolidated Issues to be discussed during the
Public Hearing in the matter of Application
of Lake City Management (Private) Limited
for the consideration of Grant of
Generation and Distribution License and Consumer-end Tariff for the Period
from January to June 2018 |
||
17-02-2018 |
Rescheduling of Hearing - Tariff Petition filed by
Lake City Management (Private) Limited
for the Determination of Generation Tariff
for its 3.76 MW RFO based Project Located in
Lahore |
|
17-02-2018 |
Hearing
regarding Fuel Charges Adjustment for the
Month of January 2018 for EX-WAPDA
Distribution Companies |
|
CPPAGL
Energy Purchase Data for the Month of January 2018 |
||
16-02-2018 |
Notice of Admission/ Hearing -
Petition filed by Lake City Management
(Private) Limited for the Determination
of its Consumer-end Tariff for the Period
from January to June 2018 |
|
Petition filed by Lake City
Management (Private) Limited for the
Determination of its Consumer-end Tariff for
the Period from January to June 2018 |
||
16-02-2018 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Ellcot Spinning
Mills Limited |
|
Generation Licence Renewal and Modification
application of Ellcot Spinning Mills Limited |
||
15-02-2018 |
Generation Licence
No. IGSPL/97/2018 - Licence Application No.
LAG-409 - Punjab Thermal Power (Private)
Limited (PTPPL) |
|
15-02-2018 |
NEPRA
Imposes Fine of Rs.10,000,000/ Ten
Million on NTDC for Delay in Projects |
|
15-02-2018 |
Notice of Admission - Generation
Licence Application of
Lootah Energy (Private) Limited |
|
Generation Licence Application of Lootah Energy (Private) Limited for
50 MW Wind Power Project at Jhimpir |
||
13-02-2018 |
Notice of
Public Hearing - in
the matter of application of Central
Power Purchasing Agency (Guarantee) Limited
for Registration as Market Operator |
|
Issues for
Public Hearing in the matter of Application
filed by CPPA-G for Registration as "Market
Operator" |
||
Application of Central Power Purchasing
Agency (Guarantee) Limited CPPAGL for
Registration as
Market Operator |
||
02-02-2018 |
Notice of Admission - Generation
Licence Application of Pakhtunkhwa Energy
Development Organization (PEDO) |
|
Application for
Generation Licence of Pakhtunkhwa
Energy Development Organization for
its Karora Hydropower Project. |
||
01-02-2018 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Port Qasim Electric
Power Company (Private) Limited (PQEPCPL) |
|
Application under
Regulation 10(2) of the NEPRA (Application &
Modification Procedure) Regulations. 1999
read together with all other enabling
provisions of law, on behalf of Port
Qasim Electric Power Company (Pvt.) Limited
for Modification of its Generation
License |
||
31-01-2018 |
RESCHEDULING
OF HEARING -
Tariff Petition of 2 MW Birmogh Golen
Hydro Power Project Submitted By
Sarhad Rural Support Program (SRSP) |
|
27-01-2018 |
Notice of Admission - Application of
Gharo Solar (Private) Limited (GSPL)
for Grant of the Generation Licence |
|
Application for
Generation License for a 50 MWp Solar PV
Plant by Gharo Solar (Private) Limited ("GSPL") |
||
26-01-2018 |
Grant of Generation
Licence No. SGC/123/2018 - Licence
Application No. LAG-412 - Sarhad Rural
Support Programme (SRSP) |
|
25-01-2018 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s.
Helios Power (Pvt.) Limited for
Determination of Reference Generation Tariff
in respect of 50 MWp Solar Power Project |
|
25-01-2018 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s. HNDS
Energy (Pvt.) Limited for Determination of
Reference Generation Tariff in respect of 50 MWp Solar Power Project |
|
25-01-2018 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s.
Meridian Energy (Pvt.) Limited for
Determination of Reference Generation Tariff
in respect of 50 MWp Solar Power Project |
|
25-01-2018 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s. Gharo Solar (Pvt.) Limited for Determination
of Reference Generation Tariff in respect of
50 MWp Solar Power Project |
|
25-01-2018 |
Determination of National
Electric Power Regulatory Authority in the
matter of Tariff Petition filed by M/s. Zorlu Solar Pakistan (Pvt.) Limited for
Determination of Reference Generation Tariff
in respect of 100 MWp Solar Power Project |
|
23-01-2018 |
NEPRA Performance
Evaluation Report of Public Sector GENCOs based on
Performance Standards (Generation) Rules (PSGR) 2009 for FY 2014-15
& 2015-16 |
|
19-01-2018 |
Notice of Hearing :- Regarding Fuel Charges Adjustment
for the Month of December 2017 for Ex-WAPDA Distribution
Companies |
|
CPPAG Energy
Purchase Data for the Month of December 2017 |
||
19-01-2018 |
Notice of Admission/Hearing :- Tariff Petition of 2MW
Birmogh Golen Hydro Power Project Submitted by SARHAD Rural
Support Program (SRSP) |
|
Cost-plus Tariff Petition in respect of 2 MW Birmogh Golen
Hydro Power Project District Chitral |
||
Issues framed for Hearing:- In
the matter of cost plus tariff petition of 2MW Birmogh Golen Hydro
Power Project, District Chitral |
||
18-01-2018 |
Press Release :- NEPRA has imposed a fine of PKR 5 Million
each on three public sector GENCOs i.e. Jamshoro Power
Company Limited - JPCL (GENCO-I), Central Power Generation
Company Limited - CPGCL (GENCO-II) and Northern Power
Generation Company Limited - NPGCL (GENCO-III) under NEPRA
(Fines) Rules 2002, for violating prescribed limits of auxiliary
power consumption during the years 2012, 2013 and 2014. |
|
16-01-2018 |
Modification in Generation Licence No: SGC/30/2005
- Licence Application No. LAG-65 - Lucky Energy (Private) Limited
(LEPL) |
|
16-01-2018 |
Press Release -
NEPRA announced
Upfront Tariff for Municipal Solid Waste Power Plants |
|
15-01-2018 |
Determination of the Authority in the Matter of
Upfront Generation Tariff for Municipal Solid Waste Power
Projects |
|
11-01-2018 |
Adjournment of
Hearing - Tariff Petition filed by Lake City Management
(Private) Limited for its 3.67 MW RFO Based Project Located in
Lahore |
31-12-2017 |
Situations Vacant
: Consultant (Distribution), Consultant (Operations and
Maintenance) Last date 15-01-2018. Anwar Malik,
DG Admin & HR, NEPRA |
|
28-12-2017 |
Notice of
Admission / Hearing : Approval of rates for Import of
Electric Power 700.7 MW by (CPPA-G) from Azad Pattan
Hydropower Project situated in AJK under NEPRA Import of Power
Regulation, 2017 |
|
Issues framed for
Hearing : Any person may
also file the Comments in the matter within seven (7) days of this
publication |
||
EPC Stage Tariff
Proposal:
Azad Pattan
Hydropower Project |
||
28-12-2017 |
Notice: Licensee Proposed Modification (LPM)
in the Generation Licence of Gulf Powergen (Pvt) Ltd. All
Stakeholders, interested / affected persons and general public are
invited to submit their comments in favor / or against LPM within a period of
14 days from the
date of publication of this notice |
|
Proposed Licence Modification (LPM)
in the Generation Licence of Gulf Powergen (Pvt) Ltd |
||
26-12-2017 |
Determination of the Authority in the
matter of Tariff Petition filed by Punjab Thermal Power (Private)
Limited for Determination of Generation Tariff for 1,263.2 MW
Power Project on RLNG/HSD at Jhang |
|
20-12-2017 |
Amendments in the National Electric Power
Regulatory Authority (Alternative & Renewable Energy) Distributed
Generation and Net Metering Regulations 2015, notified vide
S.R.O. 892(1)/2015 dated 151 September, 2015 |
|
20-12-2017 |
Hearing regarding
Fuel Charges Adjustment for the Month of November 2017 for Ex-WAPDA
Distribution Companies |
|
CPPAG Energy
Purchase Data for the Month of November 2017 |
||
20-12-2017 |
Notice of
Admission - Application of
Reon Alpha (Private) Limited For grant of Generation Licence |
|
Application of
Reon Alpha (Private) Limited For grant of Generation Licence |
||
20-12-2017 |
Notice of Admission regarding
Application of Jilani Energy (Private) Limited For the
grant of generation licence |
|
Application of
Jilani Energy (Private) Limited For the grant of
generation licence |
||
17-12-2017 |
Vehicle for Auction - NEPRA invites
sealed bids for sale of the Vehicle on "As is Where is" basis GF
009 Toyota Corolla (GLI) 1299 CC 2013 Model for Sale - Anwar
Malik DG (Admin & HR), NEPRA Tower, G-5/1, Islamabad |
|
17-12-2017 |
Notice of Admission / Hearing - Petition
filed by Hyderabad Electric Supply Company Limited (HESCO)
for the Determination of its Consumer-end Tariff Pertaining to the
FY 2016-17 & FY 2017-18 |
|
Consumer-end
Tariff Petition for FY 2016-17 and FY 2017-18 Hyderabad Electric
Supply Company Limited (HESCO) |
||
HESCO ISSUES FRAMED FOR
HEARING - For the purpose of hearing the following issues have
been framed to be considered during the hearing and for presenting
written as well as oral evidence and arguments: |
||
16-12-2017 |
Addendum-II to
Notice of Licensee Proposed Modification in the Generation Licence
of ICI Pakistan Powergen Limited |
|
16-12-2017 |
Notice - Licensee
Proposed Modification (LPM) in the Generation Licence of Reshma
Power Generation (Private) Limited |
|
Reshma Power
Generation (Private) Limited application for Renewal of
Generation Licence No. IGSPL/58/2015 |
||
16-12-2017 |
Notice - Licensee Proposed Modification (LPM)
in the Generation Licence of Hunza Power (Private) Limited |
|
Hunza Power (Private)
Limited Modification of License No. 1GSPL/76/2017 under
Regulation 10(2) of NEPRA Licensing (Application & Modification
Procedure) Regulation, 1999 |
||
16-12-2017 |
||
Notice of
Admission / Hearing - EPC
Stage Tariff Proposal of 1124 MW Kohala Hydro Power Project
Submitted by Central Power
Purchasing Agency Gurantee Limited (CPPA-G) |
||
Submission of the EPC Stage Tariff Proposal
of 1124 MW Kohala Hydro Power Project by CPPA-G |
||
List of Issues -
Kohala
Hydro Power Project |
||
15-12-2017 |
Determination of the Authority in the matter of
Upfront Generation Tariff for Biomass Power Projects |
|
11-12-2017 |
PRESS RELEASE - NEPRA IMPOSES FINE ON CPPA-G |
|
07-12-2017 |
||
Notice for Seeking Comments of
the Stakeholders in the Matter of Amendments in the
Net Metering Regulations |
||
Matrix on Amendments
in the National Electric Power Regulatory Authority (Alternative &
Renewable Energy) Distributed Generation and Net Metering
Regulations, 2015 |
||
Advertisement published
on November 11, 2017 for Seeking Comments of the Stakeholders
in the Matter of Proposed Amendments in the
Net Metering Regulations |
||
Amendment in the Net Metering Regulations, 2015 Proposed by Ministry of Energy |
||
30-11-2017 |
Decision of the Authority in the matter
of Fuel Charges Adjustment for the Month of October 2017 for
XWDISCOs along with Notification Thereof |
|
30-11-2017 |
Notice of Hearing
- Regarding Tariff Petition filed by Punjab Thermal Power (Pvt)
Limited for Approval of Generation Tariff for RLNG based Power
Plant of 1263.2 MW (Gross) at Jhang, Punjab |
|
28-11-2017 |
Press Release : Imposition of fine on Peshawar Electric Supply Company and
Central Power Purchasing Agency (Guarantee) Limited on account
of non-execution of power purchase agreement with Pakhtunkhawa
Energy Development Organization regarding Pehur Hydel Power Project |
|
27-11-2017 |
Press Release : NEPRA Imposes Heavy
Fine on NTDC |
|
27-11-2017 |
Generation Licence
No. IGSPL/95/2017 Licence Application No. LAG-384 Mehar
Hydropower (Private) Limited (MHPPL) |
|
27-11-2017 |
Generation Licence No. IGSPL/96/2017
Licence Application No. LAG-404 Ghotki Power (Private) Limited
(GPPL) |
|
27-11-2017 |
Generation Licence No. WPGL/53/2017
Licence Application No. LAG-399 Lakeside Energy (Private) Limited
(LEPL) |
|
27-11-2017 |
Generation Licence No. WPGL/52/2017
Licence Application No. LAG-398 Master Green Energy Limited (MGEL) |
|
27-11-2017 |
Generation Licence
No. WPGL/51/2017 Licence Application No. LAG-396 Norinco
International Thatta Power (Pvt.) Limited Plant-II
(NITPPL) |
|
22-11-2017 |
Determination of the
Authority in the matter of Bulk supply Tariff for WAPDA
Hydroelectric for Financial Year 2017-18 |
|
20-11-2017 |
||
Generation Licence No: SGC/122/2017 - Licence
Application No. LAG-335 - ICI Pakistan Limited (ICIPL) |
||
18-11-2017 |
||
Notice of Hearing
- Hearing Regarding Fuel Charges Adjustment for the Month of October
2017 for
Ex-WAPDA Distribution Companies |
||
CPPAG Energy Purchase
Data for the Month of October 2017 |
||
12-11-2017 |
||
Notice of Admission/
Hearing - Petition filed by Multan Electric Power Company (MEPCO)
for the Determination of its Consumer-end Tariff Pertaining to the
FY 2016-17 & FY 2017-18 |
||
Petition filed by Multan
Electric Power Company (MEPCO) for the Determination of its
Consumer-end Tariff Pertaining to the FY 2016-17 & FY 2017-18 |
||
Issues for
Hearing Regarding Tariff Petition of MEPCO for the FY 2016-17
& FY 2017-18 |
||
12-11-2017 |
||
Notice of Admission
- Application of Sarhad Rural Support Programme for Grant of
Generation Licence |
||
Generation Licence
Application of Sarhad Rural Support Programme |
||
11-11-2017 |
||
Notice for Seeking Comments of
the Stakeholders in the Matter of Proposed Amendments in the
Net Metering Regulations |
||
Amendment in the Net Metering Regulations, 2015 proposed by
Ministry of Energy |
||
10-11-2017 |
||
Determination of the
Authority regarding Upfront Tariff 2017 for New Bagasse
Based Cogeneration Power Projects |
||
08-11-2017 |
||
Rescheduling of
Hearing - Tariff Petition filed by Gharo Solar (Pvt.) Limited
for the Determination of Generation Tariff in Respect of 50 MWp
Solar PV Power Plant |
||
08-11-2017 |
||
Rescheduling of
Hearings -
|
||
28-10-2017 |
||
Notice of
Admission - Tariff Petition filed by Zhenfa Pakistan New
Energy Company (Pvt.) Limited for the Determination of
Reference Generation Tariff in respect of 100 MWp Solar Power Plant. |
||
Tariff Petition
filed by Zhenfa Pakistan New Energy Company
(Pvt.) Limited for the Determination of
Reference Generation Tariff in respect of 100 MWp
Solar Power Plant. |
||
28-10-2017 |
||
Notice
- Licensee Proposed Modification (LPM) in the Generation Licence of
Shaheen Renewable Energy 1
(Private) Limited |
||
Licencee Proposed Modification (LPM)
application for 51 MW Shaheen
Renewable Energy 1 Wind Power Project at Bholari, Sindh |
||
28-10-2017 |
||
Second
Addendum to Notice of Admission Pertaining to Application of
Premier Industrial Chemical Manufacturing Company (Private) Limited
for grant of Generation Licence |
||
27-10-2017 |
||
Decision of the
Authority in the matter of Fuel Charges Adjustment for the
Month of September 2017 for XWDISCOs along with Notification
Thereof |
||
26-10-2017 |
||
Notice of
Hearing - Tariff petition filed by Helios Power (Pvt.)
Limited for the determination of reference generation tariff in
respect of 50 MWp solar pv power plant |
||
26-10-2017 |
||
Notice of
Hearing - Tariff petition
filed by Gharo Solar (Pvt.) Limited for the determination of
generation tariff in respect of 50 MWp solar pv power plant |
||
26-10-2017 |
||
Notice of
Hearing - Tariff petition filed by Meridian Energy (Pvt.)
Limited for the determination of reference generation tariff in
respect of 50 MWp solar pv power plant |
||
26-10-2017 |
||
Notice of
Hearing - Tariff petition filed by HNDS Energy (Pvt.) Limited
for the determination of reference generation tariff in respect of
50 MWp solar pv power plant |
||
25-10-2017 |
||
Adjournment of Hearing - Tariff Petition
filed by Lake City Management (Private) Limited for
Determination of Generation Tariff for its 3.76 MW RFO based Project
Located in Lahore. |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Islamabad Electric Supply Company Ltd. (IESCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Lahore Electric Supply Company Ltd. (LESCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Multan Electric Power Company Ltd. (MEPCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year :Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Gujranwala Electric Power Company Ltd. (GEPCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D) Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Hyderabad Electric Supply Company Ltd. (HESCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Sukkur Electric Power Company Ltd. (SEPCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Faisalabad Electric Supply Company Ltd. (FESCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Quetta Electric Supply Company Ltd. (QESCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo Moto
Proceedings regarding Periodical Adjustments on account of Power
Purchase Price (PPP) including Impact of T&D Losses on FCA) and
Prior Year Adjustment (PYA) pertaining to the FY 2016-17 in the
Consumer End Tariff of Tribal Areas Electricity Supply Company
Ltd. (TESCO) |
||
23-10-2017 |
||
Decision of the Authority in the matter of Suo
Moto Proceedings regarding Periodical Adjustments on account of
Power Purchase Price (PPP) including Impact of T&D Losses on FCA)
and Prior Year Adjustment (PYA) pertaining)to the FY 2016-17 in the
Consumer End Tariff of Peshawar Electric Supply Company Ltd. (PESCO) |
||
21-10-2017 |
||
Notice
regarding amendment in the Net Metering Regulations to
Include Agricultural Consumers. |
||
19-10-2017 |
||
Public Notice - Draft NEPRA Tariff Adjustments At
Commercial Operation Date (Generation and Transmission) Guidelines,
2017 for Seeking input/ Comments from all relevant
agencies/stakeholders for facilitation of Tariff Adjustment at COD
within 30 days |
||
Draft
National Electric Power Regulatory Authority (NEPRA) Tariff
Adjustments At Commercial Operation Date (Generation and
Transmission) Guidelines, 2017 |
||
17-10-2017 |
||
Notice of Hearing
- Hearing regarding Fuel Charges Adjustment for the Month of
September 2017 for EX-WAPDA Distribution Companies |
||
CPPAG
Energy Purchase data for the month of September 2017 |
||
16-10-2017 |
||
Grant of Generation Licence No. IGSPL/94/2017
- Licence Application No. LAG-400 - HSM Energy Limited (HSMEL) |
||
15-10-2017 |
||
Job Opportunity
(Front Desk Executive (01), Protocol Assistant (Medical) (01),
Control Room Operator (01) Last date 30-10-2017. Anwar Malik,
DG Admin & HR, NEPRA |
||
14-10-2017 |
||
Notice of
Admission - Application of Kamoke Power Gen (Private) Limited
(KPPL) for the Grant of Generation Licence. |
||
14-10-2017 |
||
Notice of
Admission/ Hearing - Tariff
Petition filed by Lake City Management (Private) Limited for
Determination of Generation Tariff for its 3.76 MW RFO based Project
Located in Lahore. |
||
Tariff Petition
filed by Lake City Management (Private) Limited for
Determination of Generation Tariff for its 3.76 MW RFO based Project
Located in Lahore. |
||
Lake City Submission
Nov 20, 2017 |
||
10-10-2017 |
||
Notification (S.R.O.1025/(1)/2017 dated
10-10-2017) regarding Amendments in "NEPRA (Alternative &
Renewable Energy) Distributed Generation and Net Metering
Regulations, 2015" |
||
10-10-2017 |
||
Grant of Generation Licence No. IGSPL/93/2017
- Licence Application No. LAG-392 - Hamza Sugar Mills Limited (HSML) |
||
10-10-2017 |
||
Grant of Generation Licence No. SPGL/24/2017
- Licence Application No. LAG-357 - Siachen Energy Limited (SEL) |
||
10-10-2017 |
||
Decision of the Authority in the matter of
Upfront Tariff Applications of Six Solar Power Projects
Pursuant to the Judgment of Honorable Islamabad High Court dated
04.07.2016 |
||
09-10-2017 |
||
Decision of the Authority in the matter of
Motions for Leave for Review filed by K-Electric Limited,
M/s. Whistle Blower Pakistan, M/s. Karachi Chamber of Commerce and
Industry, Mr. M. Arif Bilvani and Choudhry Mazhar Ali against
Determination of the Authority regarding Multi Year Tariff Petition
tiled by K-Electric Limited for the period commencing from
July 01, 2016 to June 30, 2023 |
||
05-10-2017 |
||
Notice of Admission -
Tariff
Petition filed by Punjab Thermal Power (Private) Limited for
Approval of Generation Tariff for RLNG based Power Plant of 1263.2
MW (Gross) at Jhang, Punjab. |
||
Tariff
Petition filed by Punjab Thermal Power (Private) Limited
for Approval of Generation Tariff for RLNG based Power Plant of
1263.2 MW (Gross) at Jhang, Punjab |
||
Addendum to the tariff Petition
filed by Punjab Thermal Power (Private) Limited for
Approval of Generation Tariff for RLNG based Power Plant of 1263.2
MW (Gross) at Jhang, Punjab. |
||
05-10-2017 |
||
Notice of Admission - Application of Blue Star Energy
(Private) Limited for Grant of Generation Licence. |
||
Application of Blue
Star Energy (Private) Limited for Grant of Generation Licence. |
||
03-10-2017 |
||
Performance Evaluation Report of
DISCOs & K-Electric 2015-16 in Comparison with 2011-12,
2012-13, 2013-14, 2014-15 |
||
02-10-2017 |
||
Decision of the Authority in the matter of
Fuel Charges Adjustment for the Month of August 2017 for
XWDISCOs along with Notification Thereof |
||
30-09-2017 |
||
Notice of
Admission - Corrigendum - Sup Moto Proceedings Regarding Periodical adjustments on account of Power Purchase Price
(PPP) and Prior year Adjustment (PYA) Pertaining to the FY 2016-17
in the Consumer-end Tariff of XWDISCOs |
||
29-09-2017 |
||
Notice of
Admission - Application of Punjab Thermal Power (Private)
Limited for Grant of Generation Licence |
||
Application of
Punjab Thermal Power (Private) Limited for Grant of
Generation Licence |
||
29-09-2017 |
||
Notice of
Admission - Lasbela Industrial Estate Development
Auhtority (LIEDA) for Grant of Distribution Licence. |
||
Application of
Lasbela Industrial Estate Development Auhtority (LIEDA) for
Grant of Distribution Licence |
||
28-09-2017 |
||
Tariff petition
filed by HNDS Energy (Pvt.) Limited for the determination of
reference generation tariff in respect of 50 MWp Solar PV power
plant |
||
Submission of the Tariff
Petition of 50 MWp Solar Power Project of HNDS Energy
(Pvt.) Limited |
||
28-09-2017 |
||
Tariff petition
filed by Meridian Energy (Pvt.) Limited for the determination
of reference generation tariff in respect of 50 MWp Solar PV power
plant |
||
Submission of the Tariff
Petition of 50 MWp Solar Power Project of Meridian Energy (Pvt.)
Limited |
||
28-09-2017 |
||
Tariff petition
filed by Helios Power (Pvt.) Limited for the determination of
reference generation tariff in respect of 50 MWp Solar PV power
plant |
||
Submission of the Tariff
Petition of 50 MWp Solar Power Project of Helios Power
(Pvt.) Limited |
||
26-09-2017 |
||
Suo Moto Proceedings
Regarding Periodical adjustments on account of Power Purchase Price
(PPP) and Prior year Adjustment (PYA) Pertaining to the FY 2016-17
in the Consumer-end Tariff of XWDISCOs |
||
26-09-2017 |
Grant of Generation
Licence No. IGSPL/92/2017 - Licence Application No.
LAG-388 - Mehran Energy Limited (MEL) |
|
26-09-2017 |
||
Suo Moto Proceedings
Regarding Periodical adjustments on account of Power Purchase Price
(PPP) and Prior year Adjustment (PYA) Pertaining to the FY 2016-17
in the Consumer-end Tariff of XWDISCOs |
||
25-09-2017 |
Grant of Generation
Licence No. IGSPL/91/2017 - Licence Application No. LAG-386 -
Two Star Energy (Private) Limited (TSEPL) |
|
25-09-2017 |
Decision of the
Authority in the matter of Motion for Leave for Review filed by
National Transmission & Despatch Company Ltd. (NTDC) against
Decision Dated April 11, 2017 with respect to Transfer/Wheeling
Charges |
|
21-09-2017 |
||
Notice of Hearing - Hearing
regarding fuel charges adjustment for the month of August 2017 for
Ex-WAPDA Distribution Companies. |
||
CPPAG Energy Purchase
data for the month of August 2017 |
||
20-09-2017 |
||
Decision of the National
Electric Power Regulatory Authority in the matter of Motion for
Leave for Review filed against Decision of the Authority dated March
3, 2017 in the matter of Solar PV Power Generation Tariff |
||
20-09-2017 |
||
Notice - Licensee
Proposed Modification (LPM) in the Generation Licence of
Zorlu Solar Pakistan (Private) Limited |
||
License Prosed Modification
application for 100 MW Zorlu
Solar Pakistan (Private) Limited |
||
20-09-2017 |
||
Grant of Generation
Licence No. IGSPL/90/2017 - Licence Application No. LAG-387 -
Sheikhoo Power (Private) Limited (SPPL) |
||
19-09-2017 |
||
Grant of Generation
Licence No. SGC/121/2017 - Licence Application No. LAG-366 -
Jauharabad Sugar Mills Limited (JIMSML) |
||
18-09-2017 |
||
Re-determination
of the Authority in the matter of Request for Reconsideration
pertaining to the Tariff Determination dated February 29, 2016 and
Review Decision dated May 11, 2016 with respect to Multan
Electric Power Company Ltd. (MEPCO) for the FY 2015-16 under
Section 31(4) of NEPRA Act 1997 |
||
18-09-2017 |
||
Re-determination of the
Authority in the matter of Request for Reconsideration pertaining to
the Tariff Determination dated February 29, 2016 and Review Decision
dated May 11, 2016 with respect to Sukkur Electric Power Company
Ltd. (SEPCO) for the FY 2015-16 under Section 31(4) of NEPRA Act
1997 |
||
18-09-2017 |
||
Re-determination
of the Authority in the matter of Request for Reconsideration
pertaining to the Tariff Determination dated December 31, 2015 and
Review Decision dated May 11, 2016 with respect to Faisalabad
Electric Supply Company Ltd. (FESCO) for the FY 2015-16 to
2019-20 under Section 31(4) of NEPRA Act 1997 |
||
18-09-2017 |
||
Re-determination
of the Authority in the matter of Request for Reconsideration
pertaining to the Tariff Determination dated April 1, 2016 and
Review Decision dated May 18, 2016 with respect to Hyderabad
Electric Supply Company Ltd. (HESCO) for the FY 2015-16 under
Section 31(4) of NEPRA Act 1997 |
||
18-09-2017 |
||
Re-determination
of the Authority in the matter of Request for Reconsideration
pertaining to the Tariff Determination dated February 29, 2016 and
Review Decision dated May 11, 2016 with respect to Gujranwala
Electric Power Company Ltd. (GEPCO) for the FY 2015-16 under
Section 31(4) of NEPRA Act 1997 |
||
18-09-2017 |
||
Re-determination
of the Authority in the matter of Request for Reconsideration
pertaining to the Tariff Determination dated February 29, 2016 and
Review Decision dated May 18, 2016 with respect to Islamabad
Electric Supply Company Ltd. (IESCO) for the FY 2015-16 to
2019-2(1 under Section 31(4) of NEPRA Act 1997 |
||
18-09-2017 |
||
Re-determination
of the Authority in the matter of Request for Reconsideration
pertaining to the Tariff Determination dated February 29, 2016 and
Review Decision dated May 13, 2016 with respect to Peshawar
Electric Supply Company Ltd. (PESCO) for the FY 2015-16 under
Section 31(4) of NEPRA Act 1997 |
||
18-09-2017 |
||
Re-determination
of the Authority in the matter of Request for Reconsideration
pertaining to the Tariff Determination dated March 8, 2016 and
Review Decision dated May 19, 2016 with respect to Lahore
Electric Supply Company Ltd. (LESCO) for the FY 2015-16 to
2019-20 under Section 31(4) of NEPRA Act 1997 |
||
17-09-2017 |
||
Notice of Admission -
Tariff Petition filed by Gharo Solar (Pvt.) Limited for
the Determination of Generation Tariff in respect of 50 MWp Solar PV
Power Plant. |
||
Tariff Petition of
Gharo Solar (Pvt.) Limited for the Determination of Generation
Tariff in respect of 50 MWp Solar PV Power Plant |
||
15-09-2017 |
||
Notice of Admission -
DHA Energy Supply Company (Private) Limited (DESCO) for grant of
Distribution Licence. |
||
Application of
DHA Energy Supply Company (Private) Limited (DESCO) for grant of
Distribution Licence. |
||
13-09-2017 |
Notice of Admission -
Application of CIHC Pak Power Company Limited for the Grant
of Generation Licence |
|
Application of China Communications
Construction Company Limited for Grant of Generation License in
Respect of 300 MW Thermal Power Project, Gwadar, Balochistan |
||
10-09-2017 |
||
Hiring of
Consultant
Required to carry out Coal Price Adjustment of imported Coal based
Power Plants |
||
TERMS OF REFERENCE/SCOPE OF WORK |
||
31-08-2017 |
Amendment in
NEPRA (Review Procedure) Regulations, 2009
( S.R.O. 870(I)/2017 DATED 31-08-2017) |
|
31-08-2017 |
Grant of Generation
Licence No. SGC/120/2017 - Licence Application No. LAG-382 -
Pakistan Atomic Energy Commission (PAEC) |
|
31-08-2017 |
Comments of
Stakeholders are invited within 03 weeks on the draft
formats for filing generation tariff petition by steam turbine
based power plants |
|
30-08-2017 |
||
Notice -
Licensee Proposed Modification in the
Generation Licence of Lucky Energy (Private) Limited (LEPL) |
||
License Proposed Modification
Application on behalf of Lucky Energy (Private) Limited (LEPL) |
||
29-08-2017 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the
Month of July 2017 for XWDISCOs along, with Notification
Thereof |
|
29-08-2017 |
||
Notice to Submit
Comments regarding Public Hearing in the Matter of Authority
Proposed Modification (APM) proceeding with respect to
Generation Licence of Central Power Generation Company Limited (CPFCL/GENCO-III) |
||
Central Power
Generation Company Limited
License Proposed Modification Application on behalf of Chief
Executive Officer, CPGCL/GENCO-II, Guddu |
||
25-08-2017 |
Notice of Admission/ Public Hearing -
Tariff Petition filed by Pakhtunkhwa Energy Development
Organization (PEDO) for Daral Khawar Hydropower Project 36.6 MW
for EPC Stage Tariff |
|
Pakhtunkhwa Energy Development
Organization (PEDO) Application for EPC Level
Tariff Petition for 36.6 MW Daral Khwar Hydropower Project,
District Swat, |
||
23-08-2017 |
||
Generation Licence No. IGSPL/88/2017 -
Licence Application No. LAG-376 - Mandi Baha Ud Din Energy
Limited (MBDEL) |
||
19-08-2017 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Huaneng
Shandong Ruyi (Pakistan) Energy (Private) Limited |
|
Huaneng Shandong Ruyi (Pakistan) Energy (Private) Limited
application for Modification in
the Generation Licence |
||
18-08-2017 |
Approval of Grid Code Addendum No. I (Revision-1) for
Grid Integration of Wind Power Plants. |
|
18-08-2017 |
||
Grant of Generation
Licence No. SPGL/23/2017 - Licence Application No. LAG-391 -
Zorlu Solar Pakistan (Private) Limited (ZSPPL) |
||
18-08-2017 |
||
Notice of Hearing
- Hearing regarding fuel charges adjustment for the month of July
2017 for Ex-WAPDA Distribuition Companies |
||
CPPAG Energy Purchase Data for
the Month of July 2017 |
||
16-08-2017 |
Public Notice
for Soliciting Comments and feedback on Proposed Amendments in National Electric Power Regulatory Authority (Interconnection for
Renewable Energy Generation Facilities) Regulations, 2015 within
fifteen days |
|
Draft National Electric Power Regulatory Authority (Interconnection for
Renewable Energy Generation Facilities) Regulations, 2015 |
||
16-08-2017 |
Grant of Generation
Licence No. SPGL/22/2017 - Licence Application No. LAG-368 -
Meridian Energy (Private) Limited (MEPL) |
|
16-08-2017 |
Grant of Generation
Licence No. WPGL/50/2017 - Licence Application No. LAG-394 -
Indus Wind Energy Limited (IWEL) |
|
16-08-2017 |
Grant of Generation
Licence No. SPGL/20/2017 - Licence Application No. LAG-367 -
Helios Power (Private) Limited (HPPL) |
|
16-08-2017 |
Grant of Generation
Licence No. SPGL/21/2017 - Licence Application No. LAG-369 - HNDS
Energy (Private) Limited (HEPL) |
|
13-08-2017 |
Notice of Hearing - Tariff
Petition filed by Zorlu Solar Pakistan (Pvt.) Limited for the
Determination of Reference Generation Tariff in respect of 100 MWp
Solar Power Project. |
|
12-08-2017 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Central Power
Generation Company Limited |
|
Licensee Proposed Modification (LPM) in
the Generation Licence of Central Power Generation Company
Limited |
||
10-08-2017 |
Notice of Admission -
Application of Madina Sugar Mills Limited for grant of
generation licence. |
|
Application of Madina Sugar Mills
Limited
for the Grant of Generation Licence |
||
08-08-2017 |
Notice of Admission -
Application of Digri-Gen Limited for the Grant of Generation
Licence |
|
Application of Digri-Gen Limited
for the Grant of Generation Licence |
||
08-08-2017 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Shams Power
(Private) Limited |
|
Shams Power
(Private) Limited Application for Modification of
Generation license (license No: SPGL/18/2017) |
||
05-08-2017 |
Notice of Admission -
Application of Siddiqsons Energy Limited for the Grant of
Generation Licence |
|
Application of Siddiqsons Energy
Limited for the Grant of Generation Licence |
||
03-08-2017 |
Determination of the Authority in the matter
of Petition filed by the Tribal Areas
Electricity Supply Company Ltd. (TESCO)
for Determination of its Consumer end
Tariff Pertaining to Financial Year
2016-2017 |
|
03-08-2017 |
Decision of the
Authority in the matter of Induction of Security Cost for the
CPEC Projects in the Power Tariff to Ensure Security
Sustainability |
|
02-08-2017 |
Grant of Generation
Licence No. WPGL/48/2017 - Licence Application No. LAG-393 -
Metro Wind Power Limited (MWPL) |
|
01-08-2017 |
Grant of Generation
Licence No. WPGL/46/2017 - Licence Application No. LAG-385 - Noor
Solar Energy (Private) Limited (NSEPL) |
|
01-08-2017 |
Grant of Generation
Licence No. WPGL/47/2017 - Licence Application No. LAG-389 - Gul
Ahmed Electric Limited (GAEL) |
|
01-08-2017 |
Decision of the Authority in the matter
of Fuel Charges Adjustment for the Month of June 2017 for
XWDISCOs along with Notification Thereof |
|
31-07-2017 |
Generation Licence No. IGSPL/87/2017
Licence Application No. LAG-370 Gugera Hydro Power Company
(Private) Limited (GIIPCL) |
|
31-07-2017 |
Determination of
the Authority in the Matter of Upfront Tariff for Captive Power
Plants on Coal for Short Term Utilization of the Available
Generation Capacity |
|
31-07-2017 |
Determination of the Authority in the Matter of
Upfront Tariff for Captive Power Plants on Gas for Short Term Utilization of
the Available Generation Capacity |
|
29-07-2017 |
Amendments in the NEPRA (Alternative &
Renewable Energy) Distributed Generation and Net Metering Regulations,
2015 |
|
28-07-2017 |
Determination of the Authority in the matter of
Upfront Tariff for Captive Power Plants on RFO for Short Term Utilization
of the Available Generation Capacity |
|
28-07-2017 |
Press Release - NEPRA
Imposes Heavy Fine on HESCO & LESCO |
|
28-07-2017 |
Public Notice: For Soliciting Comments and
Feedback on the Concept Paper on Rationalization of Generation Tariff
Parameters |
|
Concept Paper -
Rationalization of Generation Tariff Parameters |
||
27-07-2017 |
Determination of the Authority in the Matter of Upfront
Generation Tariff for the Projects on Thar Coal |
|
19-07-2017 |
Notice of Hearing - Hearing regarding Fuel
Charges Adjustment for the month of June 2017 for Ex-WAPDA Distribution
Companies |
|
CPPAGL Energy Purchase Data for the
Month of June 2017 for Ex-WAPDA Distribution Companies. |
||
14-07-2017 |
Notice of Admission - Application of
Central Power Purchasing Agency (Guarantee) Limited CPPAGL for
Registration as
Market Operator |
|
Application of Central Power Purchasing
Agency (Guarantee) Limited CPPAGL for
Registration as
Market Operator |
||
12-07-2017 |
Notice of Admission - Regarding
Application of Ghotki Power (Pvt) Ltd for the Grant of Generation
Licence |
|
Generation Licence Application of Ghotki Power
(Pvt) Ltd |
||
12-07-2017 |
Notice of Admission - Regarding
Application of Pakhtunkhwa Energy Development Organization for
the Grant of Generation Licence |
|
Generation Licence Application of Pakhtunkhwa
Energy Development Organization |
||
08-07-2017 |
||
Notice of Admission - Tariff Petition
filed by Zorlu Solar Pakistan (Pvt) Limited |
||
Tariff Petition of 100 MW Solar Power
Project of Zorlu Solar Pakistan (Pvt) Limited |
||
08-07-2017 |
Notice of Admission - Generation Licence
Application of Sadiqabad Power (Pvt) Limited |
|
Generation Licence Application of Sadiqabad
Power (Pvt) Limited |
||
08-07-2017 |
Notice of Admission - Generation Licence
Application of Ranipur Energy (Pvt) Limited |
|
Generation Licence Application of Ranipur
Energy (Pvt) Limited |
||
08-07-2017 |
Notice of Admission - Generation Licence
Application of HSM Energy Limited |
|
Generation Licence Application of HSM Energy
Limited |
||
30-06-2017 |
Grant of Generation Licence No. WPGL/45/2017 - Licence
Application No. LAG-351 - Iran-Pak Wind Power (Private) Limited (IPWPPL) |
|
30-06-2017 |
Decision of the Authority in the matter of Fuel
Charges Adjustment for the Month of May 2017 for XWDISCOs along
with Notification Thereof |
|
23-06-2017 |
Notification (S.R.O
549(I)/2017 dated 22-06-2017) regarding NEPRA (Import of Electric Power
Regulations, 2017 |
|
23-06-2017 |
Notification (S.R.O
548(I)/2017 dated 22-06-2017) regarding amendment in the NEPRA Upfront
Tariff (Approval and Procedure) Regulations, 2011 (UTR-2011) |
|
20-06-2017 |
Notice of Admission - Generation Licence
Application of Lakeside Energy (Pvt.) Limited |
|
Generation Licence Application of Lakeside
Energy (Pvt.) Limited |
||
20-06-2017 |
Notice of Admission - Application of Master
Green Energy Limited (MGEL) for Grant of Generation Licence |
|
Application of Master Green Energy Limited (MGEL)
for Grant of Generation Licence |
||
20-06-2017 |
Notice of Admission - Application of
Star Textile Mills Limited for Grant of Generation Licence |
|
Application of Star Textile Mills Limited
for Grant of Generation Licence |
||
17-06-2017 |
Notice of Admission - Application of
Norinco International Thatta Power (Private) Limited for grant of Generation
Licence |
|
Application of Norinco International
Thatta Power (Private) Limited for grant of Generation Licence |
||
17-06-2017 |
Notice of Admission - Application of Indus
Wind Power for Grant of Generation Licence |
|
Application of Indus Wind Power for
Grant of Generation Licence |
||
16-06-2017 |
Notice of
Hearing - Hearing regarding Fuel Charges Adjustment for the Month of May
2017 for Ex-WAPDA Distribution Companies. |
|
CPPAG Information regarding
monthly fuel price adjustment of May 2017 |
||
15-06-2017 |
Notice -
Licensee Proposed Modification (LPM) in the Generation Licence of Hi-Tech
Pipes & Engineering Industries (Pvt.) Limited (Formerly Haji Muhammad Ismail
Mills Limited) |
|
Application for Licensee Proposed
Modification (LPM) in the Generation Licence of Hi-Tech Pipes &
Engineering Industries (Pvt.) Limited (Formerly Haji Muhammad Ismail Mills
Limited) |
||
13-06-2017 |
Grant of Generation Licence No. IGSPL/84/2017 -
Licence Application No. LAG-377 - Mirpurkhas Energy Limited (MPREL) |
|
13-06-2017 |
Grant of Generation Licence No. IGSPL/86/2017 -
Licence Application No. LAG-383 - Indus Energy Limited (IEL) |
|
13-06-2017 |
Grant of Generation Licence No. IGSPL/85/2017 -
Licence Application No. LAG-380 - Faran Power Limited (FPL) |
|
10-06-2017 |
Addendum to the Notice
of Admission regarding Application of Bahria Town (Private) Limited
for the Grant of Distribution Licence. |
|
07-06-2017 |
Rescheduling
of Hearing - Tariff Petition Filed by Kolachi Portgen (Private)
Limited for Determination of Generation Tariff for 450 MW RLNG based
combined cycle power plant. |
|
03-06-2017 |
Notice of Admission/ Hearing - All
Stakeholders, Interested/ Affected persons and the general public are
notified that Quetta Electric Supply Company Limited (QESCO) has
filed petition with the National Electric Power Regulatory Authority (NEPRA) for the determination of its Consumer-end tariff pertaining to the FY
2016-17 and FY 2017-18 |
|
Quetta Electric Supply Company
Limited (QESCO) petition for the determination of its Consumer-end
tariff pertaining to the FY 2016-17 |
||
Quetta Electric Supply Company
Limited (QESCO) petition for the determination of its Consumer-end
tariff pertaining to the FY 2017-18 |
||
Issues of Hearing
regarding Tariff Petition of QESCO for the FY 2016-17 |
||
Issues of Hearing
regarding Tariff Petition of QESCO for the FY 2017-18 |
||
03-06-2017 |
Notice of Admission/ Hearing - Power Acquisition
Request by K-Electric for Purchase of 11-14 MW Surplus Power from
Lottee Chemical Pakistan Limited. |
|
Power
Acquisition Request by K-Electric for Purchase of 11-14 MW Surplus
Power from Lottee Chemical Pakistan Limited. |
||
02-06-2017 |
Rescheduling of Hearing - Bulk Supply Tariff
Petition filed by WAPDA Hydroelectric for Approval/ Determination |
|
01-06-2017 |
Decision of the Authority in the matter of Fuel
Charges Adjustment for the Month of April 2017 for XWDISCOs along
with Notification Thereof |
|
30-05-2017 |
Decision of the National Electric Power Regulatory
Authority in the matter of Review Motion filed by Government of
Sindh against the Determination of New Tariff for Wind Power
Generation Projects |
|
30-05-2017 |
Postponement of Hearing
- Bulk Supply Tariff Petition filed by WAPDA Hydroelectric for
Approval / Determination |
|
25-05-2017 |
Decision of the Authority in the Matter of Application
for Unconditional Acceptance of Bagasse Upfront Tariff filed by Ittefaq
Power Limited (IPL) for its 23.86 MW Net (Spill Over to the Grid during
Crushing Season) and 28.11 MW Net (Spill Over to the Grid during Off Season)
31.2 MW (Gross Capacity) Cogeneration Power Project at Ittefaq Sugar Mills
Shafiabad, Channi Goth, District Bahawalpur, Punjab |
|
25-05-2017 |
Notice of Admission -
Application of NASDA Green Energy (Private) Limited for Grant of
Generation Licence |
|
Re-Application for a Generation License for NASDA Green
Energy (Pvt.) Limited 50 MW Wind Power Project. |
||
23-05-2017 |
Grant of Generation Licence No. IGSPL/79/2017 - Licence
Application No. LAG-353 - Datang Pakistan Karachi Power Generation
(Private) Limited (DPKPG) |
|
23-05-2017 |
Determination of the Authority in the matter of
Modification in Generation Licence No: IGSPL/65/2015 - Licence Application
No. LAG-305 - SIDDIOSONS ENERGY LIMITED (SEL) |
|
23-05-2017 |
Notice of Admission -
Petition filed by Chashma Nuclear Power Plant Unit-3 for
Determination of Generation Tariff |
|
23-05-2017 |
Notice Licensee Proposed Modification (LPM)
in the Generation Licence of Sitara Energy Limited (SEL) |
|
Sitara Energy Limited (SEL) application
for Modification of Generation Licence No. SGC/012/2002 |
||
23-05-2017 |
Notice Licensee Proposed Modification (LPM)
in the Distribution Licence of Sitara Energy Limited (SEL) |
|
Sitara Energy Limited (SEL) application
for Modification of Distribution Licence No. 12/DL/2006 |
||
19-05-2017 |
Grant of Generation Licence No. GL(Hydel)/13/2017
- Licence Application No. LAG-349 - Pakhtunkhwa Energy Development
Organization (PEDO) |
|
19-05-2017 |
Notice of Hearing - Hearing
regarding Fuel Charges Adjustment for the Month of April 2017 for
Ex-WAPDA Distribution Companies |
|
CPPAG
Energy Purchase Data for the Month of April 2017 |
||
19-05-2017 |
Notification (S.R.O. 350(I)/2017 dated 17-05-2017) regarding NEPRA
(Selection of Engineering, Procurement and Construction Contractor by
Independent Power Producers) Guidelines, 2017 |
|
19-05-2017 |
Notice of
Admission regarding Application of Gul Ahmed Electric Limited
(GAEL) for the Grant of Generation Licence. |
|
Application of Gul Ahmed Electric
Limited (GAEL) for the Grant of Generation Licence. |
||
19-05-2017 |
Notice of Admission
- Application of Metro Wind Power Limited for
the Grant of Generation Licence. |
|
Application of Metro
Wind Power Limited for the Grant of Generation
Licence. |
||
19-05-2017 |
Notice of Admission regarding
Application of Mehran Energy Limited for the Grant of
Generation Licence |
|
Application of Mehran Energy Limited
for the Grant of Generation Licence |
||
19-05-2017 |
Notice of Admission
- Application of Hamza Sugar Mills Limited
for the Grant of Generation Licence. |
|
Application of Hamza
Sugar Mills Limited for the Grant of Generation
Licence. |
||
19-05-2017 |
Notice of Admission -
Application of Pak Matiari-Lahore Transmission Company (Private)
Limited (PMTC) for Grant of Special Purpose Transmission Licence |
|
Application of Pak Matiari-Lahore
Transmission Company (Private) Limited (PMTC) for Grant of
Special Purpose Transmission Licence |
||
19-05-2017 |
Notice of Admission
- Generation Licence Application of Zorlu Solar
Pakistan (Private) Limited (ZSPPL) |
|
Generation Licence
Application of Zorlu Solar Pakistan (Private)
Limited (ZSPPL) |
||
17-05-2017 |
Postponement of Hearing - Bulk Supply Tariff Petition filed by
WAPDA Hydroelectric for Approval/ Determination |
|
14-05-2017 |
Net
Metering
Empowering People to Generate Power |
|
14-05-2017 |
Postponement of Hearing - Tariff Petition filed by Kolachi
Portgen (Private) Limited for Determination of Generation Tariff
for 450 MW RLNG based combined cycle power plant. |
|
12-05-2017 |
Decision of the Authority in the
Matter of Request for One Time Adjustment of Upfront
Tariff filed by Hamza Sugar Mills Limited (HSML)
for its 15 MW New Bagasse Based High Pressure
Co-generation Power Plant at Hamza Sugar Mills,
Jetha Bhutta, Khanpur, District Rahim Yar Khan |
|
10-05-2017 |
Decision of the Authority in the matter of Suo
Moto Proceedings for Development of Upfront Tariff for Waste Heat
Recovery Power Projects |
|
06-05-2017 |
Notice of Hearing
- Bulk Supply Tariff Petition filed by WAPDA
Hydroelectric for Approval/Determination |
|
06-05-2017 |
Notice of Admission - application of Trident
Power GR (Private) Limited (TPGPL) for Grant of Generation Licence |
|
Generation Licence
application of Trident Power GR (Private) Limited (TPGPL) |
||
04-05-2017 |
Decision of the National Electric
Power Regulatory Authority in the matter of
Application for Unconditional Acceptance of +/-660
KV, 4000 MW Matiari- Lahore Transmission Line
Tariff by Pak Matiari Lahore Transmission Company |
|
04-05-2017 |
Grant of Generation Licence
No. IGSPL/78/2017 - Licence Application No. LAG-374 - Ittefaq Power
Limited (ITFQPL) |
|
04-05-2017 |
Motion for Leave for review filed by Zonergy
Company Limited against the Decision of the
Authority in the matter of Solar PV Power Generation
Tariff dated March 3, 2017 |
|
04-05-2017 |
Motion for Leave for review
filed by Zhenfa Pakistan New Energy Company (Pvt.) Limited against
the Decision of the Authority in the matter of Solar PV Power Generation
Tariff dated March 3, 2017 |
|
03-05-2017 |
Decisions of the
Authority in the matter of Fuel Charges
Adjustments for the Months of February and
March 2017 for XWDISCOs along with
Notifications Thereof |
|
03-05-2017 |
Notification (S.R.O. 306 (1)/2017
dated 02-05-2017) regarding "NEPRA Competitive Bidding Tariff (Approval
Procedure) Regulations, 2017" |
|
03-05-2017 |
Notification (S.R.O. 303(I)/2017
dated 02-05-2017) regarding amendments in the NEPRA Licensing (Application &
Modification Procedure) Regulation, 1999 |
|
02-05-2017 |
Grant of Generation Licence No.
IGSPL/77/2017 - Licence Application No. LAG-375 -
Bahawalpur Energy Limited (BPREL) |
|
29-04-2017 |
Notice of Suo Moto Proceedings/ Hearing -
Upfront Tariff for captive power plants on RFO
for short term utilization of the available
generation capacity |
|
29-04-2017 |
Notice of Suo Moto
Proceedings/ Hearing - Upfront Tariff for
captive power plants on Gas for short term
utilization of the available generation capacity |
|
29-04-2017 |
Notice of Suo Moto Proceedings/ Hearing -
Upfront Tariff for captive power plants on Coal
for short term utilization of the available
generation capacity |
|
29-04-2017 |
Notice of Admission/
Hearing - Tariff Petition filed by Kolachi
PorRtgen Limited for Determination of Generation
Tariff 450 MW RLNG based Combined Cycle Power Plant |
|
Tariff Petition
filed by Kolachi Portgen Limited for
Determination of Generation Tariff 450 MW RLNG based
Combined Cycle Power Plant |
||
26-04-2017 |
Decision
of the Authority in the Matter of Application for
Unconditional Acceptance of Bagasse Upfront
Tariff filed by Indus Energy Limited (IEL)
for its 31 MW (Gross Capacity) New Bagasse Based
Cogeneration Power Plant at Indus Sugar Mills Ltd.,
Main Indus Road, Kot Bhahdur, Rajanpur, Punjab |
|
26-04-2017 |
Decision of the Authority in the
Matter of Application for Unconditional Acceptance
of Bagasse Upfront Tariff filed by Kashmir
Power (Pvt.) Limited (KPPL) for its 40 MW (Gross
Capacity) Bagasse Based Facility located at Kashmir
Sugar Mills Ltd., 11 KM — Shorkot Cantt Road Tehsil
Shorkot, District Jhang, Punjab |
|
26-04-2017 |
Decision
of the Authority in the Matter of Application for
Unconditional Acceptance of Bagasse Upfront
Tariff filed by Bahawalpur Energy Limited
(BEL) for its 31.2 MW (Gross Capacity) New
Bagasse Based Cogeneration Power Project at Ashraf
Sugar Mills Ltd., Ashraf Abad, District Bahawalpur,
Punjab |
|
25-04-2017 |
NEPRA
Evaluation Report for Hiring of Digital
Photocopier machines on Rental basis |
|
25-04-2017 |
Notice - Licensee
Proposed Modification (LPM) in the Generation
Licence of NC Electric Company Limited. |
|
NC
Electric Company Limited Application for
Licensee Proposed Modification in the Generation
Licence. |
||
22-04-2017 |
Notice of Admission
regarding Application of Sheikhoo Power (Private)
Limited for the Grant of Generation License |
|
Application of Sheikhoo
Power (Private) Limited for the Grant of
Generation License |
||
20-04-2017 |
Hearing regarding Fuel Charges Adjustment for
the Month of February & March 2017 for EX-WAPDA
Distribution Companies. |
|
CPPAG Information regarding
monthly fuel price adjustment of February 2017 |
||
CPPAG Information regarding
monthly fuel price adjustment of March 2017 |
||
18-04-2017 |
Grant of Generation Licence
No. WPGL/43/2017 - Licence Application No.
LAG-356 - Trans Atlantic Energy (Private) Limited
(TAEPL) |
|
14-04-2017 |
Notice of Suo Moto Proceedings/ Hearing -
Upfront Generation Tariff for Biomass Power Projects |
|
14-04-2017 |
Review Petition before NEPRA for Determination
of Upfront Tariff for Wind Power Projects by
Government of Sindh. |
|
13-04-2017 |
Notice of Hearing in the Matter of Authority
Proposed Modification (APM) Proceedings initiated
under Section-26 of the NEPRA Act read with
Regulations -10 (1) of the NEPRA Licensing
(Application and Modification procedure)
Regulations, 1999 (the "Regulations") - PIEDMC |
|
13-04-2017 |
Notice of Hearing
in the Matter of Authority Proposed Modification (APM)
Proceedings initiated under Section-26 of the NEPRA
Act read with Regulations -10 (1) of the NEPRA
Licensing (Application and Modification procedure)
Regulations, 1999 (the "Regulations") - BEPL |
|
12-04-2017 |
Performance Evaluation Report
of Jamshoro Power Company Limited (JPCL) GENCO-I,
Central Power Generation Company Limited (CPGCL)
GENCO-II, Northern Power Generation Company
Limited (NPGCL) GENCO-III, Lakhra Power
Generation Company Limited (LPGCL) GENCO-IV
based on
Performance Standards (Generation) Rules (PSGR)
2009 (For Years 2012, 2013 & 2014) |
|
11-04-2017 |
Determination of the Authority in
the matter of Petition filed by National
Transmission & Despatch Company Ltd. (NTDC) for
Determination of Transfer/Wheeling Charges for the
FY 2015-16 and FY 2016-17 |
|
11-04-2017 |
Generation Licence No. DGL/84/2017 - Licence
Application No. LAN-84 - Devolution Trust for Community Empowerment, Narowal |
|
11-04-2017 |
Generation Licence No. DGL/85/2017 -
Licence Application No. LAN-85 - Lt. Gen. (R)
Muhammad Ashraf, Islamabad |
|
11-04-2017 |
Generation Licence No. DGL/86/2017 -
Licence Application No. LAN-86 - Mr. Mohammad Arif
Oureshi, Islamabad |
|
11-04-2017 |
Notice of Admission - Petition filed by WAPDA
Hydroelectric for Revision of Tariff for FY
2017-18 for Bulk Supply of Power from WAPDA
Hydel Power Stations |
|
Revised/ corrected Bulk
Supply Tariff Petition - WAPDA
Hydroelectric for FY 2017-18 |
||
10-04-2017 |
Decision of the Authority in the matter of
Upfront Tariff for Small Hydro Power Generation Projects up to 25 MW
Installed Capacity — Extension of Date of Acceptance of Upfront
Tariff |
|
07-04-2017 |
Notification
(SRO241(1)/2017 dated 06-04-2017) regarding Guidelines to Lay Down the
Methodology & Process for Determination of Revenue
Requirement and Use Of System Charges (UOSC) for
Transmission Licensee |
|
07-04-2017 |
Notification (SRO240(1)/2017
dated 06-04-2017) regarding amendment in the NEPRA
Up-front Tariff (Approval and Procedure) Regulation,
2011 (UTR-2011) |
|
05-04-2017 |
Notice of Suo
Moto Proceedings/ Hearing - Upfront Generation
Tariff for Solid Waste to Energy Power
Projects |
|
04-04-2017 |
Grant of
Generation Licence No. WPGL/42/2017 - Licence
Application No. LAG-343 - ACT2 Wind (Private)
Limited (AWPPL) |
|
31-03-2017 |
Publication of Notification of Etihad
Power Generation Limited (EPGL) S.R.O. 224(I)/2017 |
|
31-03-2017 |
Notice of Admission
-
Application of Two Star Energy (Private) Limited
(TSEPL) for the Grant of Generation Licence |
|
Generation Licence
Application of Two Star Energy
(Private) Limited (TSEPL) |
||
29-03-2017 |
Postponement Notice of Public Hearing - in
the Matter of Authority Proposed Modification (APM)
Proceedings Initiated under Section-26 of the NEPRA
Act read with Regulation-10(1) of the NEPRA
Licensing (Application and Modification Procedure)
Regulations, 1999 (the “Regulations”)- Bismillah
Energy Private Limited |
|
29-03-2017 |
Postponement Notice of Public Hearing - in
the Matter of Authority Proposed Modification (APM)
Proceedings Initiated under Section-26 of the NEPRA
Act read with Regulation-10(1) of the NEPRA
Licensing (Application and Modification Procedure)
Regulations, 1999 (the “Regulations”)- PIEDMC |
|
29-03-2017 |
Notice of Admission/
Hearing - Petition filed by Tribal Areas
Electricity Supply Company Limited (TESCO) for
the Determination of its Consumer-end Tariff
Pertaining to the FY 2016-17 based on the Actual
Results for the FY 2015-16 |
|
Tariff Petition
FY 2016-17 Tribal Areas
Electricity Supply Company Limited (TESCO) |
||
Issues of Hearing |
||
28-03-2017 |
Grant of
Generation Licence No. WPGL/41/2017 - Licence
Application No. LAG-345 - Artistic Wind Power
(Private) Limited (AWPPL) |
|
25-03-2017 |
Notice of Admission
- Application of Mehar Hydropower (Private)
Limited for the Grant of Generation License |
|
Application of Mehar
Hydropower (Private) Limited for the Grant of
Generation License |
||
25-03-2017 |
Notice of Admission
- Application of Noor Solar Energy (Private)
Limited for the Grant of Generation Licence. |
|
Application of Noor
Solar Energy (Private) Limited for the Grant of
Generation Licence. |
||
24-03-2017 |
National Electric Power
Regulatory Authority Power Acquisition Programmes (Standards
& Procedures) Rules, 2017
for Soliciting meaningful feedback within one month. |
|
National Electric Power
Regulatory Authority (Review of Power Purchase
Agreements) Regulations, 2017 for
Soliciting meaningful feedback within one month. |
||
National Electric Power
Regulatory Authority (Import of Power)
Regulations, 2017
for
Soliciting
meaningful feedback within one month. |
||
24-03-2017 |
Notice of Admission
- Generation Licence Application of Pakistan
Atomic Energy Commission (PAEC) for its Coal
Fired Power Plants (CFPP) |
|
24-03-2017 |
Notice of Admission
regarding Application of Indus Energy Limited
for the grant of Generation Licence. |
|
Generation Licence
Application of Indus Energy Limited |
||
20-03-2017 |
Determination of the
Authority in the Matter of Karachi Electric
(K-Electric) Multi Year Tariff (MYT) Petition
for Determination of Tariff for the period
commencing from July 01, 2016 |
|
20-03-2017 |
Generation Licence
No. IGSPL/76/2017 issued to Hunza Power (Private)
Limited (HPPL) |
|
18-03-2017 |
Notice of Suo Moto
Proceedings: Inclusion of Security Cost in the
Power Tariff of CPEC Energy Projects Dated:
4th April 2017 Time 11:00 AM Venue: NEPRA Tower
G-5/1 Islamabad |
|
List of CPEC Energy
Projects |
||
18-03-2017 |
Notice of Hearing:
Determination of New Upfront Tariff for Bagasse
Based Co-Generation Projects Dated: 6th April
2017 Time 11:30 AM Venue: NEPRA Tower G-5/1
Islamabad |
|
Issues to be discussed during hearing in the
matter of determination of upfront tariff for new
bagasse based co-generation power projects on high
pressure boilers |
||
18-03-2017 |
Addendum to
Notice of Admission pertaining to Application of
Premier Industrial Chemical Manufacturing Company
(Private) Limited for Grant of Generation Licence |
|
17-03-2017 |
Notice of Admission: Application of
Faran Power Limited (FPL)
for the Grant of Generation Licence. All
stakeholders ,interested/affected persons and
general public are invited to submit their comments
in favour / or against the grant of Generation
Licence to FPL. The comments shall be submitted to
the office of Registrar (NEPRA) within period of
Fourteen (14) days from the date of this publication. |
|
Application of Faran Power Limited (FPL)
for the Grant of Generation |
||
12-03-2017 |
Notice of
Hearing : in the matter of Determination of New
Tariff for Thar Coal Based Power Projects |
|
10-03-2017 |
Generation Licence
No. DGL/53/2017 Licence Application No. LAN-53
NEPRA, Islamabad |
|
10-03-2017 |
Determination of
the Authority in the matter of Tariff Petition filed
by Kandiah Hydropower (Pvt.) Ltd. |
|
08-03-2017 |
Notice of Suo Moto Proceedings - Corrigendum -Upfront
Generation Tariff for Biomass Power Projects. |
|
05-03-2017 |
Notice of Public
Hearing : in the matter of Authority Proposed
Modification (APM) Proceedings initiated under
Section-26 of the NEPRA Act read with
Regulation-10(1) of the NEPRA Licensing (Application
and Modification Procedure) Regulations, 1999 (the
"Regulation") Punjab Industrial Estate
Development & Management Company (PIEDMC) |
|
Distribution Licence Application Punjab Industrial
Estate Development & Management Company (PIEDMC) |
||
Issues of
Hearing
Punjab Industrial Estate Development & Management
Company (PIEDMC) |
||
05-03-2017 |
Notice of Public
Hearing : in the matter of Authority Proposed
Modification (APM) Proceedings initiated under
Section-26 of the NEPRA Act read with
Regulation-10(1) of the NEPRA Licensing (Application
and Modification Procedure) Regulations, 1999 (the
"Regulation") Bismillah Energy Pvt Ltd |
|
Distribution Licence Application Bismillah Energy Pvt Ltd |
||
Issues of
Hearing Bismillah Energy Pvt Ltd |
||
Comments of LESCO-Bismillah
Energy Pvt Ltd |
||
05-03-2017 |
Notice of Suo Moto
Proceedings : Upfront Generation Tariff for
Solid Waste to Energy Power Projects.
All the stakeholders
and interested/affected persons who desire to
participate in the proceedings may file written comments within fifteen (15) days
from the date of publication of this notice. |
|
Notice of Suo Moto
Proceedings : Corrigendum Upfront
Generation Tariff for Solid Waste to Energy Power
Project |
||
03-03-2017 |
Decision of Authority
in the Matter of Solar PV Power Generation Tariff |
|
03-03-2017 |
Decision
of the Authority in the matter of Fuel Charges
Adjustment for the Month of January 2017 for
XWDISCOs along with Notification Thereof |
|
25-02-2017 |
Notice of Hearing
- Hearing regarding Fuel Charges Adjustment for the
Month of January 2017 for Ex-WAPDA
Distribution Companies. |
|
CPPAG
Energy Purchase Data for the Month of January 2017 |
||
25-02-2017 |
Notice of Suo Moto Proceedings - Upfront
Generation Tariff for Solid Waste to Energy
Power Projects |
|
25-02-2017 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Quetta Textile Mills
Limited (QTML) |
|
Quetta Textile Mills
Limited (QTML) Application for a Modification in
the Generation Licence No. SGC/014/2002 |
||
25-02-2017 |
Notice -
Licensee Proposed Modification (LPM) in the
Distribution Licence of Quetta Textile Mills
Limited (QTML) |
|
Quetta Textile Mills
Limited (QTML) Application for a Modification in
the Distribution Licence No. 16/DL/2006 |
||
25-02-2017 |
Notice of
Admission - regarding Application of Kashmir
Power (Private) Limited for the Grant of
Generation Licence |
|
Application of
Kashmir Power (Private) Limited for the Grant of
Generation Licence |
||
25-02-2017 |
Notice of Suo Moto Proceedings - Upfront
Generation Tariff for Waste Heat Recovery System
(WHRS) Power Projects |
|
24-02-2017 |
Notice of Admission
- Application of Shaheen Renewable Energy 1
(Private) Limited (SRE-1) for the grant of
Generation Licence. |
|
Application of
Shaheen Renewable Energy 1 (Private) Limited (SRE-1)
for the grant of Generation Licence. |
||
23-02-2017 |
Notice of Suo Moto Proceedings - Upfront
Generation Tariff for Biomass Power Projects. |
|
23-02-2017 |
Notice of Admission - Generation Licence
Application of Catalyst Energy (Private) Limited
(CEPL) |
|
Application for a
Generation Licence of Catalyst Energy Private
Limited for its 100 MW Solar Power Project to be
Located in the Quaid-e-Azam Solar Park, Chistian |
||
18-02-2017 |
Notice of Admission
- Generation Licence Application of Mirpurkhas Energy
Limited (MEL) |
|
Application for Generation Licence of
Mirpurkhas Energy Limited |
||
16-02-2017 |
Notice for Seeking
Comments - of Stakeholders in the Matter of
Proposed Amendments in the Net Metering Regulations |
|
Comments/observations
from POF Wah |
||
Comments/observations
from Renewable Energy Association of Pakistan (REAP) |
||
15-02-2017 |
Modifiation - I In the
Geneation Licence of - Zephyr Power
(Private) Limite |
|
15-02-2017 |
Request
of Ghazi Power Limited For Cancellation
of its Generation Licence (No. SGC/018/2004, dated
January 27, 2004) |
|
11-02-2017 |
Addendum to Notice - of Licensee
Proposed Modification in the Generation Licence of
ICI Pakistan Powergen Limited. |
|
10-02-2017 |
Determination of the Authority in
the matter of Tariff Petition filed by Sindh
Transmission and Dispatch Company (Private) Ltd.
(ST&DCPL) for the Determination of Tariff for
132 kV Transmission Line Project |
|
09-02-2017 |
Notice of Admission
- Generation Licence Application of
Mandi Baha ud Din Energy Ltd. (MBDEL) |
|
Generation Licence
Application of
Mandi Baha ud Din Energy Ltd. (MBDEL) |
||
09-02-2017 |
Notice about
Licensee Proposed Modification (LPM) in the
Generation Licence of SAR Energy (Private)
Limited (SEPL) |
|
Modification in
Generation License for 1.3 MW Machai Canal Hydro
Power Project by Sar Energy (Pvt.) Limited |
||
03-02-2017 |
PERFORMANCE EVALUATION REPORT
Of All Distribution Companies (IESCO, PESCO, GEPCO,
FESCO, LESCO, MEPCO, QESCO, SEPCO, HESCO,
K-Electric) For the year 2014-15
Along with comparison of 2010-11, 2011-12, 2012- 13
& 2013-14 |
|
02-02-2017 |
Modification - III in
the Distribution Licence of Sapphire Power
Generation Limited |
|
02-02-2017 |
Modification - III in
the Generation Licence of Sapphire Power
Generation Limited |
|
02-02-2017 |
Modification - I in the
Generation Licence of Triconboston Consulting
Corporation (Private) Limited for its Wind Power
Project - C |
|
02-02-2017 |
Modification - I in the
Generation Licence of Triconboston Consulting
Corporation (Private) Limited for its Wind Power
Project - B |
|
02-02-2017 |
Modification - I in the
Generation Licence of Triconboston Consulting
Corporation (Private) Limited for its Wind Power
Project - A |
|
02-02-2017 |
Modification - I in the
Generation Licence of Habibullah Coastal Power
Company (Private) Limited. |
|
01-02-2017 |
Decision
of the Authority in the matter of Fuel Charges
Adjustment for the Month of December 2016 for
XWDISCOs along with Notification Thereof |
|
01-02-2017 |
Grant of Generation Licence No. WPGL/40/2017
- Licence Application No. LAG-346 - Din Energy
Limited (DEL) |
|
01-02-2017 |
Grant of Generation Licence No. WPGL/39/2017
- Licence Application No. LAG-347 - Zulaikha
Energy (Private) Limited (ZEPL) |
|
01-02-2017 |
Grant of Generation Licence No. WPGL/38/2017
- Licence Application No. LAG-352 - Cacho Wind
Energy (Private) Limited (CWEPL) |
|
01-02-2017 |
Generation Licence No. IGSPL/75/2017 - Licence
Application No. LAG-361 - ThalNova Power Thar
(Pvt.) Limited (TNPTPLI) |
|
27-01-2017 |
Notice of Admission -
Generation Licence Application of Bahawalpur
Energy Limited (NWEL) |
|
Generation Licence
Application of Bahawalpur Energy Limited (NWEL) |
||
27-01-2017 |
Determination of New Tariff for Wind Power
Generation Projects. |
|
20-01-2017 |
Notice of Hearing
- Hearing Regarding Fuel Charges Adjustment for the
Month of December 2016 for Ex-WAPDA Distribution
Companies |
|
CPPAG Energy
Purchase Data for the Month of December 2016 |
||
19-01-2017 |
Notice of Hearing
- Hearing in the Matter of Provisional Monthly Fuel
Charges Adjustment (FCA) requests of K-Electric
Limited for the Months of December, 2016 |
|
K-Electric Limited
Provisional Monthly Fuel Cost Adjustment (FCA) due
to Variation in Fuel and Power Purchase Price for
the Month of December 2016 |
||
19-01-2017 |
Notice of Admission
- Generation Licence Application of Ittefaq Power Limited (IPL) |
|
Generation Licence
Application of Ittefaq Power Limited (IPL) |
||
18-01-2017 |
Notice -
Licensee Proposed Modification (LPM) in the
Distribution Licence of Monnoo Energy Limited
(MEL) |
|
Application for Renewal
of Distribution Licence 10/DL/2006 of Mannoo Energy Limited
(MEL) |
||
17-01-2017 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Lotte Chemical Pakistan
Limited (LCPL) Formerly Lotte Powergen (Private)
Limited |
|
License Proposed Modification (LPM)
Application- on behalf of Lotte Chemicals Pakistan
Limited (the "Company") |
||
17-01-2017 |
Executive Summary "Legal
and Regulatory measures for effective control of PCB
Management in Pakistan" |
|
Draft Terms of
Reference (TOR)
Legislation Review Development of Legal Basis and
Regulatory Measures for Effective Control of PCB
Handling in Pakistan for eliciting Comments and
Suggestions |
||
14-01-2017 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Monnoo Energy Limited (MEL) |
|
Application for Renewal
of Generation Licence SGC/010/2001 of Monnoo
Energy Limited (MEL) |
||
13-01-2017 |
Notice for Seeking
Comments: Regarding Determination of New
Tariff for Thar Coal Based Power Projects. All
the stakeholders and interested/affected persons who
desire to participate in the proceedings may file
written comments within fifteen (15) days
from the date of publication of this notice. |
|
12-01-2017 |
Notice of Admission
: Punjab Industrial Estates and Development
Management Company (PIEDMC) for Grant of
Distribution Licence for Quaid-e-Azam Apparel Park,
Sheikhupura . All Stakeholders, interested / affected persons
and general public are invited to submit their
comments in favor / or against grant of
Distribution Licence to Quaid-e-Azam Apparel Park- Sheikhupura within a period of
14 days from the
date of publication of this notice |
|
Application for power Distribution License
for Punjab Industrial Estates Development and
Management Company (PIEDMC) owned by Govt. of Punjab
at Quaid-e-Azam Apparel Park- Sheikhupura |
||
12-01-2017 |
Notice of Admission : All Stakeholders, interested / affected persons
and general public are invited to submit their
comments in favor / or against grant of
Generation Licence to RYKEL within a period of
14 days from the
date of publication of this notice |
|
Application for
New Generation Licence of M/s RYK Energy Limited |
||
09-01-2017 |
Grant of Generation
Licence No. SPGL/18/2017 issued to Shams Power
(Private) Limited (SYN.) |
|
09-01-2017 |
Modification in
Generation Licence of Zephyr Power
(Private) Limited (ZPPL) |
|
07-01-2017 |
Notice :
Licensee proposed modification (LPM) in the
Generation Licence of Hartford Alternative Energy
(Pvt) Limited (HAEPL). All Stakeholders, interested / affected persons
and general public are invited to submit their
comments within a period of 14 days from the
date of publication of this notice |
|
Licensee Proposed
Modification (LPM) in the Generation Licence of
Hartford Alternative Energy (Pvt) Limited (HAEPL) |
||
05-01-2017 |
Determination of
the Authority in the matter of Application tiled by
Central Power Purchasing Agency (Guarantee)
Limited (CPPA-G) for Determination of its Market
Operator Fee for the Period June 2015, the FY
2015-16 and FY 2016-17 |
|
05-01-2017 |
Grant of Generation
Licence No. WPGL/37/2017 Licence Application No.
LAG-354 Western Energy (Private) Limited (WEPL) |
|
05-01-2017 |
Generation Licence
No. IGSPL/74/2017 Licence Application No. LAG-338
Thar Coal Block-I Power Generation Company (Pvt.)
Limited (TCHPGCPL) |
|
05-01-2017 |
Generation Licence
No. IGSPL/73/2017 Licence Application No. LAG-332
Trident Power JB (Private) Limited
(TRIBPL) |
|
03-01-2017 |
Decision of the Authority in the
matter of Fuel Charges Adjustment for the Month
of November 2016 for K-Electric Limited and
Notification (S.R.O.01(I)/2017 dated 02.01.2017)
Thereof |
|
03-01-2017 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of November 2016 for
XWDISCOs along with Notification Thereof |
30-12-2016 |
Decision of the
Authority in the matter of Upfront Tariff for
Existing Sugar Mills |
|
30-12-2016 |
Notice of Admission
: Punjab Industrial Estates and Development
Management Company (PIEDMC) for grant of
Distribution Licence for Rahim Yar Khan Industrial Estate. All Stakeholders, interested / affected persons
and general public are invited to submit their
comments within a period of 14 days from the
date of publication of this notice |
|
Application for Power Distribution
Licence for Punjab Industrial Estate Development
and Management Company (PIEDMC) owned by Govt. of
Punjab at Rahim Yar Khan Industrial Estate |
||
30-12-2016 |
Notice of Admission
: Punjab Industrial Estates and Development
Management Company (PIEDMC) for grant of
Distribution Licence for Bhalwal Industrial Estate.
All Stakeholders, interested / affected persons
and general public are invited to submit their
comments within a period of 14 days from the
date of publication of this notice |
|
Application for
Power Distribution Licence for Punjab Industrial
Estate Development and Management Company (PIEDMC)
owned by Govt. of Punjab at Bhalwal Industrial
Estate |
||
29-12-2016 |
Notice for Seeking
Comments: Regarding request of K-Electric
Limited (KEL) for approval of change in indirect
Shareholding and control within 10 days from
the date of this publication |
|
Application for Approval of Change in
indirect Shareholding and control in K-Electric
Limited under Rule 14 of Licensing (Generation)
Rules 2000 and Rule 13 of Licensing (Distribution)
Rules, 1999. |
||
Additional Documents
in support of Application
K-Electric Limited |
||
29-12-2016 |
Decision of the
Authority in the matter of Request by Port
Qasim Electric Power Company (Private) Limited (PQEPCPL)
for Confirmation of the EPC Contract and the
Management Consulting (Supervision) Services
Contract for Coal Unloading Jetty Channel for Port
Qasim Electric Power Company |
|
27-12-2016 |
Grant
of Distribution Licence No. 23/DL/2016 Licence
Application No. LAD-38 Defence Housing Authority
Lahore Phase-XII (EME Sector) |
|
21-12-2016 |
Notice of
Admission:- Generation Licence Application of
Hunza Power (Private) Limited (HPPL) Comments required
within 14 days from the date of this publication |
|
Application for
a Generation License for Hunza Power (Private)
Limited (HPPL) |
||
21-12-2016 |
Notice of Hearing : Regarding Monthly Fuel Charges Adjustment (FCA) for the Month of
November 2016 for the month of November 2016 for
Ex-WAPDA Distribution Companies |
|
CPPAG
Energy Purchase Data for the Month of November 2016 |
||
20-12-2016 |
Grant of Generation
Licence No. SGC/119/2016 Licence Application No.
LAC-365 Maple Leaf Power Limited (MLPL) |
|
19-12-2016 |
Notice of Hearing : in the matter of
Provisional Monthly Fuel Charges Adjustment (FCA)
request of K-Electric Limited for the Month of
November 2016. |
|
Petition Filed
by K-Electric for
Provisional Monthly Fuel Cost Adjustment (FCA) due
to Variation in Fuel and Power Purchase Price for
the Month of November 2016 |
||
16-12-2016 |
Draft:
Amendments in Regulation 3(5) (h) of the NEPRA
Licensing (Application and Modification Procedure)
Regulations, 1999, for soliciting public comments
within 7 days. |
|
09-12-2016 |
Grant of
Generation Licence No. SPGL/17/2016 Licence
Application No. LAG-339 Ourson Pakistan Limited
(OSPL) |
|
05-12-2016 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of October 2016
for K-Electric Limited and Notification
(S.R.O.1139(1)/2016 dated 02.12.2016) Thereof |
|
03-12-2016 |
Notice of
Admission:- Generation Licence Application of
Nishat Energy Limited (NEL) Comments required
within 30 days |
|
Application for
a Generation License for Nishat Energy Limited |
||
03-12-2016 |
Notice :- Draft
NEPRA Guidelines for determination of revenue
requirement & use of System Charges (UoSC) for
Transmission Licensee |
|
Draft NEPRA
Guidelines for determination of Revenue
Requirement & Use of System Charges |
||
03-12-2016 |
Notice:- For
Soliciting comments and feedback on the concept note
on Proposed Competitive Bidding regime for
Generation and Transmission Tariff in Pakistan |
|
Draft
Proposed
Competitive Bidding Regime
for Generation and Transmission Tariffs in Pakistan
for eliciting Comments within 30 days |
||
02-12-2016 |
Decision of the Authority in the matter of Fuel
Charges Adjustment for the Month of September
2016 for K-Electric Limited and
Notification (S.R.O.1129(1)/2016 dated 01.12.2016)
Thereof |
|
01-12-2016 |
Draft NEPRA
Guidelines for Selection of EPC contractors |
|
01-12-2016 |
Draft NEPRA
Guidelines for determination of Revenue
Requirement & Use of System Charges |
|
30-11-2016 |
Decision
of the Authority in the matter of Fuel Charges
Adjustment for the Month of October 2016 for
XWDISCOs along with Notification Thereof |
|
26-11-2016 |
Public Notice - Determination of Rate of
Return for Power Sector |
|
Concept Paper - Determination of Rate of Return
for Power Sector |
||
25-11-2016 |
Draft
Proposed
Competitive Bidding Regime
for Generation and Transmission Tariffs in Pakistan
for eliciting Comments within 30 days |
|
24-11-2016 |
Decision
of the Authority in the matter of Motion for Leave
for Review filed by Private Power and
Infrastructure Board (PPIB) against the Tariff
Determination of the Authority for
+/- 660 KV, 4000 MW HVDC Matiari-Lahore
Transmission Line Project |
|
23-11-2016 |
Decision
of the Authority in the matter of Motion for Leave
for Review filed by M/s. Punjab Power Development
Company Ltd. for its Marala Hydropower Project
against Tariff Determination Dated June 30, 2015 |
|
23-11-2016 |
Hearing in the
matter of Provisional Monthly Fuel Charges
Adjustment (FCA) Request of K-Electric Limited
for the Month of October, 2016 |
|
K-Electric
Provisional Monthly Fuel Cost Adjustment (FCA) due
to Variation in Fuel and Power Purchase Price for
the Month of October 2016 |
||
21-11-2016 |
Issues for the Hearing to be held on 23.11.2016 in
respect of Court Cases 6 x 100 MW Solar Power
Project of M/s. Zonergy Company Ltd. |
|
19-11-2016 |
Hearing regarding Fuel Charges Adjustment for
the Month of October 2016 for Ex-WAPDA
Distribution Companies. |
|
CPPAG
Energy Purchase Data for the Month of
October 2016 |
||
15-11-2016 |
Rescheduling of the
Hearing dated 15-11-2016
- Considering Request of Central Power Purchasing
Agency Guarantee Limited (CPPAG) |
|
14-11-2016 |
Decision
of the Authority with respect to Energy Purchase
Agreements submitted by M/s. Fazal Paper
Mills (Pvt.) Ltd. (FPML) |
|
12-11-2016 |
Notice of Admission
- Generation Licence Application of Meridian
Energy (Private) Limited (MEPL) |
|
Generation Licence
Application of Meridian Energy (Private) Limited
(MEPL) |
||
12-11-2016 |
Notice of Admission
- Generation Licence Application of HNDS Energy
(Private) Limited (HNDS) |
|
Generation Licence
Application of HNDS Energy (Private) Limited (HNDS) |
||
12-11-2016 |
Notice of Admission
- Generation Licence Application of Gugera Hydro
Power Company (Pvt) Limtied (GHPCL) |
|
Generation Licence
Application of Gugera Hydro Power Company (Pvt)
Limtied (GHPCL) |
||
11-11-2016 |
||
NEPRA Visit Report
of National Transmission & Despatch Company Limited
(NTDC) |
||
11-11-2016 |
||
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Deharki Sugar Mills
(Private) Limited (DSMPL) |
||
Licensee Proposed
Modification (LPM) in the Generation Licence of
Deharki Sugar Mills (Private) Limited (DSMPL) |
||
11-11-2016 |
||
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of JDW Sugar Mills Limited (JDWSML) |
||
Licensee Proposed
Modification (LPM) in the
Generation Licence of JDW Sugar Mills Limited (JDWSML) |
||
11-11-2016 |
||
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Siddiqsons Energy Limited (SEL) |
||
Licensee Proposed
Modification (LPM) in the
Generation Licence of Siddiqsons Energy Limited (SEL) |
||
10-11-2016 |
||
Grant
of Generation Licence No. IGSPL/72/2016 -
Licence Application No. LAG-355 - Shahtaj Sugar
Mills Limited (SSML) |
||
10-11-2016 |
||
Grant
of Generation Licence No. WPG1./36/2016 -
Licence Application No. LAG-348 - Norinco
International Thatta Power (Private) Limited (NITPPL) |
||
09-11-2016 |
||
Hearing in the Matter of Provisional Monthly
Fuel Charges Adjustment (FCA) Request of
K-Electric Limited for the Month of September,
2016 |
||
K-Electric
Revised Provisional Monthly Fuel Cost Adjustment (FCA)
due to Variation in Fuel and Power Purchase Price
for the Month of September 2016 |
||
06-11-2016 |
Licensee Proposed
Modification (LPM) in the Generation Licence of Triconboston
Consulting Corporation (Private) Limited (TBCCPL) for its Wind
Power Project (PLant -C) |
|
TBCCPL
Application for Modification of the Generation
Licence (PLant
-C) |
||
05-11-2016 |
Notice of Admission
- Generation Licence Application of Helios Power (Private)
Limited (HPPL) |
|
Generation Licence Application of Helios Power
(Private) Limited (HPPL) |
||
05-11-2016 |
Addendum to the Notice of
Hearing Published on 29-10-2016 |
|
05-11-2016 |
Licensee Proposed
Modification (LPM) in the Generation Licence of Triconboston
Consulting Corporation (Private) Limited (TBCCPL) for its Wind
Power Project (PLant -B) |
|
TBCCPL
Application for Modification of the Generation
Licence (PLant
-B) |
||
05-11-2016 |
Licensee Proposed
Modification (LPM) in the Generation Licence of Triconboston
Consulting Corporation (Private) Limited (TBCCPL) for its Wind
Power Project (PLant -A) |
|
TBCCPL
Application for Modification of the Generation
Licence (PLant
-A) |
||
02-11-2016 |
Comments of Interveners
regarding MYT petition of K-Electric for the Period commencing from
July 01, 2016. |
|
Comments
of Commentators regarding MYT petition of K-Electric
for the Period commencing from July 01, 2016. |
||
01-11-2016 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the
Month of September 2016 for XWDISCOs along with Notification
Thereof |
|
01-11-2016 |
Modification-I
- in the Generation Licence of Chiniot Power
Limited |
|
31-10-2016 |
Corrigendum - Decision
of the Authority in the matter of Adjustment of Upfront Tariff for
New Bagasse Based Co-generation Projects dated July 7, 2015 |
|
30-10-2016 |
Situation Vacant
- Assistant Legal Advisor |
|
29-10-2016 |
Notice of Hearing
- In light and compliance of direction of the Islamabad High Court
Islamabad in Judgment passed in writ Petition Nos. 4178 of 2015 and
4179 of 2015 and through order dated 24/08/2016 passed in Writ
Petition No. 2840 of 2016. |
|
29-10-2016 |
Notice to Submit
Comments Regarding Public Hearing in the Matter
of Authority Proposed Modification (APM) Proceeding
with respect to Generation Licence of Northern
Power Generation Company Limited (NPGCL/GENCO-III) |
|
29-10-2016 |
Notice to Submit Comments
Regarding Public Hearing in the Matter of Authority Proposed
Modification (APM) Proceeding with respect to Generation Licence of
Northern Power Generation Company Limited (NPGCL/GENCO-III) |
|
27-10-2016 |
Decision of the Authority in the
matter of Motion for Leave for Review filed by
M/s. K-Electric Limited against the Decision of
the Authority dated March 25, 2016 issued under
Section 28 and 29 of the NEPRA Act |
|
26-10-2016 |
Notice to Submit
Comments in the matter of Authority Proposed Modification in the
Distribution Licence of Lahore Electric Supply Company Limited (LESCO) |
|
26-10-2016 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of ICI Pakistan
Powergen Limited (ICI) |
|
ICI Pakistan
Powergen Limited
application for
modification in Generation License |
||
21-10-2016 |
Grant of Generation
Licence No. IGSPL/71/2016 - Licce Application No. LAG-344 -
Chanar Energy Limited (CEL) |
|
21-10-2016 |
Notice to Submit Comments in the
Matter of Authority Proposed Modification in the Distribution
Licence of Lahore Electric Power Supply Company (LESCO) |
|
21-10-2016 |
Notice: Licensee Proposed Modification
(LPM) in the Generation Licence of Lucky Electric Power
Company Limited (LEPCL) |
|
License Proposed Modification in the
Generation License Application - on behalf of Lucky Electric Power
Company Limited |
||
19-10-2016 |
Hearing regarding Fuel
Charges Adjustment for the Month of September 2016 for Ex-WAPDA
Distribution Companies |
|
CPPAGL Energy Purchase Data for
the Month of September 2016 |
||
19-10-2016 |
||
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Nothern Power
Generation Company Limited (NPGCL) |
||
Application for Licensee Proposed
Modification from Northern Power Generation Company Limited GENCO-III |
||
14-10-2016 |
Notice of Admission - Generation
Licence Application of Maple Leaf Power Company (MLPL) |
|
Generation Licence Application of
Maple Leaf Power Company (MLPL) |
||
14-10-2016 |
Notice of Admission - Generation
Licence Application of Jauharabad Sugar Mills Limited (JSML) |
|
Generation Licence Application of
Jauharabad Sugar Mills Limited (JSML) |
||
10-10-2016 |
Addendum to the Notice of Admission
Pertaining to the Generation Licence Application of Thalnova Power
Thar (Private) Limited |
|
07-10-2016 |
Motion for leave for review pursuant to
Rule 16(6) of NEPRA Tariff (Standards and Procedure) Rules, 1998 ,
NEPRA (Review Procedure) Regulation, 2009 submitted by Private Power
Infrastructure Board (PPIB). |
|
07-10-2016 |
Hearing : in the matter of
provisional Monthly Fuel Charges Adjustment (FCA) requests of
K-Electric for the month of July 2016 and August, 2016 |
|
Petition filed
by K-Electric Limited for Monthly Fuel
Charges Adjustment (FCA) for the month August,
2016 |
||
Petition filed
by K-Electric Limited for Monthly Fuel
Charges Adjustment (FCA) for the month July,
2016 |
||
04-10-2016 |
Decision of the Authority in the matter
of Fuel Charges Adjustment for the Month of August 2016
for XWDISCOs along with Notification Thereof |
|
04-10-2016 |
Notice of Admission
: Generation Licence Application of ET Energy
Fateh Jang (Pvt) Ltd |
|
Application :
Generation Licence Application of ET Energy Fateh
Jang (Pvt) Ltd |
||
04-10-2016 |
Notice of Admission
: Generation Licence Application of Lake City Management (Pvt)
Ltd |
|
Application :
Generation Licence Application of Lake City
Management (Pvt) Ltd |
||
04-10-2016 |
Notice of Admission
: Generation Licence Application of Thar Energy Ltd |
|
Application :
Generation Licence Application of Thar
Energy Ltd |
||
03-10-2016 |
Decision of the Authority in the matter
of Motion for Leave for Review filed by K-Electric Ltd.
against Decision of the Authority in the matter of Fuel Charges
Adjustment (FCA) for the Month of May 2016 and Notification (S.R.O.
927 (1)/2016 dated 30.09.2016) Thereof |
|
29-09-2016 |
Generation License :
1275.50 MW National Power Parks Management Company (Pvt.)
Limited-Balloki |
|
29-09-2016 |
Generation License :
1276.858
MW
National Power Parks Management Company (Pvt.) Limited-HBS |
|
27-09-2016 |
K-Electric Multi Year Tariff Hearing
Issues Presentation |
|
27-09-2016 |
Notice regarding Licensee Proposed
Modification (LPM) in the Generation Licence of Jamshoro
Power Company Limited |
|
Modification of Generation (GL /
01 / 2002) JAMSHORO POWER COMPANY LIMITED (LPM) |
||
26-09-2016 |
Notice of Hearing -
Fuel Price Adjustment for the Month of August 2016
for XWDISCOs |
|
CPPA-G Energy Purchase Data for the month of
August 2016 |
||
23-09-2016 |
Decision of the
Authority regarding Suo Moto Review Proceedings in
the Fuel Price Adjustment Mechanism Determined in
Upfront Coal Tariff |
|
23-09-2016 |
Notice of Admission
: Generation Licence Application of Kolachi
Portgen (Private) Limited (KPPL) |
|
Application :
Generation Licence Application of Kolachi Portgen |
||
23-09-2016 |
Notice of Admission
: Generation Licence Application of Thalnova
Power Thar (Pvt:) Ltd |
|
Application :
Generation Licence Application of Thalnova Power
Thar (Pv) Ltd |
||
20-09-2016 |
Evaluation Report :
Printing of NEPRA Annual & State of Industry Reports
2016. NEPRA Tender No 09/2016 |
|
Printing of Annual and
SOI Reports Marks Sheet |
||
19-09-2016 |
Decision
of the Authority regarding Cessation of Upfront
Tariff on Imported/Local Coal |
|
08-09-2016 |
Generation Licence No. IGSPL/68/2016 - Licence
Application No. LAG-314 - China Power Hub
Generation Company (Private) Limited (CPHGCPL) |
|
08-09-2016 |
Re-Scheduling of
Hearing - in the matter of Petition filed by
National Transmission & Despatch Company Limited (NTDCL)
for Determination of its Transfer/ Wheeling Charges
for the year 2015-16 and FY 2016-17 |
|
Filing of Tariff
Petition for Determination of Transfer/ Wheeling
Charges for the Year 2015-16 & 2016-17 - National
Transmission and Despatch Co. Ltd. |
||
Issues in the matter of petition filed by
National Transmission & Despatch Company Limited (NTDCL)
for determination of Transfer/ Wheeling Charges
pertaining to FY 2015-16 and FY 2016-17. |
||
05-09-2016 |
Decision of the Authority in the
matter of Fuel Charges Adjustment for the Month of
June 2016 for K-Electric Limited and
Notification (S.R.O. 829(1)/2016 dated 02.09.2016)
Thereof |
|
03-09-2016 |
Notice of Admission/ Hearing -
Petition filed by Central Power Purchase Agency (Guarantee)
Limited (CPPA-G) for Determination of its Market Operation Fee
for June 2015, the FY 2015-16 and FY 2016-17 |
|
Petition
for the Determination of Market Operation Fee for June 2015, for the
FY 2015-16 & FY 2016-17 |
||
Framing of
Issues in the matter of petition filed by Central Power
Purchasing Agency Guarantee Limited (CPPA-G) for determination of
Market Operation Fee for June 2015, the FY 2015-16 and FY 2016-17. |
||
03-09-2016 |
Notice of Hearing-
Multiyear Tariff Petition filed by K-Electric Limited
(K-Electric) for Determination of Tariff for the Period
Commencing from July 01, 2016 to June 30, 2026 |
|
Issues for Hearing
Regarding Integrated Multiyear Tariff (I-MYT) Petition Submitted by
K-Electric Limited for the Period from July 01, 2016 to June
30, 2026 |
||
02-09-2016 |
Notice - Licensee Proposed
Modification (LPM) in the distribution Licence of Sapphire Power
Generation Limited (SPGL) |
|
Sapphire Power Generation Limited
("The Company") Application for Modification of the Distribution
License. |
||
02-09-2016 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Sapphire Power
Generation Limited (SPGL) |
|
Sapphire Power Generation Limited (-The
Company") Application for Modification of the Generation License. |
||
02-09-2016 |
Modification - I in the
Generation Licence of Master
Wind Energy Limited |
|
02-09-2016 |
Modification - I in the
Generation Licence of Jhimpir
Power (Private) Limited |
|
01-09-2016 |
Postponement of Hearing in
the matter of Petition filed by National Transmission and
Despatch Company Limited (NTDCL) for Determination of its
Transfer/ Wheeling Charges for the FY 2015-16 and FY 2016-17 |
|
29-08-2016 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the
Month of July 2016 for XWDISCOs along with Notification
Thereof |
|
26-08-2016 |
Notice of Admission
- Generation Licence Application of Zhenfa
Pakistan New Energy Company (Private) Limited (ZPNECL) |
|
Generation Licence
Application of Zhenfa Pakistan New Energy Company
(Private) Limited (ZPNECL) |
||
26-08-2016 |
Notice of Admission - Generation
Licence Application of Western Energy (Pvt.) Limited (WEPL) |
|
Generation Licence Application of
Western Energy (Pvt.) Limited (WEPL) |
||
26-08-2016 |
Notice of Admission
- Generation Licence Application of Trans
Atlantic Energy (Private) Limited (TAEPL) |
|
Generation Licence
Application of Trans Atlantic Energy (Private)
Limited (TAEPL) |
||
26-08-2016 |
Notice of Admission - Generation
Licence Application of Shahtaj Sugar Mills Limited (STSML) |
|
Generation Licence Application of
Shahtaj Sugar Mills Limited (STSML) |
||
26-08-2016 |
Notice of Admission
- Generation Licence Application of Siachen
Energy Limited (SEL) |
|
Generation Licence
Application of Siachen Energy Limited (SEL) |
||
26-08-2016 |
Notice of Admission - Generation
Licence Application of Premier Industrial Chemical MFG Co (Pvt.)
Limited (PICMPL) |
|
Generation Licence Application of
Premier Industrial Chemical MFG Co (Pvt.) Limited (PICMPL) |
||
26-08-2016 |
Application of China
Power Hub Generation Company limited for adjustment of tariff for
optimal Jetty design for its 2x660 MW Imported Coal Project. |
|
Scope of Work |
||
Transshipment Feasibility Report |
||
Jetty Procurement & Supply Contract |
||
Jetty Procurement & Construction Contract |
||
25-08-2016 |
Hearing in the
Matter of Quarterly Adjustment in Tariff for the Quarter ended June,
2016 of K-Electric Limited |
|
K-Electric Limited
Application for Quarterly Adjustment in Tariff for the
Quarter ended June, 2016 |
||
24-08-2016 |
Evaluation Report of
NEPRA Tender No. 09/2016 for
designing & printing of Annual Report 2015-16 and State of Industry
Report 2016 |
|
23-08-2016 |
Notice of Admission - Generation Licence
Application of Datang Pakistan Karachi Power
Generation (Pvt.) Limited (DPKPG) |
|
Generation Licence Application of Datang Pakistan
Karachi Power Generation (Pvt.) Limited (DPKPG) |
||
20-08-2016 |
Hearing in the
Matter of Power Acquisition Request (PAR) filed by
K-Electric under NEPRA Interim Power
Procurement (Procedure & Standards) Regulations 2005
for Purchase of 4.5 MW Power from Engro Polymer &
Chemicals Limited. |
|
18-08-2016 |
Determination of the Authority in the matter of
Tariff Petition filed by Private Power and
Infrastructure Board (PPIB) for +/- 660 KV, 4000
MW HVDC Transmission Line Project |
|
18-08-2016 |
Hearing regarding
fuel Charges Adjustment for the month of July 2016 for Ex-WAPDA
Distribution Companies |
|
CPPAGL Energy Purchase Data for
the Month of July 2016 |
||
17-08-2016 |
Re-scheduling of
Hearing in the matter of Petition filed by
National Transmission & Despatch Company Limited (NTDCL)
for Determination of its Transfer/ Wheeling Charges
for the Year 2015-16 and FY 2016-17 |
|
Filing of Tariff
Petition for Determination of Transfer/ Wheeling
Charges for the Year 2015-16 & 2016-17 - National
Transmission and Despatch Co. Ltd. |
||
Issues in the matter of petition filed by
National Transmission & Despatch Company Limited (NTDCL)
for determination of Transfer/ Wheeling Charges
pertaining to FY 2015-16 and FY 2016-17. |
||
13-08-2016 |
Notice of Admission
- Generation Licence Application of
Iran-Pak Wind Power (Private) Limited (IPWPPL) |
|
Generation Licence
Application of Iran-Pak Wind Power (Private)
Limited (IPWPPL) |
||
13-08-2016 |
Notice of Admission
- Application for Grant of Generation
Licence of
Benazirabad Solar Power (SMC-PVT) Limited (BSPSPL) |
|
Generation Licence
Application of
Benazirabad Solar Power
(SMC-PVT) Limited (BSPSPL) |
||
11-08-2016 |
Decision of the Authority in the matter of Motion for Leave for Review
against the Decision of the Authority regarding Reconsideration
Request filed by Government of Pakistan in the matter of
Upfront Tariff for Coal Power Projects |
|
11-08-2016 |
Modification-II
in the Generation Licence of
Hawa Energy (Private)
Limited |
|
11-08-2016 |
Approval
of National Electric Power Regulatory Authority in
the matter of Application of Datang Pakistan
Karachi Power Generation (Pvt.) Limited (DPKPG)
for Unconditional Acceptance of Upfront Coal
Tariff for 2 x 350 MW Coal Power Plant at Port Qasim,
Sindh |
|
11-08-2016 |
Notice -
Licensee Proposed Modification (LPM) in the
Generation Licence of Zephyr Power (Pvt.) Limited
(ZPPL) |
|
License Proposed Modification (LPM) of the
Generation License Application of Zephyr Power
(Pvt.) Limited |
||
10-08-2016 |
Notice of Admission / Hearing - Petition filed
by National Transmission & Despatch Company
Limited (NTDCL) for Determination of its
Transfer/ Wheeling Charges for the year 2015-16 and
FY 2016-17 |
|
Filing of Tariff
Petition for Determination of Transfer/ Wheeling
Charges for the Year 2015-16 & 2016-17 - National
Transmission and Despatch Co. Ltd. |
||
09-08-2016 |
Determination of the Authority in the matter of
Tariff Petition filed by National Power Parks
Management Company (Private) Limited for
Determination of Generation Tariff for its 1230.54
MW Power Project on RLNG/HSD at Haveli Bahadar
Shah |
|
09-08-2016 |
Determination of the Authority in the matter of
Tariff Petition filed by National Power Parks
Management Company (Private) Limited for
Determination of Generation Tariff for its 1223.106
MW Power Project on RLNG/HSD at Balloki |
|
09-08-2016 |
Notice of Admission - Generation Licence
Application of Pakhtunkhwa Energy Development
Organization |
|
PEDO
Application for Generation License - 36.6 MW
Daral Khawr Hydropower Project, District Swat,
Khyber Pakhtunkhwa. |
||
09-08-2016 |
Motion for Leave for Review filed by
Fatima Energy Limited against the Authority Decision dated
17th June 2016 FEL
Ground |
|
02-08-2016 |
Determination of the Authority in
the matter of Tariff Petition filed by Punjab Power
Development Company Limited for its Chianwali
Hydropower Project |
|
05-08-2016 |
Decision
of the Authority in the matter of Fuel Charges
Adjustment for the Month of May 2016 for
K-Electric Limited and Notification (S.R.O.
722(1)12016 dated 05.08.2016) Thereof |
|
05-08-2016 |
Notice of Hearing - Hearing in the matter of
Monthly Fuel Charges Adjustment (FCA) Request of
K-Electric Limited for the Month of June,
2016 |
|
K-Electric Limited
revised Monthly Fuel Cost Adjustment (FCA)
due to Variation in Fuel and Power Purchase Price
for the Month of June 2016 |
||
02-08-2016 |
Notice
of Admission - Application of Lake City
Management (Private) Limited (LCMPL) for the
grant of Distribution Licence. |
|
Application of Lake City
Management (Private) Limited (LCMPL) for the
grant of Distribution Licence. |
||
02-08-2016 |
Notice
of Admission - Generation Licence Application of
Norinco International Thatta Power (Private) Limited (NITPPL) |
|
Application for a Generation License
Norinco International Thatta Power (Private)
Limited 50MW |
||
02-08-2016 |
Determination of the Authority in
the matter of Tariff Petition filed by Punjab Power
Development Company Limited for its Chianwali
Hydropower Project |
|
01-08-2016 |
Decision
of the Authority in the matter of Fuel Charges
Adjustment for the Month of June 2016 for
XWDISCOs alone with Notification Thereof |
|
23-07-2016 |
||
Hearing
regarding Fuel Charges Adjustment for the
Month of June 2016 for EX-WAPDA Distribution
Companies |
||
CPPAG Energy
Purchase data for the month of June 2016 |
||
15-07-2016 |
INVITATION TO BID - NEPRA Tender No. 09/2016 for
designing & printing of Annual Report 2015-16 and
State of Industry Report 2016 |
|
Terms And Conditions
For Designing & Printing Of Nepra Reports |
||
13-07-2016 |
Notice of Admission
- Generation Licence Application of Zulaikha
Energy (Private) Limited (ZEPL) |
|
Generation Licence Application of Zulaikha
Energy (Private) Limited (ZEPL) |
||
13-07-2016 |
Notice of Admission
- Generation Licence Application of Din Energy
Limited (DEL) |
|
Generation Licence Application of Din Energy
Limited (DEL) |
||
01-07-2016 |
Decision of the Authority in the
matter of Fuel Charges Adjustment for the
Month of April 2016 for K-Electric Limited
and Notification (S.R.O. 583(1)/2016 dated
30.06.2016) Thereof |
|
30-06-2016 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of May 2016 for
XWDISCOs along with Notification Thereof |
|
29-06-2016 |
1. Generation Licence
of NPGCL (as modified on 31-10-2014) |
|
2. APM-communicated to
NPGCL regarding SPS Faisalabad |
||
3. Response of NPGCL on
the APM for Exclusion SPS & GTPS |
||
4. comments of
stakeholders on APM of NPGCL for excluding SPS
Faisalabad |
||
5. Notice of Public
Hearing in the matter of APM NPGCL for excluding SPS
Faisalabad |
||
6. Issues for-Public
Hearing |
||
29-06-2016 |
1. Generation Licence
of NPGCL (as modified on 31-10-2014) |
|
2. APM-communicated to
NPGCL regarding GTPS Faisalabad |
||
3. Response of NPGCL on
the APM for Exclusion SPS & GTPS |
||
4. Comments of
stakeholders on APM of NPGCL regarding GTPS
Faisalabad |
||
5. Notice of Hearing
regarding APM of NPGCL for excluding GTPS Faisalabad |
||
6. Issues for-Public
Hearing |
||
29-06-2016 |
1.Comments of
Stakeholders regarding APM of CPGCL |
|
2.Communicated APM to
CPGCL |
||
3.Generation-Licence-CPGCL |
||
4.Issues for-Public
Hearing -CPGCL-TPS Guddu-vetted by LA-June 28,
2016-Final |
||
5.Notice-of-Public-Hearing-CPGCL |
||
6.Response of CPGCL on
the communicated APM |
||
28-06-2016 |
Notice of Admission
- Generation Licence Application of Chanar Energy
Limited (CEL) |
|
Generation Licence Application of Chanar Energy
Limited (CEL) |
||
28-06-2016 |
Notice of Admission
- Generation Licence Application of Artistic Wind
Power (Private) Limited (AWPPL) |
|
Generation Licence Application of Artistic Wind
Power (Private) Limited (AWPPL) |
||
28-06-2016 |
Notice of Admission
- Generation Licence Application of ACT2 Wind
(Private) Limited (AWPL) |
|
Generation Licence Application of ACT2 Wind
(Private) Limited (AWPL) |
||
28-06-2016 |
Notice of Admission
- Generation Licence Application of Lalpir Solar
Power (Private) Limited (LSPPL) |
|
Generation Licence Application of Lalpir Solar
Power (Private) Limited (LSPPL) |
||
26-06-2016 |
Hearing in the
Matter of Monthly Fuel Charges Adjustment (FCA)
Request of K-Electric Limited for the Month
of May, 2016 |
|
K-Electric Limited - Integrated Multi Year
Tariff Petition for the period commencing from
July01, 2016 to June 30, 2016 |
||
24-06-2016 |
Modification-I
in Generation Licence of Jhimpir Power (Private)
Limited (JPPL) |
|
24-06-2016 |
Notice of Admission
- Multiyear Tariff Petition Filed by K-Electric
Limited for Determination of Tariff for the
Period Commencing from July 01, 2016 to June 30,
2026 |
|
K-Electric Limited - Integrated Multi Year
Tariff Petition for the period commencing from
July01, 2016 to June 30, 2016 |
||
22-06-2016 |
Evaluation Report - Tender for Supply of
stationary items, Toner Cartridges and Printed
Materiel Tender No 07/2016 |
|
21-06-2016 |
Decision
of the Authority in the matter of Power Acquisition
Contract filed by National Transmission &
Despatch Company Ltd. for CASA-1000 Transmission
Project under NEPRA Interim Power Procurement
(Procedure & Standards) Regulations, 2005 |
|
21-06-2016 |
Determination of the Authority in the matter of
Approval of Tariff for Atlas Powergen Limited
for its 220 MW (net Capacity) Combined Cycle RLNG
based Power Plant at Sheikhupura |
|
18-06-2016 |
Addendum to the
Notice of Admission Pertaining to the
Application of Shams Power (Private) Limited (SPPL)
for the grant of Generation Licence |
|
17-06-2016 |
Determination of the Authority in the matter of
Tariff Petition filed by Fatima Energy Ltd.
for its 118.8 MW Cogen Power Plant located at
Mehmood Kot, District Muzaffargarh |
|
16-06-2016 |
Hearing
Regarding Fuel Charges Adjustment of May 2016 for
Ex-WAPDA Distribution Companies |
|
CPPAG
Energy Data For the Month of May 2016. |
||
14-06-2016 |
Evaluation Report - Urdu Translation of NEPRA
Act, Rules. Regulations and other official documents |
|
14-06-2016 |
Notice of Suo Moto Proceedings -
Development and
Determination of New Tariff for Wind Power
Generation Projects |
|
14-06-2016 |
Notice of Suo Moto Proceedings -
Development of New
Tariff for Solar PV Power Projects |
|
14-06-2016 |
Notice of Admission
- Generation Licence Application of Jan Solar
(Private) Limited (JSPL) |
|
Generation Licence Application of Jan Solar
(Private) Limited (JSPL) |
||
14-06-2016 |
Notice of Admission
- Generation Licence Application of Gul Ahmed
Electric Limited (GAEL) |
|
Generation Licence Application of Gul Ahmed
Electric Limited (GAEL) |
||
13-06-2016 |
NEPRA
(Wheeling of Electric Power) Regulations, 2016 |
|
10-06-2016 |
Application for Modification of the Generation
Licence - Habibullah Coastal Power Company (Pvt.)
Ltd. |
|
04-06-2016 |
Notice of Admission
: Generation Licence Application of OURSUN
Pakistan Limited (OSPL). All stakeholders,
interested / affected persons and general public are
invited to submit their comments with fourteen
(14) days in favour / or against the grant of
Generation Licence to OSPL. |
|
Oursun Pakistan Limited
— Application for Generation License and
upfront tariff for approximately 50MW (Gross) |
||
03-06-2016 |
Notice of Hearing - Hearing in the Matter of Monthly Fuel
Charges Adjustment (FCA) Request of K-Electric Limited
for the Month of April, 2016 |
|
Revised Monthly Fuel
Cost Adjustment (FCA) due to variation in Fuel
and Power Purchase Price for the Month of April,
2016 |
||
02-06-2016 |
Generation Licence
No. IGSPL/67/2016 Licence Application No. LAG-317
Quaid-e-Azam Thermal Power (Private) Limited (QATPPL) |
|
31-05-2016 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of April 2016
for XWDISCOs along with Notification Thereof |
|
25-05-2016 |
Decision of the
Authority in the matter of Tariff Petition filed by
WAPDA Hydroelectric for Payment of Net
Hydel Profit (NHP) and Arrears to Province of Khyber
Pakhtunkhwa |
|
23-05-2016 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of March 2016
for K-Electric Limited and Notification
(S.R.O.433(1)/2016 dated 20.05.2016) Thereof |
|
21-05-2016 |
Notice of Hearing:
Hearing regarding Fuel Charges Adjustment for the
month of April 2016 for EX-WAPDA Distribution
Companies. |
|
Energy Purchase Data
for the month of April 2016 |
||
19-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Lahore Electric Supply Company
Ltd. (LESCO) against Determination of the
Authority for the Financial Years 2015-2016 to
2019-20 Dated March 8, 2016 |
|
18-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Islamabad Electric Supply
Company Ltd. (IESCO) against Determination of
the Authority Pertaining to the Financial Years
2015-2016 to 2019-20 Dated February 29, 2016 |
|
18-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Quetta Electric Supply Company
Ltd. (QESCO) against Tariff Determination of
the Authority for Financial Year 2015-2016
dated March 25, 2016 |
|
18-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Hyderabad Electric Supply
Company Ltd. (HESCO) against Tariff
Determination of the Authority pertaining to the
Financial Year 2015-2016 Dated April 1. 2016 |
|
17-05-2016 |
Grant of Generation
Licence No. SGC/117/2016 Fazal Paper Mills
(Private) Limited (FPMPL) |
|
17-05-2016 |
Grant of Generation
Licence No. SGC/118/2016 Bismillah Energy
(Private) Limited (BEPL) |
|
17-05-2016 |
Notice of Admission:
Generation Licence Application of 2x660 MW Thar
Coal Based Power Plant at Thar Block-I
Generation Company (Pvt) Limited, Sindh |
|
Application
for Grant of Generation License of 2x660 MW Thar
Coal Based Power Plant at Thar Block-I
Generation Company (Pvt) Limited, Sindh |
||
17-05-2016 |
Notice of Admission:
Generation Licence Application of National Power
Parks Management Company (Pvt) Ltd Haveli Bahadur
Shah 1230.45 MW Combined Cycle Power Plant |
|
Application
for Grant of Generation License by National
Power Parks Management Company (Pvt) Ltd for
Haveli Bahadur Shah 1230.45 MW Combined Cycle Power
Plant |
||
17-05-2016 |
Notice of Admission:
Generation Licence Application of National Power
Parks Management Company (Pvt) Ltd Balloki 1223.01
MW Combined Cycle Power Plant |
|
Application
for Grant of Generation License by National
Power Parks Management Company (Pvt) Ltd Balloki
1223.01 MW Combined Cycle Power Plant |
||
17-05-2016 |
Notice of Admission:
Generation Licence Application AA Spinning Mills
Limited for 11.2 MW Power Plant |
|
Application
for Grant of Generation License by AA Spinning
Mills Limited for 11.2 MW Power Plant |
||
17-05-2016 |
Notice of Admission:
Generation Licence Application ICI Pakistan Ltd
for 15 MW Thermal Power Plant Sheikhupura |
|
Application
for Grant of Generation License by ICI
Pakistan Ltd for 15 MW Thermal Power Plant
Sheikhupura |
||
17-05-2016 |
Notice of Admission:
Generation Licence Application KAPCO Energy (Pvt)
Ltd for 660 MW Coal Fired Power Plant
Project at Muzafargarh. |
|
Application
for Grant of Generation License by KAPCO Energy
(Pvt) Ltd for 660 MW Coal Fired Power Plant
Project at Muzafargarh. |
||
17-05-2016 |
Notice of Admission:
Generation Licence Application Trident Power JB (Pvt)
Limited for 4.6 MW Ravi Hydro Project |
|
Application for
Grant of Generation License by Trident Power JB
(Pvt) Limited for 4.6 MW Ravi Hydro Project |
||
13-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Peshawar Electric Supply
Company Ltd. (PESCO) against Tariff
Determination for the Financial Year 2015-2016
Dated February 29, 2016 |
|
13-05-2016 |
Notice of
Admission/Hearing: Tariff Petition filed by
National Power Parks Management Company (Private)
Limited for Approval of Generation Tariff for RLNG based Power Project of 1230.54 MW (Gross)
at Haveli Bahadur Shah, District Jhang |
|
Tariff Petition
filed by National Power Parks Management Company
(Pvt) Ltd (NPPMCL) for approval of
Generation Tariff for RLNG based Power Project 1230.54 MW Combined
Cycle Plant at Haveli Bahadur Shah District
Jhang |
||
Notice of
Admission/Hearing: Tariff Petition filed by
National Power Parks Management Company (Private)
Limited for Approval of Generation Tariff for RLNG based Power Project of 1223.106 MW (Gross)
at Balloki, District Kasur |
||
Tariff Petition
filed by National Power Parks Management Company (Pvt)
Ltd (NPPMCL) for approval of Reference Generation
Tariff for 1223.106 MW Combined Cycle Plant at
Balloki District Kasur |
||
12-05-2016 |
Notice of Hearing
: in the matter of Quarterly Adjustment in
Tariff for the Quarter Ended March, 2016 for
K-Electric Limited |
|
Petition filed
by K-Electric Limited for Quarterly
Adjustment of Tariff for Quarter Ended March,
2016 |
||
11-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Gujranwala Electric Power Company
Ltd. (GEPCO) against Determination of the
Authority pertaining to the Financial Year 2015-2016
Dated February 29, 2016 |
|
11-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Multan Electric Power Company
Ltd. (MEPCO) against the Determination of the
Authority pertaining to the Financial Year 2015-2016
Dated February 29, 2016 |
|
11-05-2016 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Sukkur Electric Power Company
Ltd. (SEPCO) against Determination of the
Authority for the Financial Year 2015-2016 Dated
February 29, 2016 |
|
11-05-2016 |
Decision
of the Authority in the matter of Motion for Leave
for Review filed by Faisalabad Electric Supply
Company Ltd. (FESCO) against Determination of
the Authority for the FY 2015-16 to FY 2019-20 Dated
December 31, 2015 |
|
10-05-2016 |
Modification-I in the Generation Licence of
Safe Solar Power Private Limited |
|
Determination of the
Authority pertaining to Modification-I in the
Generation Licence of Safe Solar Power Private
Limited |
||
10-05-2016 |
Modification-I in the Generation Licence of
Grange Power Limited |
|
Determination of the
Authority pertaining to Modification-I in the
Generation Licence of Grange Power Limited |
||
09-05-2016 |
Approval
of National Electric Power Regulatory Authority in
the matter of Application of KAPCO Energy (Pvt.)
Ltd. (KAPCO) for Unconditional Acceptance of
Upfront Coal Tariff for 660 MW Coal Power Plant at
Muzaffargarh, Punjab |
|
09-05-2016 |
Decision
of the National Electric Power Regulatory Authority
in the Matter of Application for Unconditional
Acceptance of Upfront Tariff for Small Hydro Power
Projects filed by Alka Power Private Limited (APPL)
for its 1.8 MW Hydropower Project at RD 69, Jhang
Branch Canal, Punjab |
|
05-05-2016 |
Determination of the Authority in the matter of
Tariff Petition filed by Punjab Power Development Company Limited
for its Deg-outfall Hydropower Project |
|
05-05-2016 |
Notice of Hearing - Hearing in the Matter of Monthly Fuel
Charges Adjustment (FCA) Request of K-Electric Limited
for the Month of March, 2016 |
|
K-Electric Monthly Fuel Cost
Adjustment Component (Provisional) due to Variation in Fuel and
Power Purchase Price for the Month of March 2016 |
||
04-05-2016 |
Notice to Seek Comments -
Inland Coal Transportation Agreement Signed Between the
Petitioner Huaneng Shandong Ruyi (Pakistan) Energy (Private)
Limited and Pakistan Railway Freight Transportation Company
Private Limited (on behlaf of GOP) for Suppy of Coal for 2*660
MW Coal Fired Project located in Sahiwal Punjab |
|
Inland Coal
Transportation Agreement between Huaneng Shandong Ruyi
(Pakistan) Energy (Private) Limited and Pakistan Railway
Freight Transportation Company Private Limited |
||
03-05-2016 |
Decision of the Authority in the matter of
Modification in the Existing Mechanism of Fuel Cost Component of
Gas / HSD Based IPPs on account of Re-gasified Liquefied
Natural Gas |
|
03-05-2016 |
Decision of the Authority in the matter
of Fuel Charges Adjustment for the Month of February 2016 for
K-Electric Limited and Notification (S.R.O. 385(1)/2015 dated
02.05.2016) Thereof |
|
03-05-2016 |
Decision
of the Authority in the matter of Fuel Charges Adjustment for
the Month of March 2016 for XWDISCOs along with Notification
Thereof |
|
28-04-2016 |
Notice of Admission/Hearing:
Tariff Petition filed by WAPDA Hydroelectric for Supplementary
Tariff for payment of NHP and NHP Arrears to KPK during FY 2015-16 |
|
WAPDA Hydroelectric Bulk Supply
Tariff Petition for Revised Supplementary Tariff for Payment
of NHP and Arrears to KPK during FY 2015-16 |
||
24-04-2016 |
Hearing
Regarding Fuel Charges Adjustment for the Month of March 2016
for Ex-WAPDA Distribution Companies |
|
CPPAGL Energy Purchase Data for
the Month of March 2016 |
||
22-04-2016 |
Notice of Admission: Generation
Licence Application of Matol (Private) Limited (MPL) |
|
Generation Licence Application
of Matol (Private) Limited (MPL) |
||
20-04-2016 |
Revised Decision of National Electric
Power Regulatory Authority in the matter of Application of AJ
Power (Private) Limited (AJPPL) for Unconditional Acceptance of
Upfront Tariff for 12 MW Solar PV Power Plant |
|
19-04-2016 |
Notice : Licencee Proposed
Modification in the Generation Licence of CHINIOT POWER LIMITED |
|
Licencee Proposed Modification (LPM)
in the Generation Licence of CHINIOT POWER LIMITED |
||
19-04-2016 |
Grant of Generation Licence No.
SGC/116/2016 Licence Application No. LAG-302 Master Power
(Private) Limited (MPPL) |
|
19-04-2016 |
Decision of the
Authority in the matter of Motions for Leave for Review in the
matter of Upfront Solar PV Tariff dated 16.12.2015 |
|
18-04-2016 |
NEPRA Tender No. 05/2016 - Proposal for
Pre-qualification: Establishment of Data Centre and NOC
Room |
|
18-04-2016 |
Notice of Admission: Generation
Licence Application of Three Gorges Second Wind Farm Pakistan
Limited (TGSWFL) [Formerly Wind Eagle Limited (WEL)] |
|
Application of Three Gorges Second
Wind Farm Pakistan (Pvt.) Limited (TGI) for Grant of Generation
License in respect of 49.5 MW Wind Power Plant, District Thatta |
||
18-04-2016 |
Corrigendum: Generation Licence Application of Three Gorges Third
Wind Farm Pakistan (Private) Limited |
|
Notice of Admission: Generation
Licence Application of Three Gorges Third Wind Farm Pakistan
(Private) Limited
(TGSWFL) |
||
Application of Three Gorges Third
Wind Farm Pakistan Limited (TGI) for Grant Generation License in
respect of 49.5 MW Wind Power Plant, District Thatta |
||
14-04-2016 |
Determination of the Authority in
the matter of Tariff Petition filed by Quaid-e-Azam
Thermal Power (Pvt.) Ltd. (QATPL) for Determination of
Generation Tariff for its 1180.17 MW Power Project on RLNG/HSD
at Bhikki, Sheikhupura Punjab |
|
14-04-2016 |
Decision of the Authority
in the matter of Tariff Adjustment at Commercial Operation
Date of 84 MW New Bong Escape Hydropower Project — Laraib
Energy Limited (LEL) |
|
13-04-2016 |
Decision of the Authority in the
matter of Request for Reconsideration filed by Ministry of
Water & Power regarding Decisions of the Authority for
Quarterly Adjustments of Tariff of K-Electric Limited
(K-Electric) for the Quarters ended March 2015 and June
2015 |
|
13-04-2016 |
Decision of the Authority in the
matter of Request for Reconsideration filed by Ministry of
Water & Power regarding Decision of the Authority for
Quarterly Adjustment of Tariff of K-Electric Limited
(K-Electric) for the Quarter ended December 2014 |
|
11-04-2016 |
Notice - Licence
Proposed Modification (LPM) in the Generation
Licence of Hawa Energy (Private) Limited (HEPL) |
|
Petition for Licence
Proposed Modification (LPM) in the Generation
Licence of Hawa Energy (Private) Limited (HEPL) |
||
08-04-2016 |
Determination of the
Authority in the matter of Petition filed by the
Tribal Areas Electricity Supply Company Ltd.
(TESCO) for Determination of its Consumer end
Tariff Pertaining to Financial Year 2015-2016 based
on Actual/Estimated Results or the Financial Year
2014-15 as a Base Year |
|
05-04-2016 |
S.R.O 260(I)/2016
Dated 28-03-2016 Regarding Tariff Notification
regarding NEPRA's Upfront Tariff of Small Hydro
Power Generation Projectss |
|
05-04-2016 |
Hearing in the
Matter of Monthly Fuel Charges Adjustment (FCA)
Request of K-Electric Limited for the Month
of February, 2016 |
|
K-Electric Limited
Monthly Fuel Cost Adjustment (FCA) due to Variation
in Fuel and Power Purchase Price for the Month of
February 2016. |
||
03-04-2016 |
Notice
- Licensee Proposed Modification (LPM) in the
Generation Licence of
Jhimpir Power (Private)
Limited (JPPL) |
|
Jhimpir Power
(Private) Limited (JPPL) -
Application for License Proposed Modification |
||
02-04-2016 |
Notice of Admission
- Generation Licence Application of Tricon
Boston Consulting Corporation (Private) Limited (TBCCPL)
- Plant C |
|
Application for a
Generation License TBCCPL-C 50MW Wind Power
Project |
||
02-04-2016 |
Notice of Admission
- Generation Licence Application of Tricon
Boston Consulting Corporation (Private) Limited (TBCCPL)
- Plant B |
|
Application for a
Generation License TBCCPL-B 50MW Wind Power
Project |
||
02-04-2016 |
Notice of Admission
- Generation Licence Application of Tricon
Boston Consulting Corporation (Private) Limited (TBCCPL)
- Plant A |
|
Application for a
Generation License TBCCPL-A 50MW Wind Power
Project |
||
31-03-2016 |
Karot Power Company (Pvt.) Limited Motion for Leave for Review
against Authority's Decision No. NEPRA/TRF-309/KPCL-2015/2544-2546
dated 4th February 2016, in the matter of EPC Stage Tariff
Determination of 720 MW Karot Hydropower Project |
|
31-03-2016 |
Decision of National
Electric Power Regulatory Authority in the matter of Application of
Three Gorges Second Wind Farm (Private) Ltd. Opting for
Upfront Tariff for Wind Power Projects |
|
31-03-2016 |
Decision of National
Electric Power Regulatory Authority in the matter of Application of
Hartford Alternative Energy (Private) Ltd. (HAEPL) Opting for
Upfront Tariff for Wind Power Projects |
|
30-03-2016 |
Corrigendum: Revised
Order of National Electric Power Regulatory Authority in the matter
of Application of Safe Solar Power (Private) Limited (SSPPL)
for Unconditional Acceptance of Upfront Solar Tariff for 10 MW Solar
Power Plant |
|
25-03-2016 |
Determination of the Authority
in the matter of Petition filed by Quetta Electric Supply Company
Ltd. (QESCO) for the Determination of its Consumer end Tariff
Pertaining to Financial Year 2015-2016 |
|
25-03-2016 |
Decision of the Authority in
the matter of Show Cause Notice dated July 24, 2015 issued to
K-Electric under Section 28 and 29 of the Regulation of
Generation, Transmission and Distribution of Electric Power Act,
1997 |
|
24-03-2016 |
Notice of Hearing - Hearing regarding Fuel Charges
Adjustment for the Month of February 2016
for Ex-WAPDA Distribution Companies |
|
CPPAGL -
Energy Purchase Data for the Month of
February 2016 |
||
24-03-2016 |
Motion for Review
under Rule 16(6) of the NEPRA (Standards &
Procedures) Rules, 1998, read with Regulation 3 of
NEPRA Review (Procedure) Regulation, 2009, in Case
No. NEPRATTRF-304/NPGCL-2015-Northern Power
Generation Company Limited |
|
18-03-2016 |
Comments of the Stakeholder are invited within 30
days on the
proposed formats for submission of required
information along with the tariff petitions by power
generation companies |
|
18-03-2016 |
Motion for Leave to
Review against Tariff Determination of NPGCL
for FY 2014015 to 2016-17, field by Northern Power
Generation Company Limited (NPGCL) |
|
14-03-2016 |
Port Qasim Electric
Power Company (Pvt) Ltd: Request for
Confirmation of the contract price for EPC of Coal
unloading Jetty and Channel for Port Qasim Coal
fired Power Project and the contract price for
management consulting (Supervision) service contract
for EPC of Coal-unloading jetty and Channel for Port
Qasim coal-fired Power Project. |
|
Tender Evaluation
Report for Management Consulting (Supervision)
Service Contract for EPC of Coal-unloading Jetty &
Channel for Pakistan Port Qasim 2X660 MW Coal-fired
Power Project. |
||
Tender evaluation report for EPC of
Coal-unloading jetty & channel for Port Qasim
coal-fired Power Project |
||
EPC /Turnkey
Coal-Unloading Jetty and Channel Contract |
||
11-03-2016 |
Notice of Admission
- Generation Licence Application of Pakistan
Atomic Energy Commission (PAEC) for its Chashma
Nuclear Power Plant Unit-4 (CHASNUPP-4) |
|
Notice of Admission
- Generation Licence Application of Pakistan
Atomic Energy Commission (PAEC) for its Chashma
Nuclear Power Plant Unit-3 (CHASNUPP-3) |
||
10-03-2016 |
Notice of Admission/
Hearing - Petition filed by Kandiah Hydropower
(Pvt.) Limited for the Determination of
Feasibility Stage Generation Tariff in Respect of
545 MW Kaigah Hydropower Project. |
|
Submission of the Feasibility Stage
Tariff Petition of 545 MW Kandiah Hydropower
(Pvt.) Limited |
||
Issues Framed for hearing scheduled for April
14, 2016 in the matter of feasibility stage
tariff petition filed by
Kandiah Hydropower (Pvt) Limited for its 545 MW Kandiah Hydropower
(Pvt.) Limited |
||
09-03-2016 |
Notice of Hearing
- Hearing in the matter of Monthly Fuel Charges
Adjustment (FCA) Request of K-Electric Limited
for the Month of December 2015, January
2016, and Quarterly Adjustment Request
for the Quarter October-December 2015 |
|
K-Electric
Revised Monthly Fuel Cost Adjustment (FCA) due to
Variation in Fuel and Power Purchase Price for the
Month of December 2015 |
||
K-Electric
Revised Monthly Fuel Cost Adjustment (FCA) due to
Variation in Fuel and Power Purchase Price for the
Month of January 2016 |
||
K-Electric
Submission of Adjustment in K-Electric Schedule of
Tariff on Account of Fuel Price and Power Purchase
Cost Variation for Quarter ended December 2015 |
||
08-03-2016 |
Determination of the
Authority in the matter of Petition filed by
Lahore Electric Supply Company Ltd. (LESCO) for
the Determination of its Multi-Year Consumer end
Tariff Pertaining to Financial Years 2015-2016 to
2019-20 |
|
05-03-2016 |
Notice of Admission/
Public Hearing - Petition filed by Tribal
Areas Electricity Supply Company (TESCO) for the
Determination of its Consumer-end Tariff Pertaining
to the FY 2015-16 based on Actual/Estimated Results
for the FY 2014-15 as the Base Year |
|
Petition filed by Tribal
Areas Electricity Supply Company (TESCO) for the
Determination of its Consumer-end Tariff Pertaining
to the FY 2015-16 based on Actual/Estimated Results
for the FY 2014-15 as the Base Year |
||
Framing of issue in the
matter of Petition filed by TESCO for the
Determination of its Consumer-End Tariff Pertaining
to the FY 2015-16 Based on Actual/Estimated Results
of FY 2014-15 as Base Year |
||
05-03-2016 |
Notice of
Hearing - Tariff Petition filed by
Sindh Transmission and Dispatch Company
(Private) Limited (STDC) for the
Determination of tariff for 95km
transmission line project from Nooriabad,
Sindh to KDA-33 Grid Station Karachi, Sindh |
|
Tariff Petition
filed by Sindh Transmission and Dispatch
Company (Private) Limited (STDC) for the
Determination of tariff for 95km
transmission line project |
||
Issues framed
for Hearing of Tariff Petition of STDC
Transmission Line Project from Nooriabad,
Sindh to KDA Grid Karachi, Sindh |
||
05-03-2016 |
Notice of Public Hearing in the Matter
of Application of DHAI Development and Engineering Services (Private)
Limited for the Consideration of Grant of Distribution Licence |
|
Issues to be Discussed during the Public
Hearing in the Matter of Application of DHAI Development and Engineering
Services (Private) Limited (DDES) for the Consideration of Grant of
Distribution Licence |
||
Comments of Stake Holders for Dhai Development & Engineering
Services (Private) Limited (DDES) |
||
Notice of Admission -
Distribution Licence Application of Dhai Development & Engineering
Services (Private) Limited (DDES) |
||
Distribution Licence Application
of Dhai Development & Engineering Services (Private) Limited (DDES) |
||
04-03-2016 |
Decision
of the Authority in the matter of Motion for Leave for
Review filed by Azad Pattan Power (Pvt.) Ltd. against
Authority's Decision for approval of Power Procurement
Request filed by CPPA-G (then NTDC) in respect of 640 MW
Azad Pattan Hydropower Project |
|
03-03-2016 |
Generation
Licence No. IGSPL/66/2016 - Licence
Application No. LAG-290 - Lucky Electric
Power Company Limited (LEPCL) |
|
03-03-2016 |
Decision of the
Authority in the matter of Fuel Charges Adjustment
for the Month of January 2016 for XWDISCOs
alone with Notification Thereof |
|
29-02-2016 |
Determination of
the Authority in the matter of Petition
filed by Peshawar Electric Supply Company
Ltd. (PESCO) for the Determination of
its Consumer end Tariff Pertaining to the
Financial Year 2015-2016 |
|
29-02-2016 |
Determination of the
Authority in the matter of Petition filed by
Gujranwala Electric Power Company Ltd. (GEPCO)
for the Determination of its Consumer end Tariff
Pertaining to Financial Year 2015-2016 |
|
29-02-2016 |
Determination of
the Authority in the matter of Petition
filed by Multan Electric Power Company
Ltd. (MEPCO) for the Determination of
its Consumer end Tariff Pertaining to
Financial Year 2015-2016 Based on
Actual/Estimated Results for the FY 2014-15
as Base Year |
|
29-02-2016 |
Determination of the
Authority in the matter of Petition filed by
Islamabad Electric Supply Company Ltd. (IESCO)
for the Determination of its Consumer end Tariff
Pertaining to Financial Years 2015-2016 to 2019-20 |
|
29-02-2016 |
Determination of
the Authority in the matter of Petition
filed by Sukkur Electric Power Company
Ltd. (SEPCO) for the Determination of
its Consumer end Tariff Pertaining to
Financial Year 2015-2016 |
|
27-02-2016 |
Notice of Admission/
Hearing - Tariff Petition filed by Private
Power Infrastructure Board (PPIB) for the
Determination of Tariff for Matiari-Lahore 660 kV
Transmission Line Project |
|
PPIB Petition
for Determination of Tariff for 660 KV HVDC
Transmission Line |
||
Issues framed
for hearing to be held against the Tariff Petition
filed by PPIB for the Matiari-Lahore 660 KV
4000 MW HVDC
Transmission Line Project |
||
24-02-2016 |
Modification-I in
Generation Licence No: IGSPL/22/2009 -
Licence Application No. LAG-130 Grange Power
Limited (GPL) |
|
24-02-2016 |
Modification-I in
Generation Licence No: SPGL/07/2014 Licence
Application No. LAG-256 Safe Solar Power (Private)
Limited (SSPPL1 |
|
24-02-2016 |
Notice of
Hearing - Hearing Regarding Fuel
Charges Adjustment for the Month of
January 2016 for Ex-WAPDA Distribution
Companies |
|
CPPAGL -
Energy Purchase Data for the Month of
January 2016 |
||
23-02-2016 |
Notice of
Admission/ Hearing - Petition filed by Quaid-e-Azam
Thermal Power (Pvt.) Ltd. (QATPL) for
Approval of Generation Tariff for RLNG based
Power Plant of
1180.13 MW (Gross) at Bhikki |
|
Petition filed by Quaid-e-Azam
Thermal Power (Pvt.) Ltd. (QATPL) for
Approval of Generation Tariff for RLNG based
Power Plant of
1180.13 MW (Gross) at Bhikki |
||
22-02-2016 |
Decision of the
Authority regarding Interim Tariff in the
matter of Petition filed by Quaid-e-Azam
Thermal Power (Pvt.) Ltd. (QATPL) for
Determination of Generation Tariff of
1180.13 MW RLNG Based Combined Cycle Power
Plant at Bhikki, Sheikhupura, Punjab |
|
17-02-2016 |
Notice of
Admission/ Hearing - Petition filed by
Hyderabad Electric Supply Company Limited
(HESCO) for the Determination of its
Consumer-end Tariff Pertaining to the FY
2015-16 based on the Actual/ Estimated
Results of the FY 2014-15 as base Year. |
|
Petition for
Determination of Consumer-end Tariff for FY 2015-16
in respect of
Hyderabad Electric Supply Company Limited
(HESCO) |
||
Issues framed
for hearing in the Matter of Petition filed by
Hyderabad Electric Supply Company Limited (HESCO)
for the Determination of Its Consumer-End Tariff
Pertaining to the FY 2015-16 |
||
12-02-2016 |
Approval of
National Electric Power Regulatory Authority
in the matter of Application of China Power
Hub Generation Company (Private) Limited
(CPHGCL) for Unconditional Acceptance of
Upfront Coal Tariff for 2 x 660 MW Coal
Power Plant |
|
11-02-2016 |
K-Energy (Private)
Limited Motion for Leave for Review against the
Tariff Determination # NEPRA/TRF-311/KEPL-2015/17525-17527
dated 9th December 2015 |
|
09-02-2016 |
Decision of the Authority in the Matter
of Motions for Leave for Review filed against the Determination of
the Authority dated 03.04.2015 regarding Upfront Generation
Tariff for RLNG Based Power Plants |
|
05-02-2016 |
Notice of Admission/
Hearing - Tariff Petition filed by Fatima
Energy Limited (FEL) for the Determination of
Tariff for its 120 MW (Gross ISO) Co-generation
Power Project at Sanawan, Tehsil Kot Addu, District
Muzaffargarh |
|
Tariff Petition
filed by Fatima Energy Limited (FEL) for the
Determination of Tariff for its 120 MW (Gross ISO)
Co-generation Power Project at Sanawan, Tehsil Kot
Addu, District Muzaffargarh |
||
04-02-2016 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of December 2015 for
XWDISCOs along with Notification Thereof |
|
04-02-2016 |
Approval of National
Electric Power Regulatory Authority in the matter of
Application of Reshma Power Generation (Private)
Limited (RPGPL) for Unconditional Acceptance of
Upfront Tariff for Utilization of Existing Available
Capacity Short-Term Independent Power Producers |
|
03-02-2016 |
Notice of Hearing -
Petition filed by Lahore Electric Supply Company Limited (LESCO) for
the Determination of its Multi-year Consumer-end tariff Pertaining to the FY
2015-16 to 2019-20 based on the Actual/estimated Results of the FY 2014-15
as base year |
|
LESCO Resubmission of Petition for
Determination of Consumer-end Multiyear Tariff for FY 2015-16 to 2019-20 |
||
Issues Framed for
hearing in the matter of Petition filed by Lahore Electric Supply Company
(LESCO) for the determination of its Consumer-End tariff pertaining to
the FY 2015-16 to FY 2019-20 Under Multi-Year Tariff Regime |
||
02-02-2016 |
Addendum to Notice of Admission Regarding
Application of the Hub Power Company Limited
for the Grant of Generation Licence |
|
30-01-2016 |
Notice of Hearing -
Approval of Request for Proposals (RFPs) submitted by Punjab Power
Development Board (PPDB) and Pakhtunkhwa Energy Development Organization (PEDO)
for Development of Hydropower Projects |
|
29-01-2016 |
Notice of Admission
- Generation Licence Application of Fazal
Paper Mills (Private) Limited (FPMPL) |
|
Generation Licence
Application of Fazal Paper Mills (Private)
Limited (FPMPL) |
||
29-01-2016 |
Notice of Admission -
Distribution Licence Application of Dhai Development & Engineering
Services (Private) Limited (DDES) |
|
Distribution Licence Application
of Dhai Development & Engineering Services (Private) Limited (DDES) |
||
28-01-2016 |
Decision
of the Authority in the matter of Petition filed by
Lucky Cement Ltd. (LCL) for Determining the
Generation Tariff — 16 MW Waste Heat Recovery Power
Project |
|
28-01-2016 |
Technical Evaluation Statement for Purchase of Laptop &
Desktop Computers |
|
28-01-2016 |
Generation Licence
No. DGL/01/2016 - Licence Application No. LAN-01 -
Parliament House, Islamabad |
|
27-01-2016 |
Notice of Hearing -
Regarding Fuel Charges Adjustment for the Month of December 2015 for EX-WAPDA
Distribution Companies |
|
CPPAG Energy Purchase Data for
the Month of December 2015 |
||
27-01-2016 |
Notice of Admission/
Hearing - Petition filed by Quetta Electric
Supply Company Limited (QESCO) for the
Determination of its Consumer-end Tariff Pertaining
to the FY 2015-16 based on the Actual/ Estimated
Results of the FY 2014-15 as base Year |
|
Petition for
Determination of Consumer-end Tariff for FY 2015-16
in respect of Quetta Electric Supply Company
Limited (QESCO) |
||
Framing of Issues
in the Matter of Petition filed by Quetta
Electric Supply Company Limited (QESCO) for the
Determination of Its Consumer-End Tariff Pertaining
to the FY 2015-16. |
||
22-01-2016 |
Determination of the Authority
in the matter of Tariff Petition filed by Northern Power Generation Company
Ltd. (NPGCL) for the Determination of its Generation Tariff for the FY
2014-15 |
|
22-01-2016 |
Notice of Public
Hearing - in the Matter of Application of
Quaid-e-Azam Thermal Power (Pvt.) Limited for
the Grant of Generation Licence |
|
List of Issues
Framed For the Proposed Hearing in the Matter of
Application of Quaid-E-Azam Thermal Power (Pvt.)
Limited for the Consideration of Grant of
Generation Licence |
||
Comments of
Stakeholders on the Generation Licence Application
of QATPPL |
||
Rejoinders of QATPPL on the
comments of stakeholders |
||
Notice of Admission - Generation
Licence Application of Quaid-e-Azam Thermal Power
(Pvt.) Ltd. (QATPPL) |
||
Generation Licence
Application of Quaid-e-Azam Thermal Power (Pvt.)
Ltd. |
||
21-01-2016 |
Decision
of the Authority in the Matter of Petition filed by
Bahria Town (Pvt.) Ltd. (BTPL) for Determination
of Consumer-end Tariff for FY 2014-15 |
|
20-01-2016 |
Notice of Admission/
Hearing - Petition filed by Sammar Gah Hydro
(Pvt.) Limited for the Determination of
Feasibility Stage Generation Tariff in Respect of
28 MW Sammar Gah Hydropower Project |
|
Feasibility Stage
Tariff Petition of 28 MW Sammar Gah Hydro
(Private) Ltd. |
||
List of issues framed for hearing - in the
matter of petition filed by Sammar Gah Hydro
(Pvt.) Limited for the determination of
feasibility stage generation tariff
in respect of 28 mw Sammar Gah Hydropower Project |
||
20-01-2016 |
Notice for Seeking
Comments/ Suggestions in the matter of Approval
of Request for Proposal (RFP) for Development
of Hydropower Solicited Sites in Khyber Pakhtunkhwa
through Private Sector submitted by Pakhtunkhwa
Energy Development Organization under the NEPRA
Competitive Bidding (Approval Procedure) Regulations
2014 within 15 days |
|
20-01-2016 |
Notice for Seeking
Comments/ Suggestions in the matter of Approval
of Request for Proposal (RFP) for bidding of
135 MW Taunsa Hydropower Project submitted by
Punjab Power Development Board under the
NEPRA Competitive Bidding (Approval Procedure)
Regulations 2014 within 15 days |
|
15-01-2016 |
Notice of Public
Hearing - Comments are sought on proposed
amendments to the Commercial code as suggested by
the Review Panel of CPPA (G) |
|
Proposed amendments to
the Commercial code as suggested by the Review Panel
of CPPA (G) |
||
12-01-2016 |
Notice of Hearing
- Hearing in the Matter of Monthly Fuel Charges
Adjustment (FCA) of K-Electric Limited for
the Month of November, 2015 |
|
K-ELectric Limited
monthly Fuel Cost Adjustment (FCA) due to
Variation in Fuel and Power Purchase Price for the
Month of November 2015 |
||
10-01-2016 |
Modification-I
in the Generation Licence of Nishat Mills Limited |
|
10-01-2016 |
Modification-I
in the Generation Licence of
Karimi Energy (Private)
Limited |
|
10-01-2016 |
Modification-I
in the Generation Licence of
JDW Sugar Mills Limited |
|
10-01-2016 |
Modification-I
in the Generation Licence of
NBT Wind Power
Pakistan-III (Private) Limited |
|
10-01-2016 |
Modification-I
in the Generation Licence of
Kohinoor Energy Limited |
|
09-01-2016 |
Modification-I
in the Generation Licence of
Almoiz Industries
Limited |
|
09-01-2016 |
Modification-I
in the Generation Licence of
Fatima Energy Limited |
|
09-01-2016 |
Modification-I
in the Generation Licence of
Hawa Energy (Private)
Limited |
|
09-01-2016 |
Modification-I
in the Generation Licence of China Sunec Energy (Private)
Limited |
|
09-01-2016 |
Modification-III
in the Generation Licence of
Hydrochina Dawood Power
(Private) Limited |
|
09-01-2016 |
Notice of Hearing -
Suo Moto Proceedings in the Fuel Price Adjustment
Mechanism Determined in Upfront Coal Tariff |
|
Argus Media's Comment on NEPRA's
Adjustments/ Indexations for Imported Coal Used to calculate the
Upfront Electricity Tariff for Coal Power Projects. |
||
07-01-2016 |
Decision
of the Authority in the matter of Tariff Petition
filed by Southern Electric Power Company Ltd.
for Modification of Generation Tariff |
|
03-01-2016 |
Hearing in the Matter
of Modification in the Existing Mechanism of Fuel
Cost Component of Gas/HSD based Independent Power
Plants (IPPs) on Account of Utilization Re-gasified Liquified Natural Gas (RLPNG) |
|
01-01-2016 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of October 2015
for K-Electric Limited and Notification (S.R.O.
01(1)/2016 dated 01.01.2016) Thereof |
|
01-01-2016 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of November 2015
for XWDISCOs along with Notification Thereof |
31-12-2015 |
Determination of the Authority in the matter of
Petition filed by Faisalabad Electric Supply
Company Ltd. (FESCO) for the Determination of
its Consumer end Tariff Pertaining to Financial Year
2015-2016 |
|
30-12-2015 |
Notice for Seeking Comments
in the Matter of Authority Proposed Modification (APM) in
the Generation Licence of Central Power Generation
Company Limited (CPGCL/GENCO-II) |
|
30-12-2015 |
Notice for Seeking Comments
in the Matter of Authority Proposed Modification (APM) in the
Generation Licence of Northern Power Generation Company Limited (NPGCL/GENCO-III) |
|
30-12-2015 |
Notice for Seeking Comments
in the Matter of Authority Proposed Modification (APM) in
the Generation Licence of Northern Power Generation
Company Limited (NPGCL/GENCO-III) |
|
29-12-2015 |
Notice - Licensee Proposed Modification
(LPM) in the Generation Licence of FFBL Power Company Limited (FPCL) |
|
Licensee Proposed
Modification Application - FFBL Power Company Ltd (FPCL) |
||
24-12-2015 |
Notice of Hearing - Hearing
Regarding Fuel Charges Adjustment for the month November
2015 for Ex-WAPDA Distribution Companies |
|
CPPAG Energy Purchase Data for the month of
November 2015 |
||
23-12-2015 |
Amendment in National Electric
Power Regulatory Authority Competitive Bidding Tariff (Approval
Procedure) Regulations, 2014 for eliciting public comments
within 7 days |
|
22-12-2015 |
Notice of Admission - Generation
Licence Application of Sitara Chemical Industries Limited (SCIL) |
|
Generation Licence Application of Sitara Chemical Industries Limited (SCIL) |
||
22-12-2015 |
Notification (SRO
1266/2015) NEPRA (Interconnection for Renewable Generation
Facilities) Regulations, 2015 |
|
21-12-2015 |
Notification (SRO 1242(I)/2015 dated
17-12-2015) in the matter of Motion of Leave for Review
filed against the Determination of the Authority dated June 24, 2015
in the matter of Upfront Tariff for Wind Power Plants |
|
17-12-2015 |
Grant of Special Purpose
Transmission Licence No: SPTL/02/2015 - Licence Application No.
LAT-04 - Sindh Transmission & Dispatch Company (Pvt.) Limited
(ST&DCPL) |
|
16-12-2015 |
Notice of Admission - Generation
Licence Application of Gulf Sugar Mills Limited (GSML) |
|
Generation Licence Application of
Gulf Sugar Mills Limited (GSML) |
||
16-12-2015 |
Determination of
National Electric Power Regulatory Authority in the Matter of
Upfront Generation Tariff for Solar PV Power Plants |
|
15-12-2015 |
Authority proposed Amendments in
NEPRA Act 1997, seeking comments of all stakeholders within 30
days |
|
14-12-2015 |
Draft National
Electric Power Regulatory Authority (Wheeling of Electric Power)
Regulations, 2015 for comments within 20 days |
|
11-12-2015 |
Notice of Admission/ Hearing -
Change in Venue of Hearing in the Matter of Petition filed by
MEPCO for the Determination of its Consumer-end Tariff
Pertaining to the FY 2015-16 based on the Actual/ Estimated Results
of the FY 2014-15 as base year |
|
11-12-2015 |
Notice of Admission
- Generation Licence Application of Kandia Hydropower (Private)
Limited (KHPL) |
|
Generation Licence Application of Kandia Hydropower (Private)
Limited (KHPL) |
||
10-12-2015 |
Notice of Admission/ Hearing -
Rescheduling and Change in Venue of Hearing in the Matter of
Petition filed by LESCO for the Determination of its
Multi-Year Consumer-end Tariff Pertaining to the FY 2015-16 to
2019-20 based on the Actuals/ Estimated Results of the FY 2014-15 as
base year |
|
09-12-2015 |
Determination of the
Authority in the Matter of Tariff Petition filed by K-Energy
(Pvt.) Ltd. (KEPL) for Determination of Tariff for 421.909 MW
(Gross) Coal Conversion Project of Unit 3 & 4 of Bin Qasim Power
Station — I at Bin Qasim, Karachi |
|
05-12-2015 |
Notice of
Hearing - Hearing in the Matter of Monthly Fuel Charges
Adjustment (FCA) of K-Electric Limited for the Month
of October 2015 |
|
K-Electric Limited Monthly Fuel Cost Adjustment (FCA)
due to Variation in Fuel and Power Purchase Price for the
Month of October 2015 |
||
05-12-2015 |
Notice of Admission
for Generation Licence - Shams Power (Private) Limited |
|
Shams Power (Private) Limited
Application for a Generation Licence |
||
Motion
for Leave for Review on the Determination of Bulk Supply
Tariff Petition - WAPDA Hydroelectric for FY 2015-16 |
||
04-12-2015 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the Month of
October 2015 for XWDISCOs along with Notification Thereof |
|
01-12-2015 |
Decision of the Authority in the Matter
of Motion for Leave for Review filed by Zorlu Enerji
Pakistan Ltd. against Decision of the Authority in the
matter of its Tariff adjustments at Commercial Operations
Date |
|
30-11-2015 |
Decision of the Authority in the matter
of Fuel Charges Adjustment for the Month of September 2015 for
K-Electric Limited and Notification (S.R.O.1179(1)12015 dated
30.1L2015) Thereof |
|
30-11-2015 |
Notice of Admission /
Hearing - Petition filed by IESCO for the Determination of its
Multi-Year Consumer-end Tariff Pertaining to the FY 2015-16 to 2019-20 based
on the Actual/ Estimated results of the FY 2014-15 as base year |
|
Petition for Determination of Consumer End
Tariff for FY 2015-16 to 2019-20 under Multi-Year Tariff Regime in respect
of Islamabad Electric Supply Co. Ltd. (IESCO) |
||
Issues Framed For Hearing In The Matter Of Petition Filed By Islamabad
Electric Supply Company Limited (IESCO) For The Determination Of Its
Consumer-End Tariff Pertaining To The FY 2015-16 To 2019-20 Under Multi-Year
Tariff Regime |
||
Framing of Issues for Hearing Regarding MYT Petition of IESCO for FY
2015-16 to 2019-20 |
||
30-11-2015 |
Notice of Admission /
Hearing - Petition filed by MEPCO for the Determination of
Consumer-end Tariff Pertaining to the FY 2015-16 based on the Actual/
Estimated results of the FY 2014-15 as base year |
|
Petition for Determination of Consumer-end
Tariff for FY 2015-16 to 2019-20 under Multi-year Tariff Regime in
respect of Multan Electric Power Co. Ltd. (MEPCO) |
||
Framing of issues in the matter of
Petition filed by Multan Electric Power Company Limited (MEPCO) for the
determination of its Consumer-End tariff pertaining to the FY 2015-16 based
on actual/estimated result for FY 2014-15 as Base Year. |
||
Framing of
Issues for Hearing Regarding MYT Petition of MEPCO for FY 2015-16 to
2019-20 |
||
30-11-2015 |
Notice of Admission /
Hearing - Petition filed by LESCO for the Determination of its
Multi-Year Consumer-end Tariff Pertaining to the FY 2015-16 to 2019-20 based
on the Actual/ Estimated results of the FY 2014-15 as base year |
|
Petition for Determination of Consumer-end
Tariff for FY 2015-16 to 2019-20 under Multi-Year Tariff Regime in respect
of Lahore Electric Supply Co. Ltd. (LESCO) |
||
Framing of issues in the matter of
Petition filed by Lahore Electric Supply Company (LESCO) for the
determination of its Consumer-End tariff pertaining to the FY 2015-16 to FY
2019-20 Under Multi-Year Tariff Regime |
||
Framing of
Issues for Hearing Regarding MYT Petition of LESCO for FY 2015-16 to
2019-20 |
||
26-11-2015 |
Notice of Hearing - Hearing
Regarding Fuel Charges Adjustment for the month October
2015 for Ex-WAPDA Distribution Companies |
|
CPPA Revised Energy Purchase
Data for the Month for the Month of October 2015 |
||
18-11-2015 |
Public Notice -
Licensee Proposed Modification (LPM) in the Generation Licence of Buksh
Solar (Private) Limited (BSPL) |
|
Application for Modification in Generation Licence No. SPGL/06/2014 granted to Buksh Solar (Private) Limited |
||
13-11-2015 |
NEPRA (Supply of
Electric Power) Regulations, 2015 |
|
13-11-2015 |
Determination of the Authority in the matter of Bulk
supply Tariff for WAPDA Hydroelectric for Financial Year 2015-16 |
|
11-11-2015 |
Hearing in the Matter of
Monthly Fuel Charges Adjustment of K-Electric Limited (Formerly KESCL) for the Month of September 2015 as well as Quarterly
Adjustment for the Quarter July-September 2015 |
|
K-Electric Monthly Fuel Cost
Adjustment (FCA) due to Variation in Fuel and Power Purchase Price
for the Month of September 2015 |
||
K-Electric Adjustment in
K-Electric Schedule of Tariff on Account of Fuel Price and Power
Purchase Cost Variation for Quarter ended September 2015 |
||
07-11-2015 |
Notice of Admission - Generation
Licence Aplication of Quaid-e-Azam Thermal Power
(Pvt.) Ltd. (QATPPL) |
|
Quaid-e-Azam Thermal Power
(Pvt.) Ltd. Application for a Generation License |
||
05-11-2105 |
Notice of Admission - Generation
Licence Application of NC
Electric Company Limited (NCECL) |
|
NC Electric
Company Limited (NCECL) - Application for Generation Licence for
Approximately 46 MW (Gross) |
||
05-11-2105 |
Notice -
Licence Proposed Modification in the Generation Licence of Safe
Solar Power (Private) Limited (SSPPL) |
|
Safe Solar Power (Private) Limited (SSPPL)
- Application for Modification to Generation Licence |
||
05-11-2105 |
Decision of the Authority in the matter of Fuel
Charges Adjustment for the Month of September 2015 for
XWDISCOs along with Notification Thereof |
|
04-11-2015 |
Decisions of the
Authority in the matter of Fuel Charges Adjustment for the Months of
June, July and August 2015 for K-Electric Limited (formerly Karachi
Electric Supply Company Ltd.) and Notifications Thereof |
|
03-11-2105 |
Hearing in
the matter of approval of Power Acquisition Contract filed by
NTDC for Purchase of Power CASA-100 Transmission Project
Under Regulations 4(i) of NEPRA Interm Power Procurement (Standards
& Procedure) Regulations 2005 |
|
Signing of Master Agreement and Power Purchase
Agreement of CASA-1000 Protect. |
||
01-11-2015 |
Notice of Admission
- Generation Licence Application of Hartford Alternative Energy
(Private) Limited (HAEPL) |
|
Application for the Grant of
Generation Licence on Behalf of Hartford Alternative Energy
(Private) Limited in Relation to its 49.3 MW Wind Power
Generation Project to be located at Jhimpir District Thatta,
Province of Sindh |
||
31-10-2105 |
Notice of Admission - Generation
Licence Application of Siddiqsons Solar Limited (SSL) |
|
Application for a Generation Licence of
Siddiqsons Solar Limited for its 50 MW Solar Power Project to be
Located near Haasil Village, Chakwal District, Punjab |
||
31-10-2015 |
Notice of Admission/ Hearing
- Petition filed by SEPCO for the Determination
of its Consumer-end Tariff Pertaining to the FY 2015-16
based on the Actual/ Estimated Results of the FY 2014-15 base
year |
|
Tariff Petition for the
Determination of Consumer End Tariff for FY 2015-16 based on
Actual / Estimated Result of FY 2014-15 base year |
||
Framing of issues in the matter of Petition filed by
Sukkur Electric Power Company (SEPCO) for the
Determination of its Consumer-End Tariff Pertaining to the
FY 2015-16 Based on Actual/Estimated Results of FY 2014-15
as Test Year. |
||
31-10-2105 |
Notice of
Admission/ Hearing - Petition filed by PESCO for the
Determination of its Consumer-end Tariff Pertaining to the FY
2015-16 based on the Actual/ Estimated Results of the FY 2014-15 base
year |
|
Petition for the
Determination of Consumer End Tariff for FY 2015-16 to 2019-20
under multiyear tariff regime in respect of
Peshawar Electric Supply Company Limited (PESCO) |
||
Issues
framed for hearing in the matter of petition filed by
PESCO for the determination of its consumer-end tariff
pertaining to the FY 2015-16 to 2019-20 under multi-year
tariff regime. |
||
28-10-2015 |
Decision of the
Authority in the matter of Request filed by Central Power
Purchasing Agency (Guarantee) Limited for approval of
Negotiated/Signed Power Purchase Agreement regarding
Procurement of Power from 102 MW Gulpur Hydropower
Project of Mira Power Limited |
|
28-10-2105 |
Notice to Seek Comments - Inland Coal Transportation
Agreement Signed between Sponsor Company " Huaneng Shandong
Ruyi (Pakistan) Energy (Private) Limited and Paksitan Railway
Freight Transportation Company Private Limited (on behalf of
GOP) Supply of Coal for 2*660 MW Coal Fired Project Located in
Sahiwal Punjab. |
|
Inland Coal
Transportation Agreement Signed between Huaneng Shandong Ruyi
(Pakistan) Energy (Private) Limited and Paksitan Railway
Freight Transportation Company Private Limited (on behalf of
GOP) Supply of Coal for 2*660 MW Coal Fired Project Located in
Sahiwal Punjab. |
||
27-10-2015 |
Decision of the
Authority in the matter of Fuel Charges Adjustment
for the Month of August 2015 for XWDISCOs
along with Notification Thereof |
|
27-10-2105 |
Hearing in the Matter of Power Acquisition Request (PAR) filed by
K-Electric under NEPRA Interim Power Procurement (Procedure &
Standards) Regulations 2005 for Purchase of 50 MW (Net) Power (Gasbased)
from Sindh Nooriabad Power Company Private Limited - Phase -II (SNPC-II) |
|
K-Electric Power Acquisition Request
(PAR) in relation to Sindh Nooriabad Power Company Private Limited - Phase -II (SNPC-II) |
||
27-10-2015 |
Hearing in the
Matter of Power Acquisition Request (PAR) filed by
K-Electric under NEPRA Interim Power Procurement
(Procedure & Standards) Regulations 2005 for Purchase of 50
MW (Net) Power (Gasbased) from Sindh Nooriabad Power
Company Private Limited (SNPC) |
|
K-Electric Power Acquisition
Request (PAR) in relation to Sindh Nooriabad Power Company Private Limited(SNPC) |
||
22-10-2015 |
Notice of Hearing - Hearing in the matter of
Monthly Fuel Charges Adjustment (FCA) of K-Electric Limited
(Formerly KESCL) for the Month of August, 2015 |
|
K-Electric Monthly Fuel
Cost Adjustment (FCA) due to Variation in Fuel and Power
Purchase Price for the Month of August 2015 |
||
22-10-2015 |
Decision of the
Authority in the Matter of Motions for Leave for Review
against NEPRA's Decisions Dated 24.11.2014 filed by (i) Thal
Industries Corporation Ltd., (ii) Jamal Din Wali Sugar
Mills, (iii) Al-Moiz Industries Limited, (iv) Deharki Sugar
Mills Ltd. and (v) Al-Noor Sugar Mills Ltd. |
|
19-10-2105 |
Decision of the Authority in the Matter of
Motions for Leave for Review filed against the Determination
of the Authority dated June 24, 2015 in the matter of Upfront
Tariff for Wind Power Plants |
|
19-10-2015 |
Notice of
Hearing - Hearing Regarding Fuel Charges Adjustment for
the Month of September 2015 for Ex-WAPDA Distribution
Companies |
|
CPPAGL
Energy Purchase Data for the Month of September 2015 |
||
14-10-2015 |
Decision of the National Electric Power
Regulatory Authority in the matter of Motions for Leave for
Review filed against Determination of the Authority dated April
2, 2015 regarding Upfront Tariff for Small Hydro Power Generation
Projects Upto 25 MW Installed Capacity |
|
09-10-2015 |
Grant of Generation Licence No. SGC/114/2015
Licence Application No. LAG-288 Hytex Energy (Private)
Limited (HEPL) |
|
09-10-2015 |
Order of National Electric
Power Authority in the matter of Application of AJ Power
(Private) Limited for unconditional Acceptance of
Upfront Tariff for 12 MW Solar PV Power Plant |
|
06-10-2015 |
Grant of
Generation Licence No. SPGL/16/2015 - Licence Application
No. LAG-311 - AJ Power (Private) Limited (AJPPL) |
|
05-10-2015 |
Modification-I in Generation Licence No: SGC/40/2008
- Licence Application No. LAG-106 - Nishat Mills Limited
(NML) |
|
05-10-2015 |
Notice of Hearing - Hearing
Regarding Fuel Charges Adjustment for the month August
2015 for Ex-WAPDA Distribution Companies |
|
CPPA Revised Energy Purchase
Data for the Month for the Month of August 2015 |
||
02-10-2015 |
Public Hearing: Petition
field by Karot Power Company (Pvt) Ltd for determination of
EPC Stage Generation Tariff for 720 MW Karot Hydropower
Project |
|
02-10-2015 |
Notice of Admission:
Generation Licence Application of the Hub Power Company
Limited (HUBCO) |
|
HUBCO Application for
Grant of a Generation Licence for 2x660 MW Coal based Power
Generation plant along with a dedicated coal import Jetty at
Hub Balochistan, Pakisttan |
||
02-10-2015 |
Notice to
Delinquent Companies:
Following 05 firms declared as delinquent by NEPRA.
(1)
Green Electric Private Limited
(2)
Eastern Power Limited
(3)
Arabian Sea Wind Energy Private
(4)
SUNEC Wind Power Generation Private
(5)
First Tri Star Modarba |
|
01-10-2015 |
Decision of the Authority in
the matter of Fuel Charges Adjustment for the Month of
July 2015 for XWDISCOs along with Notification Thereof |
|
01-10-2015 |
Decision of the
Authority in the matter of Fuel Charges Adjustment
for the Month of June 2015 for XWDISCOs along with
Notification Thereof |
|
01-10-2015 |
Postponement
of Hearing in the Matter of Petition filed by PESCO
for the Determination of its Multi-year Consumer-end Tariff
Pertaining to the FY 2015-16 to 2019-20 based on
Actual/estimated Results of the FY 2014-15 as base year. |
|
19-09-2015 |
Notice of
SUO MOTU Proceedings Development of New Upfront Solar
PV Tariff for 2016 |
|
18-09-2015 |
Notice of Admission :
Application for Grant of Special Purpose Transmission
License Sindh Transmission & Despatch Company (Pvt)
Limited (STDC) |
|
Application for Grant of
Special Purpose Transmission License Sindh Transmission &
Despatch Company (Pvt) Limited (STDC) |
||
17-09-2015 |
Notice of
Admission/Hearing: Petition
filed by Gujranwala Electric Power Company Ltd (GEPCO)
for the Determination of its Consumer-End Tariff pertaining
to the FY 2015-16 based on the Actual/Estimated
results of the FY 2014-15 as base year |
|
Petition filed by Gujranwala Electric Power Company Ltd (GEPCO)
for the Determination of its Consumer-End Tariff pertaining
to the FY 2015-16 based on the Actual/Estimated
results of the FY 2014-15 as base year |
||
Framing of issue in the matter of petition filed by
Gujranwala Electric Power Company Limited (GEPCO) for the
determination of its Consumer-End Tariff pertaining to the
FY 2015-16 |
||
17-09-2015 |
Motion for
Leave for Review in respect of Determination of Authority in
the matter of tariff petition filed by CMECPPL for its
generation tariff for 330 MW Local Coal Fired Power Project
at Pind Dadan Khan, Salt Range, Pun |
|
17-09-2015 |
Notice: Licensee
Proposed Modification (LPM) in the Generation Licence of
Karot Power Company (Pvt) Ltd |
|
Korot Power
Company (Pvt) Ltd : Application for Modification of the
Generation License of 732 MW Karot Hydropower Project |
||
16-09-2015 |
Notice of Hearing:
in the matter of Monthly Fuel Charges Adjustment for the
months of June & July, 2015 and Quarterly Adjustment for the
Quarter ended June, 2015 of K-Electric Limited. |
|
Monthly
Fuel Cost Adjustment (FCA) K-ELECTRIC due to variation in Fuel and
Power Purchase Price for the Month of June 2015 |
||
Monthly
Fuel Cost Adjustment (FCA) K-ELECTRIC due to variation in Fuel and
Power Purchase Price for the Month of July 2015 |
||
Adjustment in K-ELECTRIC schedule of Tariff on account of
Fuel Price and
Power purchase cost variation for Quarter Ended June 2015 |
||
16-09-2015 |
Notice of
Admission/Hearing:
Petition filed by Peshawar
Electric Supply Company Limited (PESCO) for the
Determination of Its Multi-Year Consumer end tariff
pertaining to the FY 2015-16 to 2019-20 based on the
actual/estimated results of the FY 2014-15 as base year |
|
Petition for the
Determination of Consumer End Tariff for FY 2015-16 to
2019-20 under multiyear tariff regime in respect of
Peshawar Electric Supply Company Limited (PESCO) |
||
14-09-2015 |
Modification-II in Generation Licence
No: 003/SGC/2001 Licence Application No. LAG-52 ICI
Pakistan PowerGen Limited (ICIPPGL) |
|
14-09-2015 |
Modification-I in Generation Licence No: SGC/91/2013
Licence Application No. LAG-215 Gadoon
Textile Mills Limited (GTML) |
|
14-09-2015 |
Modification-I in Generation Licence No: SGC/96/2013
Licence Application No. LAG-222 Fatima Energy Limited (FEL) |
|
14-09-2015 |
Grant of
Generation Licence No. SGC/112/2015 Licence
Application No. LAG-286
Data Hydropower Private Limited (DHPL) |
|
14-09-2015 |
Grant of Generation Licence No. IGSPL/65/2015
Licence Application No. LAG-305 Siddiqsons Energy Limited
(SDSEL) |
|
14-09-2015 |
Grant of Generation Licence No. SGC/113/2015
Licence Application No. LAG-306 Khairpur Sugar Mills
Limited (KRPSML) |
|
11-09-2015 |
Petition for the
Determination of Consumer End Tariff for FY 2015-16 to
2019-20 under multiyear tariff regime in respect of
Peshawar Electric Supply Company Limited (PESCO) |
|
10-09-2015 |
Notice of Admission / Hearing :
Rescheduling of Hearing in the matter of petition filed by
Faisalabad Electric Supply Company Limited (FESCO) for the
determination of its Multi-Year Consumer End Tariff
pertaining to the FY 2015-16 to 2019-20 based on the
Actual/estimated results of the FY 2014-15 as base year. |
|
Petition for the
Determination of Consumer End Tariff for FY 2015-16 to
2019-20 under multiyear tariff regime in respect of
Faisalabad Electric Supply Company Limited (FESCO) |
||
Issues framed for hearing in the matter of Petition
filed by Faisalabad Electric Supply Company Limited (FESCO)
for determination of its Consumer-End tariff pertaining to
FY 2015-16 to FY 2019-20 Under Multi-Year Tariff
Regime |
||
09-09-2015 |
Notice of Hearing: Regarding Fuel Charges
Adjustment for the month of June 2015
for Ex-WAPDA Distribution Companies |
|
Monthly
Energy Purchase Data for June-2015 along with complete
detail |
||
Notice of Hearing: Regarding Fuel Charges
Adjustment for the month of July 2015
for Ex-WAPDA Distribution Companies |
||
Monthly
Energy Purchase Data for July-2015 along with complete
detail |
||
06-09-2015 |
Notice of Hearing: Petition filed by Faisalabad
Electric Supply Company Limited (FESCO) for the
Determination of Its Multi-Year Consumer end tariff
pertaining to the FY 2015-16 to 2019-20 based on the
actual/estimated results of the FY 2014-15 as base year |
|
Petition for the
Determination of Consumer End Tariff for FY 2015-16 to
2019-20 under multiyear tariff regime in respect of
Faisalabad Electric Supply Company Limited (FESCO) |
||
04-09-2015 |
Notice of Hearing:
Central Power Generation Company Limited (CPGCL)
for the Determination of Tariff for New 747 MW
(Gross) CCPP at Guddu in Distric Kashmore, Sindh |
|
Tariff Petition on
behalf of Central Power Generation Company Limited (CPGCL)
GENCO-II |
||
04-09-2015 |
Decision
of the Authority in the matter of Motions for Leave for
Review filed in respect of Modification-II in Transmission
Licence # TL/01/2002 of National Transmission and Despatch
Company Limited (NTDC) |
|
02-09-2015 |
National
Electric Power Regulatory Authority (Alternative
& Renewable Energy) Distributed Generation
and Net Metering Regulations, 2015 |
|
28-08-2015 |
Grant of Special Purpose Transmission
Licence No: SPTL/01/2015 - Licence
Application No. LAT-03 - Fatima
Transmission Company Limited (FTCL) |
|
27-08-2015 |
Draft
amendments to the NEPRA (Market
Operator Registration, Standards and
Procedure) Rules, 2015 for soliciting
comments and feedback from all
stakeholders and the general public within 7
days |
|
24-08-2015 |
Notice of Admission - Generation
Licence Application of Premier Industrial
Chemical MFG Co (Pvt) Limited (PICMPL) |
|
22-08-2015 |
Application for a Generation License
Premier Industrial Chemical MFG Co (Pvt)
Ltd. |
|
20-08-2015 |
Notice of Re-Schedule Hearing:
Bulk Supply
Tariff Petition for FY- 2015-16 filed by
WAPDA Hydroelectric for Approval/
Determination |
|
Petition filed by Wapda
Hydro Electric |
||
17-08-2015 |
Draft
NEPRA (Supply of Electric Power by
the Distribution Companies)
Regulations, 2015 for eliciting
comments and feedback from the public within
7 Days |
|
11-08-2015 |
Power Safety Code for
Transmission & Distribution Licensees 2015 |
|
11-08-2015 |
Decision of National Electric Power
Regulatory Authority in the matter of
Application of Jhimpir Power (Private)
Limited Opting for Upfront Tariff for Wind
Power Projects |
|
11-08-2015 |
Power Safety Code for
Transmission & Distribution Licensees 2015 |
|
11-08-2015 |
Notice of Hearing: Pertaining to
Licensee Modification of Transmission
Licence of National Transmission and
Despatch Company Limited (NTDC) |
|
Modification-II in Transmission Licence #
TL/01/2002 M/s. National Transmission &
Despatch Company Limited (NTDC) |
||
NEPRA
(Market Operator Registration, Standards and
Procedure) Rules, 2015 |
||
Commercial Codes
of CPPAG |
||
Comments from
Stakeholders pertaining to the Modification
of Transmission Licence of NTDC. |
||
11-08-2015 |
Notice of
Admission : Generation
License Application of Chanar Energy Limited |
|
Generation
License Application of Chanar Energy Limited |
||
10-08-2015 |
Decision of
National Electric Power Regulatory Authority
in the matter of Application of Hawa
Energy (Private) Ltd. Opting for Upfront
Tariff for Wind Power Projects |
|
07-08-2015 |
Decision of the Authority in the Matter of
Application for Unconditional Acceptance
of Bagasse Upfront Tariff filed by Al-Moiz
Industries Limited (AMIL) for its 36 MW
(Gross Capacity)New Bagasse Based
Cogeneration Power Plant,
Mianwali-Muzaffargarh (MM) Road, Adda Hameed
Kot, Mianwali, Punjab |
|
07-08-2015 |
Decision of the
Authority in the Matter of Application for
Unconditional Acceptance of Bagasse
Upfront Tariff filed by Chanar Energy
Limited (CEL) for its 22 MW (Gross Capacity)
New Bagasse Based Cogeneration Power Plant,
407, GB Pindi Sheikh Musa Road, Tehsil
Tandlianwala, District Faisalabad, Punjab |
|
07-08-2015 |
Decision of the
Authority in the Matter of Application for
Unconditional Acceptance of Bagasse
Upfront Tariff filed by Thal Industries
Corporation Limited (TICL) for its Plant-1 (Layyah
Sugar Mills) 41 MW (Gross Capacity) New
Bagasse Based Cogeneration Power Plant,
Karoor Road, Layyah, Punjab |
|
06-08-2015 |
Master Wind Energy Limited -
Application for Modification of the
Generation License |
|
04-08-2015 |
Revised Order of
National Electric Power Regulatory Authority
in the matter of Application of
Quaid-e-Azam Solar Power (Private) Limited
for Unconditional Acceptance of the
Upfront Tariff for 100 MW Solar PV Power
Plant |
|
03-08-2015 |
Decision of the Authority in the matter of
Fuel Charges Adjustment for the Month
of May 2015 for XWDISCOs along
with Notification Thereof |
|
03-08-2015 |
Notice of
Admission: Generation Licence
Application of A J Power (Pvt) Ltd |
|
Generation
License Application of AJ Power (Pvt)
Limited |
||
03-08-2015 |
Notice of
Admission: Generation Licence
Application of Chanar Sugar
Mills Limited |
|
Generation
License Application of Chanar Sugar
Mills Limited |
||
29-07-2015 |
Postponement
of Hearing in the Matter of Bulk Supply
Tariff Petition for Financial Year 2015-16
Filed by WAPDA Hydroelectric |
|
29-07-2015 |
VEHICLES FOR
AUCTION: National Electric Power Regulatory Authority
(NEPRA) invites sealed bids for sale of
vehicles and motorcycles on “As is where is
basis” |
|
24-07-2015 |
Performance
Evaluation Report of NTDC & K-Electric
(Comments if any may be emailed at miranjha@nepra.org.pk) |
|
22-07-2015 |
Notice of
Hearing - Hearings in the Matter of
Monthly Fuel Charges Adjustment of
K-Electric Limited for the Month of
April & May 2015 |
|
Tariff
Petition filed by K-Electric Limited regarding Monthly Fuel Cost
Adjustment (FCA) due to variation in Fuel
and Power Purchase Price for the Month of
April 2015 |
||
Tariff
Petition filed by K-Electric Limited regarding Monthly Fuel Cost Adjustment (FCA)
due to variation in Fuel and Power Purchase
Price for the Month of May 2015 |
||
22-07-2015 |
Notice of Admission:
Tariff Petition filed by Central
Power Generation Company Ltd (CPGCL) for
the Determination of Tariff for New 747 MW
(Gross) CCPP at Guddu in District Kashmore,
Sindh |
|
Tariff Petition on behalf of Central
Power Generation Company Limited (CPGCL)
GENCO-II |
||
15-07-2015 |
Generation
Licence : 52.10 MW Sindh Nooriabad Power Company (Pvt.) Limited |
|
15-07-2015 |
Generation
Licence : 52.10 MW Sindh Nooriabad Power Company
PHASE-II (Pvt.) Limited |
|
13-07-2015 |
Approval of National Electric Power
Regulatory Authority in the matter of
Application of Blue Star Electric
(Private) Limited for Unconditional
Acceptance of Upfront Tariff for 1 MW
Solar PV Power Plant |
|
13-07-2015 |
Approval of
National Electric Power Regulatory Authority
in the matter of Application of
Siddiqsons Energy Limited (SEL) for
Unconditional Acceptance of Upfront Coal
Tariff for 350 MW Coal Power Plant |
|
11-07-2015 |
Addendum: Notice of
Hearing in respect of Bulk Supply Tariff
petition for Financial Year 2015-16 filed by
WAPDA Hydroelectric |
|
Notice of Hearing:
Bulk Supply
Tariff Petition for FY- 2015-16 filed by
WAPDA Hydroelectric for Approval/
Determination |
||
Petition filed by Wapda
Hydro Electric |
||
11-07-2015 |
Hearing
regarding
Fuel Charges Adjustment
for the month of
May 2015
for
EX-WAPDA Distribution Companies |
|
Energy Purchase
Data for the Month of May 2015 |
||
10-07-2015 |
Determination of
the Authority in the matter of Tariff Petition filed
by China Machinery Engineering Corporation Power
(Pvt.) Ltd. for its 330 MW Local Coal Project in
Pind Dadan Khan, Salt Range, Punjab |
|
10-07-2015 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of April 2015 for
XWDISCOs along with Notification Thereof |
|
08-07-2015 |
NOTIFICATION (i.e. S.R.O.
650(j)/2015 dated 06-07-2015) Regarding NEPRA
Upfront Tariff for Solar PV Power Plants |
|
08-07-2015 |
Notice of Admission:
Generation Licence Application of Mughal Energy
Ltd (MEL) |
|
Application for
Generation License Mughal Energy Limited |
||
07-07-2015 |
Decision of the Authority in the matter of
Adjustment of Upfront Tariff for New Bagasse
Based Co-generation Projects |
|
02-07-2015 |
Corrigendum to SRO Nos.
199(1)/2015 dated 04.03.2015 and SRO No. 318(1)/2015
dated 14.04.2015 |
|
02-07-2015 |
Corrigendum
- Decision of the Authority in the matter of
Upfront Generation Tariff for
Imported/Local Coal Power Plants dated
26.06.2104 |
|
02-07-2015 |
Approval
of National Electric Power Regulatory
Authority in the matter of Application of
Harappa Soar (Private) Limited for
Unconditional Acceptance of Upfront Tariff
for 18 MW Solar PV Power Plant |
|
02-07-2015 |
Decision
of the Authority in the matter of Request
for Reconsideration regarding Decisions of
the Authority for Quarterly Adjustments
of Tariff for K-Electric Limited
(Formerly Karachi Electric Supply Company
Ltd.) for the Quarters ended December 2013,
March 2014, June 2014 and September 2014 |
|
30-06-2015 |
Generation
Licence : Appolo Solar Development
Pakistan Limited (ASDPL) 100MW Solar |
|
30-06-2015 |
Generation
Licence : Best Green Energy Pakistan Limited
(BGEPL) 100MW Solar |
|
30-06-2015 |
Generation
Licence : Crest Energy
Pakistan Limited (CEPL) 100MW Solar |
|
30-06-2015 |
Generation
Licence : Punjab Power Development Company
Limited ( Chianwali Hydropower Project
) |
|
30-06-2015 |
Generation
Licence : Punjab Power Development Company
Limited (
Deg-Out Fall Hydropower Project ) |
|
29-06-2015 |
Motion for
Leave for Review, under Rule 16 (6) of
the NEPRA (Standards & Procedures) Rules,
1998, read with Regulation 3 of NEPRA Review
(Procedure) Regulations, 2009, in Case No
NEPRA/TRF-271/NPGCL-2014
Decision Issued, dated April 14, 2015,
Determination of the Authority in the matter
of Tariff Petition filed by Northern
Power Generation Company Limited (NGPCL)
For the Determination of its Generation
Tariff |
|
28-06-2015 |
INVITATION TO
BID: Designing and Printing of NEPRA
Annual Report 2014-15 and State of Industry
Report 2015. |
|
TORs-
Designing and Printing of NEPRA Reports
2014-15 and State of Industry Report 2015 |
||
25-06-2015 |
Notice of
Admission: Generation Licence
Application of HARAPPA Solar (Pvt) Ltd
(HSPL) |
|
Application
for a Generation Licence for an 18.0 MW
Solar PV Power Generation Project by
Harappa Solar (Private) Limited |
||
24-06-2015 |
Decision
of the Authority in the Matter of Gas
Infrastructure Development Cess (GIDC) |
|
24-06-2015 |
Determination of
National Electric Power Regulatory Authority
in the Matter of Upfront Tariff for Wind
Power Generation |
|
24-06-2015 |
Decision of the
Authority in the matter of Fuel Charges
Adjustment for the Month of March
2015 for XWDISCOs along with
Notification Thereof |
|
24-06-2015 |
Finding of the
Authority on the issues framed for the
Consultative Session held on February 2,
2015 regarding regulation of entities
involved in re-sale/re-distribution of
electric power after obtaining one Point
Bulk Supply from Distribution Company |
|
Findings of
the Authority on the Issues Framed for
Consultative Session regarding Entities
Involved in RE-Sale/Re-Distribution of
Electric Power after obtaining one Point
Bulk Supply From Distribution Company held
on February 2, 2015. - Comments from
stockholder |
||
24-06-2015 |
Notice of
Admission regarding Petition
filed by ALKA Power (Pvt) for the
Determination of EPC Stage Generation Tariff
in Respect of 1.8 MW Hydel Power Project |
|
Petition
filed by ALKA Power (Pvt) for the
Determination of EPC Stage Generation Tariff
in Respect of 1.8 MW Hydel Power Project |
||
Issues
framed for hearing in the matter of EPC
Stage Tariff Petition filed by ALKA Power
(Pvt.) Limited (1.8 MW Hydel Power
Project) |
||
22-06-2015 |
Notice of
Admission/Public Hearing: Petition
filed by Lucky Cement Ltd (LCL) for
the determination of Tariff -16 MW Waste
Heat recovery Renewable Energy Power
Project. |
|
Petition
for Determination of Tariff — 16 MW Waste
Heat Recovery Renewable Energy Power Project
— Lucky Cement Ltd |
||
Hearing Issues
- Lucky Cement |
||
21-06-2015 |
Notice of
Admission: Petition filed by Wapda
Hydro Electric for revision of Tariff
for FY 2015-16 for Bulk Supply of Power from
Wapda Hydel Power Stations |
|
Petition filed by Wapda
Hydro Electric |
||
21-06-2015 |
Hearing
regarding
Fuel Charges Adjustment
for the month of April 2015 for
EX-WAPDA Distribution Companies |
|
Energy Purchase
Data for the Month of April 2015 |
||
17-06-2015 |
Decision of the
Authority in the matter of Upfront Tariff
for New Bagasse Based Co-generation Projects
- Extension for Date of Acceptance of
Upfront Tariff |
|
17-06-2015 |
PREQUALIFICATION DOCUMENTS
Tender No. 06/2015 Hiring of Contractor
for Janitorial Services |
|
16-06-2015 |
Decision of the Authority in the
matter of Motion for Leave for Review
filed by Faisalabad Electric Supply Company
Ltd. (FESCO) against the Authority
Determination dated March 10, 2015
pertaining to the FY 2014-15 |
|
16-06-2015 |
Decision
of the Authority in the matter of Motion
for Leave for Review filed by Peshawar
Electric Supply Company Ltd. (PESCO)
against the Authority Determination dated
March 10, 2015 pertaining to the FY 2014-15 |
|
16-06-2015 |
Decision
of the Authority in the matter of Motion
for Leave for Review filed by Multan
Electric Power Company Ltd. (MEPCO)
against the Authority Determination dated
March 27, 2015 pertaining to the FY 2014-15 |
|
16-06-2015 |
Decision
of the Authority in the matter of Motion
for Leave for Review filed by Gujranwala
Electric Power Company Ltd. (GEPCO)
against the Authority Determination dated
March 20, 2015 pertaining to the FY 2014-15 |
|
16-06-2015 |
Decision
of the Authority in the matter of Motion
for Leave for Review filed by Sukkur
Electric Power Company Ltd. (SEPCO)
against the Authority Determination dated
April 14, 2015 pertaining to the FY 2014-15 |
|
15-06-2015 |
Notification
of DISCOs (SRO.575(I)2015) regarding Request
for Reconsideration of Tariff Determinations
for the Ex-WAPDA Distribution
Companies for the Financial Year 2014-15
under Section 31(4) of NEPRA Act, 1997 |
|
15-06-2015 |
Notice of
Admission regarding Distribution Licence
Application of Defence Housing Authority
Lahore Phase-XII EME Sector (DHA) |
|
Application
for Distribution License for Defence
Housing Authority Lahore Phase-XII EME
sector Lahore |
||
15-06-2015 |
Notice of
Admission regarding Generation Licence
Application of Khairpur Sugar Mills Ltd (KSML) |
|
Application
for Power Generation License 11 MW Power
Plant for Khairpur Sugar Mills Pvt.
Limited. |
||
13-06-2015 |
Notice of
Hearing in the matter of GAS
Infrastructure Development CESS (GIDC) |
|
Lahore High
Court Order dated 04-06-2015 |
||
12-06-2015 |
Notification
of DISCOs SRO No. 566 (I)/2015 to SRO
No. 575(1)/2015 dated 12-06-2015 |
|
12-06-2015 |
Saba Power
Company (Pvt) Ltd Motion for Leave
for review against the Tariff
Determination Dated May 12th, 2015 |
|
12-06-2015 |
Lalpir
Power Ltd Motion for Leave for
review against the Tariff Determination
Dated 31 March 2015 |
|
12-06-2015 |
PAKGEN
Power Ltd Motion for Leave for
review against the Tariff Determination
Dated 31 March 2015 |
|
10-06-2015 |
Generation
Licence No. IGSPL/59/2015 granted
to CMEC Power (Pvt.) Limited |
|
10-06-2015 |
Generation
Licence No. IGSPL/60/2015 granted
to Huaneng Shandong Ruyi (Pakistan)
Energy (Pvt.) Limited |
|
10-06-2015 |
Decision
of the Authority in the matter of
K-Electric Limited (formerly Karachi
Electric Supply Company Limited) Request for
Quarterly Adjustment in its Tariff for the
Quarter Ended December 2014 |
|
10-06-2015 |
UCH-II Power (Pvt)
Ltd Motion for Leave for Review i.r.o
National Electric Power Regulatory Authority
Decision dated April 22, 2015 |
|
09-06-2015 |
Decision
of
the Authority in the matter of a Request
for Reconsideration of Tariff Determinations
for the Ex-WAPDA Distribution
Companies for the Financial Year 2014-15
under Section 31(4) of NEPRA Act, 1997 |
|
08-06-2015 |
Power Acquisition
Request in relation to FFBL Power Company
Ltd submitted by K-Electric Limited |
|
05-06-2015 |
Notice of
Hearing - Hearings in the Matter of
Monthly Fuel Charges Adjustment of
K-Electric Limited (Formerly KESCL) for
the Month of March, 2015 as well as
Quarterly Adjustment for the Quarter
January-March, 2015 |
|
Revised Monthly
Fuel Cost Adjustment (FCA) Due to Variation
in Fuel and power Purchase Price for the
Month of March 2015 |
||
Adjustment in
K-Electric Schedule of Tariff on Account of
Fuel Price and Power Purchase cost variation
for quarter ended March 2015 |
||
05-06-2015 |
Notice of
Hearing Tariff Petition filed by
K-Energy Private Ltd for determination
of Tariff for 421.90 MW (Gross) Coal
Conversion Project of Unit 3&4 of BQPS-I at
Bin Qasim Karachi |
|
Petition for Determination of Tariff — 421.90
MW Coal Conversion Project of BOPS-1 at Bin
Qasim, Karachi K-Energy (Pvt.) Ltd.
(KEPL) |
||
05-06-2015 |
Notice of
Admission for Generation Licence
Application of CTGIWK Cholistan Solar
Power Project (Pvt) Lts (CWCSP) |
|
Generation Licence
Application of CTGIWK Cholistan Solar
Power Project (Pvt) Lts (CWCSP) |
||
05-06-2015 |
Notice of
Admission for Generation Licence
Application of Siddiqsons Energy Ltd
(SEL) |
|
Generation Licence
Application of Siddiqsons Energy Ltd
(SEL) |
||
04-06-2015 |
Notice of
Admission / Hearing in the matter of
Power Acquisition Request (PAR) filed by
K-Electric under NEPRA interim Power
Procurement (Procedure & Standards)
Regulations 2005 for purchase of 52 MW
Power (Coal Fired) from FFBL Power
Company Ltd |
|
03-06-2015 |
Application
for the Grant of Generation License
50MW Wind Power Project Western Energy
(Private) Limited at Jhimpir, District
Thatta, Sindh |
|
02-06-2015 |
Commercial Code of CPPA-G |
|
02-06-2015 |
Draft NEPRA
(Interconnection facilities for Renewable
Generation facilities) Guidelines, 2015 for
comments / views / input of the stakeholders |
|
NEPRA (Interconnection
Facilities for Renewable Generation
Facilities) Guidelines, 2015 |
||
29-05-2015 |
Approval of
Power Acquisition Request filed by
National Transmission and Despatch Company
Ltd. (NTDC) for Import of Power 1000 MW
from TAVANIR, Iran under the NEPRA
Interim Power Procurement |
|
29-05-2015 |
Modification-II in Transmission
Licence # TL/01/2002 M/s. National
Transmission & Despatch Company Limited
(NTDC) |
|
29-05-2015 |
Notice of
Admission: Generation Licence
Application of Western Energy (Pvt) Ltd |
|
29-05-2015 |
Notice of
Admission: Tariff Petition filed by
K-Energy Private Ltd for determination
of Tariff for 421.90 MW (Gross) Coal
Conversion Project of Unit 3&4 of BQPS-I at
Bin Qasim Karachi |
|
Petition for Determination of Tariff — 421.90
MW Coal Conversion Project of BOPS-1 at Bin
Qasim, Karachi K-Energy (Pvt.) Ltd.
(KEPL) |
||
29-05-2015 |
National Electric
Power Regulatory Authority (Market
operator Registration, Standards and
Procedure) Rules, 2015 |
|
28-05-2015 |
Request for proposals (RFP)
Hiring of services of category 'A' Chartered
Accountants firms in the panel of auditors
of SBP/NEPRA to carry out annual audit of
Nepra Accounts for the Financial Year Ending
June 30, 201 |
|
28-05-2015 |
Notice of
Hearing Regarding Fuel Charges
Adjustment for the month of March 2015 for Ex-WAPDA Distribution
Companies |
|
Energy Purchase Data for the Month of March
2015 |
||
28-05-2015 |
Notice of
Hearing: Tariff Petition filed by
Karot Power Company for Determination of EPC Stage Generation Tariff
i.r.o 720 MW Karot Hydropower Projects |
|
28-05-2015 |
Notice of
Hearing: Tariff Petition filed by
Japan Power Generation Limited |
|
28-05-2015 |
Notice of Hearing:
Tariff Petition filed by Southern Electric Power Company Limited (SEPCOL) |
|
26-05-2015 |
Corrigendum - Determination of the
Authority in the matter of Petition filed by Gujranwala Electric Power
Company Ltd. (GEPCO) for the Determination of its Consumer end Tariff
Pertaining to FY 2014-2015 |
|
26-05-2015 |
Approval of
National Electric Power Regulatory Authority
in the matter of Application of Appolo
Solar Development Pakistan Limited for
Unconditional Acceptance of Upfront
Tariff for 100 MW Solar PV Power Plant |
|
26-05-2015 |
Approval of
National Electric Power Regulatory Authority
in the matter of Application of Best
Green Energy Pakistan Limited for
Unconditional Acceptance of Upfront
Tariff for 100 MW Solar PV Power Plant |
|
26-05-2015 |
Approval of
National Electric Power Regulatory Authority
in the matter of Application of Crest
Energy Pakistan Limited for
Unconditional Acceptance of Upfront
Tariff for 100 MW Solar PV Power Plant |
|
26-05-2015 |
Decision of
National Electric Power Regulatory Authority
in the matter of Application of Sapphire
Wind Power Company Limited Opting for
Upfront Tariff for Wind Power Projects |
|
26-05-2015 |
Motion for Leave
for Review Quaid-e-Azam Thermal Power
(Pvt.) Ltd. |
|
26-05-2015 |
Corrigendum:
Motion for Leave for Review in the matter of
Upfront Tariff for RLNG |
|
Notice of Hearing: Motion for Leave for Review in the matter of Upfront
Tariff for RLNG New Power Projects dated
03-04-2015 of RFO based Power Plant of 117
MW |
||
Ministry of Water
and Power Review Motion in the matter
of Upfront Tariff for RLNG Based Power
Plants |
||
25-05-2015 |
Decision of the
Authority in the Matter of Motion for
Leave for Review filed against the
Determination of the Authority dated
22.01.2015 regarding Upfront Generation
Tariff for Solar PV Power Plants |
|
25-05-2015 |
Notice of
Admission/Hearing Request for
Reconsideration of Tariff Determination for
the Ex-WAPDA Distribution Companies for the
Financial Year 2014-15 under Section 31 of
Regulation, Generation, Transmission and
Distribution of Electric Power Act, 1997
(the "Act") read with Rule 17 of the NEPRA
Tariff (Standards and Procedures) Rules,
1998 |
|
Request for
Reconsideration of Tariff Determination for
the Ex-WAPDA Distribution Companies for the
Financial Year 2014-15 under Section 31 of
Regulation, Generation, Transmission and
Distribution of Electric Power Act, 1997
(the "Act") read with Rule 17 of the NEPRA
Tariff (Standards and Procedures) Rules,
1998 |
||
22-05-2015 |
Notice:
Licensee Proposed Modification (LPM) in the
Generation Licence of Lotte Powergen (Pvt)
Ltd |
|
License Proposed
Modification (LPM) Application
Lotte Powergen (Private) Limited |
||
20-05-2015 |
Application for the Generation
Licence for Master Power (Pvt.) Ltd. |
|
19-05-2015 |
Motion for Leave for Review—
against the decision issued by NEPRA October 16, 2014 in
respect of 640MW Azad Pattan Hydropower Project (Case
# NEPRA/PAR-107) |
|
18-05-2015 |
EPC Stage Tariff petition
filed by 720 MW Karot Hydro Power Project |
|
Issues framed for hearing in the matter of EPC Stage
Tariff Petition filed by Karot Power Company (Pvt) Limited (720
mw Karot Hydropower Project) |
||
Notice of Admission/Public
Hearing Petition filed by Karot Power Company )Pvt) Ltd
for the Determination of EPC Stage Generation Tariff i.r.o
720 MW Karot Hydro Power Project |
||
18-05-2015 |
Motion for Leave for Review
filed by KATHAI-II HYDRO (PVT.) LIMITED in Relation
to the Determination of NEPRA in the Matter of Upfront
Tariff for Small Hydro Power Generation Projects - Case
No. NEPRA/UTH-01/4744-4746 dated April 2, 2015 (the
"Determination) |
|
18-05-2015 |
Motion for Leave for Review
filed by Riali Hydro Power Company (Pvt) Ltd in
relation to the determination of NEPRA in the matter of
Upfront Tariff for Small Hydro Power Generation Projects
- Case No. NEPRA/UTH-01/4744-184746 dated April 2, 2015 (the
"Determination) |
|
14-05-2015 |
Application for Modification of NTDC Transmission
Licence No. TL/01/2002 by National Transmission And
Despatch Company Limited (NTDC) |
|
Notice Licensee Proposed
Modification (LPM) in the Transmission Licence of National Transmission And
Despatch Company Limited (NTDC) |
||
12-05-2015 |
Determination of the
Authority in the matter of Licensee Proposed Modification
of Dadu Energy (Pvt) Limited |
|
12-05-2015 |
Determination of the
Authority in the matter of Licensee Proposed Modification
of Naudero Energy (Pvt) Limited |
|
29-04-2015 |
Notice
of Public Hearing
in the matter of Tariff Petition Filed by Northern Power
Generation Company Ltd for Determination of Generation
Tariff of 1472.52 MW at Muzaffargarh, GTPS Faisalabad & SPS
Faisalabad of NPGCL |
|
Petition for revised Generation Tariff Northern Power
Generation Company Limited (GENCO-III) |
||
29-04-2015 |
Notice of Admission/Public
Hearing for Determination of Tariff i.r.o 330 MW
Coal Fired Power Plant at Pind Dadan Khan |
|
Tariff Petition filed by China Machinery
Engineering Corporation i.r.o a Local Coal Fired Power Project of
1x300 MW (NET) in Pind Dadan Khan, Salt Range, Punjab |
||
29-04-2015 |
Notice of Admission/Public
Hearing for Determination of Feasibility Stage
Generation Tariff i.r.o 20 MW Run of River Lucky Hydropower
Project |
|
Tariff Petition filed by
Olympus Energy (Pvt) Ltd (OEPL) for the Determination of
Feasibility Stage Generation Tariff i.r.o 20 MW
Run of River Lucky Hydropower Project |
||
29-04-2015 |
Application for licensee technology change in Generation
License. license no. SPGL/06/2014 dated 26th june, 2014,
BUKSH
SOLAR |
|
29-04-2015 |
Application for
requesting License Proposed Modification upto 40 MW
Generation for Hi-Tech Pipes & Engineering Industries
at plot no. X-22 SITE Area Kotri (District Jamshoro) Sindh. |
|
29-04-2015 |
Tariff Petition filed by
China Machinery Engineering Corporation i.r.o a Local
Coal Fired Power Project of 1x300 MW (NET) in Pind
Dadan Khan, Salt Range, Punjab |
|
24-04-2015 |
Generation Licence No. SGC/111/2015 Licence
Application No. LAG-281 FFBL Power Company Limited |
|
24-04-2015 |
Modification-I in Generation Licence No. WPGL/18/2012 —
Sapphire Wind Power Company Limited (SWPCL) |
|
24-04-2015 |
Modification-I in Generation Licence No.
WPGL/27/2014 — NBT Wind Power Pakistan III (Pvt.) Limited
(NBTWPPPL-III) |
|
24-04-2015 |
Notice of Hearing - Hearing in the
Matter of Monthly Fuel Charges Adjustment of K-Electric Limited
(Formerly KESCL) for the Month of February, 2015 |
|
K-Electric Limited Revised Monthly
Fuel Cost Adjustment (FCA) due to Variation in Fuel and Power Purchase
Price for the Month of February 2015 |
||
23-04-2015 |
Determination of the Authority in the matter
of Petition filed by National Transmission & Despatch
Company Ltd. (NTDC) for Determination of Its
Transfer/Wheeling Charges for the FY 2014-15 |
|
23-04-2015 |
Notice
of Public Hearing
- in the matter of Application of Fatima Transmission Company Limited
for Grant of Special Purpose Transmission Licence. (Copy
of Notice of Admission published on 03-03-2015) |
|
List of Issues Framed for the Proposed Hearing to
be Held in the Matter of Application of Fatima Transmission Company
Limited for the Consideration of Special Purpose Transmission
Licence |
||
Application of Fatima Transmission Company Limited for
Grant of Special Purpose Transmission Licence. |
||
22-04-2015 |
Generation Licence No. SGC/110/2015 - Licence Application
No. LAG-284 Ramzan Energy Limited |
|
22-04-2015 |
Postponement of Hearing - Tariff
Petition filed by Punjab Power Development Corporation (PPDCL) in respect of
5.38 MW Chianwali Hydropower Project |
|
22-04-2015 |
Postponement of Hearing - Tariff
Petition filed by Punjab Power Development Corporation (PPDCL) in respect of
4.04 MW Deg-Outfall Hydropower Project |
|
22-04-2015 |
Decision of the Authority in the
matter of Fuel Charges Adjustment for the Month of February 2015 for
XWDISCOs along with Notification Thereof |
|
17-04-2015 |
Tariff petition filed by PPDC in respect
of 4.04 MW DEG Outfall Hydropower Project |
|
17-04-2015 |
Notice of Admission - Japan Power Generation Limited |
|
Tariff Petition filed by Japan Power
Generation Limited for Tariff Modification of RFO base Power Plant 0f
135 MW (gross) at JIA Bagga off Raiwind Road Lahore |
||
17-04-2015 |
Notice of Admission - Southern Electric Power Company Limited |
|
Tariff Petition filed by Southern
Electric Power Company Limited for Tariff Modification of RFO base Power
Plant of 117 MW at 23 km Raiwind Road Lahore |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of Cresent
Energy |
|
Application for
Generation Licence for 100 MW Solar PV Power Generation Project Cresent
Energy |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of ELBEL Green Energy |
|
Application for Generation Licence for 100 MW
Solar PV Power Generation Project ELBEL Green Energy |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of BEST
GREEN Energy |
|
Application for
Generation Licence for 100 MW Solar PV Power Generation Project BEST
GREEN Energy |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of Apollo Solar Development |
|
Application for Generation Licence for 100 MW
Solar PV Power Generation Project Apollo Solar Development |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of Flare
Solar Development |
|
Application for
Generation Licence for 100 MW Solar PV Power Generation Project Flare
Solar Development |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of High Flying Solar
Development |
|
Application for Generation Licence for 100 MW
Solar PV Power Generation Project High Flying Solar Devemt: |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of King
Rider Solar Development |
|
Application for
Generation Licence for 100 MW Solar PV Power Generation Project King
Rider Solar Devemt: |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of Golden Eye Solar Development |
|
Application for Generation Licence for 100 MW
Solar PV Power Generation Project Golden Eye Solar Devemt: |
||
17-04-2015 |
Notice of Admission
- Generation Licence Application of Indigo
Solar Development |
|
Application for
Generation Licence for 100 MW Solar PV Power Generation Project Indigo
Solar Development |
||
14-04-2015 |
Determination of the Authority in the matter of Tariff Petition filed by
Northern Power Generation Company Ltd. (NPGCL) for the Determination of its
Generation Tariff |
|
14-04-2015 |
Determination of the Authority
in the matter of Petition filed by
Sukkur Electric Supply Company Ltd. (SEPCO)
for the Determination of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
13-04-2015 |
Decision of the Authority in
the matter of Fuel Charges Adjustment for the Month of January
2015 for K-Electric Limited and Notification (S.R.O. 307(1)/2015
dated 13.04.2015) Thereof |
|
12-04-2015 |
Notice of Admission/
Public Hearing
- Petition filed by Punjab Power Development Company Limited (PPDCL)
for the Determination of EPC stage Generation Tariff in respect of 5.38 MW
Run of Canal Chianwali Hydropower Project. |
|
Petition for Determination of EPC Stage Tariff
for Chianwali Hydropower Project |
||
10-04-2015 |
Notice of Admission -
Tariff Petition filed by China Machinery Engineering Corporation (CMEC)
for Approval /Determination of Tariff for 300 MW Coal Firled Power Plant
at Pind Dadan Khan of Salt Range, Punjab |
|
China Machinery Engineering Corporation
Petition for Tariff Determination in respect of a local coal fired power
project of 1x300 MW (Net) in Pind Dadan Khan, Salt Range, Punjab |
||
10-04-2015 |
Decision of the Authority in
the Matter of Adjustment in Insurance
Component of Capacity Charge Part of Tariff
for FFC Energy Limited (FFCEL) |
|
09-04-2015 |
Decision of the Authority in
the matter of Request filed by National Transmission and Despatch Company
Ltd. (NTDC) for approval of Power Procurement and Negotiated Advance Tariff
at Feasibility Stage for 1100 MW Kohala Hydropower Project. |
|
07-04-2015 |
Notice of Admission
- Generation Licence Application of Huaneng Shadong Ruyi (Pakistan)
Energy (Private) Limited (HSRPL) |
|
Application for
Generation License of Huaneng Shadong Ruyi (Pakistan) Energy (Private)
Limited (HSRPL) for its 2 x 660 MW Imported Coal Fired Power Project at
Sahiwal Pakistan |
||
07-04-2015 |
Determination of the Authority in the matter of Utilization
of Existing Available Generation Capacity - Policy for Short Term
Independent Power Producers (STIPPs) |
|
07-04-2015 |
Determination of the Authority
in the matter of Petition filed by Quetta Electric Supply Company Ltd. (QESCO)
for the Determination of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
07-04-2015 |
Determination of the Authority in the matter of Petition
filed by Hyderabad Electric Supply Company Ltd. (HESCO) for the
Determination of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
05-04-2015 |
Invitation to Bid - NEPRA Tender No.
04/2015 for Supply of Stationery Item, Toner Cartridges and Printed
Material |
|
05-04-2015 |
Notice of Hearing - Hearing Regarding Fuel Charges Adjustment
for the Month of February 2015 for EX-WAPDA Distribution Companies |
|
NTDC- CPPA
Energy Purchase Data for the Month of February 2015 |
||
05-04-2015 |
Notice of Admission - Generation Licence Application of Punjab
Power Development Company Limited (PPDCL) |
|
Punjab
Power Development Company Limited (PPDCL) 5.38 MW Chianwali Hydropower
Project, Gujranwala- Application for Generation License |
||
05-04-2015 |
Notice
- Licencsee Proposed Modification (LPM) in the Generation Licence of
Fatima Energy Limited (FEL) |
|
Fatima Energy Limited — Application for
Modification of the Generation License |
||
03-04-2015 |
Notice of Hearing
- Development and Determination of Upfront Tariff for Wind Power
Generation Project |
|
Component
Wise Details for Proposed Upfront Tariff for Wind Power Projects both
on Local and Foreign Financing |
||
03-04-2015 |
Determination of the Authority in the Matter of
Upfront Tariff for RLNG Based Power Plants |
|
02-04-2015 |
Modification-VI in respect of Generation Licence No.
GL/04/2002 granted to K-Electric Limited for De-Commissioning of
Units which have Outlived their useful lives |
|
02-04-2015 |
Determination of National Electric Power Regulatory
Authority in the Matter of Upfront Tariff for Small Hydro
Power Generation Projects Upto 25 MW Installed Capacity |
|
02-04-2015 |
Corrigendum - Decision of the Authority in the matter
of K-Electric Limited Fuel Charges Adjustment for the Month of
December 2014 issued vide letter No. NEPRA/TRF-133/KESC-2009/4355-60
dated March 30, 2015 and Notification (S.R.O. 249(1)/2015 dated 27.03.2015)
Thereof |
|
01-04-2015 |
Notice of Admission/
Hearing Tariff Petition filed by Mekotex (Private) Limited
for Determination of Tariff of Gas based Captive Power Plant of 5.0 MW
at Jamshoro, Sindh |
|
Petition for Tariff
Determination on Behlaf of Mekotex (Private) Limited for a Power Project of Approximately 5.0 MW |
||
01-04-2015 |
Notice of Admission/ Public Hearing -
Hearing in the Matter of Tariff Petition filed by Fmicotex Industries
(Private) Limited for Determination of Tariff for 35.538 MW Power
Project. |
|
Petition for Tariff Determination of
Fmicotex Industries (Private) Limited for 35.538 MW Power Project. |
||
30-03-2015 |
Decision of the Authority in the matter of Fuel
Charges Adjustment for the Month of January 2015 for XWDISCOs
along with Notification Thereof |
|
29-03-2015 |
Notice of Hearing - Tariff Petition filed by Lakhra Power
Generation Company Limited for Determination of Tariff of Coal Power
Plant at Sehwan/ Dadu Road, Lakhra |
|
Tariff Petition filed by Lakhra Power
Generation Company Limited for Determination of Tariff of Coal Power
Plant at Sehwan/ Dadu Road, Lakhra |
||
29-03-2015 |
Notice of Admission/ Public Hearing -
Petition filed by Tribal Area
Electric Supply Company Limited (TESCO) for the Determination of its
Consumer-end Tariff Pertaining to the FY 2014-15 based on the Actual/
Estimated Results of the FY 2013-14 as Test Year |
|
TESCO Tariff Petition for
Determination of Consumer end Tariff for FY 2014-15 |
||
29-03-2015 |
Notice of Admission - Generation Licence Application of Lucky
Electric Power Company Limited (LEPCL) |
|
Application for a Grant of Generation License,
- Lucky Electric Power Company Limited (LEPCL) |
||
29-03-2015 |
Notice - Licensee Proposed Modification (LPM) in the
Generation Licence of Sitara Energy Limited (SEL) |
|
Modification of Generation Licence No. SGC/012/2002 of
Sitara Enemy Limited (SEL) |
||
29-03-2015 |
Addendum to the Notice of Licence
Proposed Modification (LPM) in the Generation Licence of ICI Pakistan
Powergen Ltd (ICIPPGL) |
|
Notice
- Licensee Proposed Modification (LPM) in the Generation Licence of ICI
Pakistan Powergen Limited (ICIPPGL) |
||
Application for a Modification In
Generation License # 003/SGC/2001 - ICI Pakistan Powergen Limited (ICIPPGL) |
||
29-03-2015 |
Notice - Licensee Proposed Modification (LPM) in
the Generation Licence of Mekotex (Private) Limited (MPL) |
|
Application for Licence Proposed
Modification in Licence No. SCC/47/2009-Mekotex
(Private) Limited (MPL) |
||
29-03-2015 |
Notice - Licensee Proposed Modification (LPM) in the
Generation Licence of Gadoon Textile Mills Limited (GTML) |
|
Application for
Modification in Generation License No. 5GC/91/2013 of 46.57 MW to 56.47 MW
of Gadoon Textile Mills Limited
(GTML) |
||
29-03-2015 |
NEPRA Tender No. 03/2015
- INVITATION TO BID (Supply of UPs) |
|
Terms & Conditions -
Purchase of 01 UPS (16 KVa) for Datacenter Servers and 19 Nos. UPSs (1
KVa) for Individual’s Desktop Computers/Datacenter Switches/Wi-Fi
Routers |
||
27-03-2015 |
Determination of the Authority in the matter of Petition
filed by Multan Electric Power Company Ltd. (MEPCO) for the
Determination of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
20-03-2015 |
Determination of the
Authority in the matter of Petition filed by Gujranwala Electric Power
Company Ltd. (GEPCO) for the Determination of its Consumer end Tariff
Pertaining to FY 2014-2015 |
|
20-03-2015 |
Generation Licence No. IGSPL/52/2015 - Licence Application No. LAG-278 -
Bandhi PowerEen Company (Pvt.) Limited |
|
20-03-2015 |
Generation Licence No. IGSPL/51/2015
- Licence Application No. LAG-277 - Ansari Powergen Company (Pvt.)
Limited |
|
20-03-2015 |
Generation
Licence No. IGSPL/50/2015 - Licence Application No. LAG-276 - TAY
Power2en Company (Pvt.) Limited |
|
20-03-2015 |
Determination of the Authority in the matter of Petition
filed by Lahore Electric Supply Company Ltd. (LESCO) for the
Determination of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
19-03-2015 |
Approval of National Electric
Power Regulatory Authority in the matter of Application of Quaid-e-Azam
Solar Power (Private) Limited for Unconditional Acceptance of Upfront
Tariff for 100 MW Solar PV Power Plant |
|
13-03-2015 |
Determination of the Authority in the matter of
Generation Licence of K-Energy (Pvt.) Limited (KEPL) along
with Generation Licence No. IGSPL/48/2015 |
|
13-03-2015 |
Decision of the
Authority regarding Bank Collection Charges of Rs.8/- Charged by
K-Electric Limited (formerly KESC) |
|
13-03-2015 |
Hearing in the
Matter of Monthly Fuel Charges Adjustment of K-Electric Limited
(Formerly KESCL) for the Month of January 2015 |
|
Revised Monthly Fuel Cost Adjustment (FCA) due to Variation in Fuel and
Power Purchase Price for the Month of January 2015 |
||
12-03-2015 |
Hearing
Regarding Fuel Charges Adjustment for the Month of January 2015 for
Ex-WAPDA Distribution Companies. |
|
NTDC Energy Purchase Data
for the Month of January 2015 |
||
12-03-2015 |
Notice - Licence
Proposed Modification (LPM) in the Generation Licence of China Sunec
Energy (Private) Limited (CSEPL) |
|
Licensee Proposed Modification in Generation Licence
No. WPGL/29/2014 of China Sunec Energy (Private) Limited |
||
10-03-2015 |
Determination of the Authority in the matter of Petition
filed by Peshawar Electric Supply Company Ltd. (PESCO) for the Determination
of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
10-03-2015 |
Determination of the Authority in the matter of Petition
filed by Islamabad Electric Supply Company Ltd. (IESCO) for the
Determination of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
10-03-2015 |
Determination of the Authority in the matter of Petition
filed by Faisalabad Electric Supply Company Ltd. (FESCO) for the
Determination of its Consumer end Tariff Pertaining to FY 2014-2015 |
|
04-03-2015 |
Decision of the Authority
in the matter of Fuel Charges Adjustment for the Month of December
2014 for XWDISCOs along with Notification Thereof |
|
04-03-2015 |
Draft XWDISCOs
Commercial Procedure Manual for comments
from stakeholders |
|
03-03-2015 |
Notice of
Admission / Public Hearing - Request filed by
National Transmission & Despatch Company (NTDC) for approval of
Negotiated EPC Stage Tariff
|
|
NTDC for Engineering, Procurement and
Construction of (EPC) stage Tariff Petition for 100 MW Gulpur
Hydro Power Project. |
||
03-03-2015 |
Notice of Admission - Generation
licence application of Punjab Power
Development Company Limited (PPDCL)
|
|
Application for
Generation Licence of PPDCL 4.04 MW
Deg-outfall
Hydropower Project, Sheikhupura |
||
03-03-2015 |
Notice of
Admission - Application for grant of special purpose
transmission license Fatima Transmission Company Limited |
|
Petition for grant of Special Purpose
Transmission Licence on Belf of Fatima Transmission Company Ltd. |
||
03-03-2015 |
Notice of Admission - Generation
licence application of Hytex Energy
(Private) Ltd (HEPL)
|
|
Application for the Generation
Licence for Hytex Energy (Pvt.) Ltd. |
||
03-03-2015 |
Notice of
Admission - Generation licence application of China Machinery
Engineering Corporation (CMEC)
|
|
Application for Generation Licence of
China Machinery
Engineering Corporation (CMEC) |
||
01-03-2015 |
Hearing in
the matter of power acquisition request
(PAR) filed by National Transmission
& Dispatch Company (NTDC)
for import of 1000 MW Power from Iran under
Interim Power Procurement (Standard &
Procedure) Regulations - 2005
|
|
28-02-2015 |
Re-Scheduling of
Hearing - Revised tariff petition filed by Zephyr Power (Pvt)
Limited for determination of reference generation tariff for 50
MW Wind Power Project at Gharo, Thatta, Sindh
|
|
28-02-2015 |
Notice of Admission/ Hearing
- Request filed by
National Transmission & Dispatch Company (NTDC)
for approval of Negotiated EPC Stage Tariff |
|
25-02-2015 |
Hearing in the Matter of
Monthly Fuel Charges Adjustment of K-Electric Limited (Formerly
KESCL) for the Month of December, 2014 as well as Quarterly
Adjustment for the Quarter October - December 2014 |
|
K-Electric (KE) monthly Fuel Cost
Adjustment (FCA) due to Variation in Fuel and Power Purchase Price
for the Month of December 2014 |
||
Adjustment in K-Electric (KE)
Schedule of Tariff on Account of Fuel Price and Power Purchase Cost
Variation for Quarter ended December 2014 |
||
25-02-2015 |
Notice -
Licence Proposed Modification (LPM) in the
Generation Licence of Nishat Mills
Limited (NML) |
|
Application
for Modification of Genertaion Licence
by Nishat Mills Limited in respect of
Its Three Existing Plants and Three New
Plants |
||
25-02-2015 |
Notice of Admission - Generation
Licence Application of Data Hydropower (Pvt.) Limited (DHPL) |
|
Data Hydropower (Pvt.) Limited (DHPL)
Application for a Generation Licence |
||
25-02-2015 |
Addendum to the
Notice of Admission Pertaining to the Application of Sindh Nooriabad Power
Company Phase -II (Pvt.) Limited for the
Grant of Generation Licence |
|
Generation Licence Application of Sind
Nooriabad Power Company Phase-II (Pvt) Limited (SNPCL-II) |
||
25-02-2015 |
Addendum to the Notice of Admission
Pertaining to the Application of Sindh Nooriabad Power Company
(Pvt.) Limited for the Grant of Generation Licence |
|
Generation
Licence Application of Sind Nooriabad
Power Company (Pvt) Limited (SNPCL) |
||
19-02-2015 |
Postponement of
Hearing
- Revised Tariff Petition Filed By Zephyr Power (Pvt)
Limited
For Determination Of Reference Generation
Tariff For 50 Mw Wind Power Project At Gharo,
Thatta, Sindh |
|
13-02-2015 |
Approval of National
Electric Power Regulatory Authority in the matter of Application of
Port Qasim Electric Power Company (Private) Limited (PQEPCPL)
for Unconditional Acceptance of Upfront Coal Tariff for 2x660
MW Coal Power Plant |
|
13-02-2015 |
Approval of National
Electric Power Regulatory Authority in the
matter of Application of Grange Power
Limited (GPL) for Unconditional
Acceptance of Upfront Coal Tariff for
150 MW Coal Power Plant |
|
13-02-2015 |
Notice of Hearing - Development of
Upfront Tariff for Short-term Independent Power Producers (STIPPS)
- Utilization of the Existing Available Generation Capacity |
|
13-02-2015 |
Notice of Hearing - Development
of upfront Tariff for New Generation Capacity Addition on
RLNG |
|
Summary of Upfront
Tariff for RLNG based Power Projects |
||
13-02-2015 |
Corrigendum - Generation Licence
Application of Engro Powergen Thar (Pvt.) Limited (EPGTPL) |
|
12-02-2015 |
Re-scheduling of
Hearing
-
Fuel Charges Adjustment for the month of December 2014 For EX-WAPDA
Distribution Companies |
|
01-02-2015 |
Re-Scheduling of
Hearing - Revised Tariff Petition filed by Zephyr Power (Pvt.)
Limited for Determination of Reference Generation Tariff for 50MW
Wind Power Project at Gharo, Thatta, Sindh |
|
27-01-2015 |
Notification of Authority's Decisions
Regarding Suo Moto Proceedings for Revision/ Modification of Fuel
Cost Component Indexation Mechanism Provided in Various Authority's
Decisions Regarding Approval of PARs Filed by DISCOs for Purchase of
Power from Bagassee Based Power Plants. |
|
27-01-2015 |
Notification (i.e. S.R.O.
51(I)/2015 dated 20-01-201) Regarding NEPRA, Thar Coal Upfront
Tariff |
|
27-01-2015 |
Notification (i.e. S.R.O.
50(I)/2015 dated 20-01-201) Regarding Chakothi Hattian Hydropower
Project |
|
27-01-2015 |
Notice of Hearing - Hearing
Regarding Fuel Charges Adjustment for the Month of December 2014 for
EX-WAPDA Distribution Comapnies. |
|
NTDC Energy
Purchase Data for the Month of December 2014 |
||
26-01-2015 |
Notification -
NEPRA (Sale of Electric Power by Renewable Energy Companies)
Guidelines, 2015 |
|
24-01-2015 |
Re-Scheduling of Hearing - Tariff Petition filed by Jamshoro Power
Company Limited (GENCO-1) for 1320 MW (2x660 MW Net) Coal Fired
Power Plant. |
|
Petition for Tariff Determination for
1320 MW Coal Fired Power Plant at Jamshoro |
||
24-01-2015 |
Consultative Session
- Corrigendum - For Entities involved in Re-Sale/ Re-Distribution of
Electric Power After Obtaining one point Bulk Supply from
Distribution Companies. |
|
22-01-2015 |
Decision of the Authority in the matter of Show
Cause Notice under Rule 4(8) and 4(9) of the NEPRA (Fines) Rules,
2002 regarding Charging of Meter Rent by K-Electric Limited
(Formerly KESC) |
|
22-01-2015 |
Determination of National
Electric Power Regulatory Authority in the Matter of Upfront
Generation Tariff for Solar PV Power Plants |
|
22-01-2015 |
Notice of Admission/ Hearing - Revised
Tariff Petition filed by Zephyr Power (Pvt.) Limited for
Determination of Reference Generation Tariff for 50MW Wind Power
Project at Gharo, Thatta, Sindh |
|
Revised Application
for Award of Negotiated Tariff for Zephyr Power (Pvt.) Limited |
||
Framing of Issues - Tariff Petition Filed for 50 MW Wind
Power Project at Gharodistrict Thatta Sindh by Zephyr Power (Pvt)
Limited |
||
22-01-2015 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Tapal Wind Energy
(Private) Limited (TWEPL) |
|
Application for
Modification in Generation License No. WPGL/23/2013 of
Tapal Wind Energy (Private) Limited |
||
21-01-2015 |
Notification - 15(I)/2015 dated
13.01.2015 - Decision of
the Authority dated 21.11.2014 in the matter of Review Petition
filed by Fazal-e-Akbar & Company on behalf of Asad Umar (MNA) under
NEPRA (Review Procedure) Regulations, 2009 with respect to the
Upfront Tariff of Coal dated 26.06.2014 |
|
20-01-2015 |
Notice of Admission - Generation
Licence Application of Engro Powergen Thar (Pvt.) Limited (EPGTPL) |
|
Engro Powergen Thar (Pvt.) Limited
Application for a Generation License of 2X330 MW Thar Coal Based
Power Plant at Thar Block II Sindh |
||
19-01-2015 |
Consultative Session - for entities
Involved in Re-sale/ Re-Distribution of Electric Power after
obtaining one point bulk supply from Distribution Companies. |
|
19-01-2015 |
Notice of
Hearing - Petition filed by Bahria Town (Pvt.) Ltd. (BTPL) Rawalpindi
for Determination of Consumer-End Tariff for the Period July 2014 to June
2015 |
|
The Proposed
Single Tariff formula - Consumer-end tariff mechanism
for all categories for Bahria Town (Pvt.) Limited |
||
16-01-2015 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the Month of
November 2014 for K-Electric Limited (formerly Karachi Electric Supply
Company Ltd.) and Notification (S.R.O. 36(1)12015 dated 16.01.2015)
Thereof |
|
16-01-2015 |
Notification S.R.O. 34(I)/2015 - NEPRA Guidelines for
determination of Consumer end tariff (Methodology and Process) 2015 |
|
15-01-2015 |
Notice of Admission -
Generation Licence Applciation of Ramzan Energy Limited (REL) |
|
Application for Generation
License - Ramzan Energy Limited
(REL) |
||
14-01-2015 |
Notice of
Admission/ Public Hearing - Tariff Petition filed by Jamshoro Power
Company Limited (GENCO-I) for 1320 MW (2x660 MW Net) Coal Fired Power
Plant |
|
13-01-2015 |
Notice for
Prequalification - Provision of Training and Capacity Building
Services for NEPRA |
|
10-01-2015 |
Notice - Licensee Proposed Modification (LPM) in the Generation Licence
of NBT Wind Power Pakistan III (Private) Limited (NBT-III) |
|
Application for
the Licensee Proposed Modification (LPM) of the Generation License of NBT
Wind Power Pakistan III (Private) Limited (NBT-III) |
||
03-01-2015 |
Notice of Admission - Generation Licence Application of Etihad Power
Generation Limited (EGPL) |
|
Generation
Licence Application of Etihad Power
Generation Limited (EGPL) |
||
02-01-2015 |
Decisions
of the Authority in the matter of Fuel Charges Adjustment for the
Months of July, August and September 2014 for K-Electric Limited
(formerly Karachi Electric Supply Company Ltd.) and Notifications
Thereof |
|
02-01-2015 |
Issues framed for Hearing in the Matter of Tariff Petition filed
for 13.5 MW Wind Power Project At Gujju District Thatta Sindh By Burj
Wind Energy (Pvt) Limited |
31-12-2014 |
TARIFF NOTIFICATION
1145(1)/2014 OF EX-WDISCOs |
|
30-12-2014 |
Corrigendum Pertaining to the
Application of Almoiz Industries Limited dated 27th December
2014 |
|
30-12-2014 |
Corrigendum Pertaining
to the Application of The Thal Industries Corporation Limited dated
27th December 2014 |
|
30-12-2014 |
Notice - Licensee Proposed Modification (LPM) in the
Generation Licence of Bhanero Energy Limited (BEL) |
|
Application for Modification in
Generation Licence No. SGC/013/2002 for the Bhanero Energy Ltd. |
||
30-12-2014 |
Notice
- Licensee Proposed Modification (LPM) in the generation licence of
Shakarganj Energy (Private) limited (SEPL) |
|
Modification in Generation License No. SGC/46/2009 granted to
Shakarganj Energy Private Limited. |
||
27-12-2014 |
Notice of Admission (Revised) to the Notice of Admission
pertaining to the application of Almoiz Industries Limited
for the grant of generation licence |
|
27-12-2014 |
Notice of Admission (Revised)
Pertaining
to the application of the Thal Industries Corporation Limited for the
grant of generation licence |
|
27-12-2014 |
Notice of Public Hearing
in the matter of Monthly Fuel Charges Adjustment of Karachi Electric
Supply Company Limited (KESCL) for the Month of November, 2014 |
|
KESCL Monthly Fuel Cost
Adjustment (FCA) due to Variation in Fuel and Power Purchase Price
for the Month of November 2014 |
||
26-12-2014 |
Draft Investment Standard and Procedures
(Transmission and Distribution) Rules, 2014 for Comments of Stakeholders. |
|
25-12-2014 |
Notice of Admission/ Hearing
Petition filed by Burj Wind Energy (Pvt.) Limited for
Determination of Reference Generation tariff for 13.5 MW Wind Power
Project at Gujjo, Thatta, Sindh |
|
Tariff
Application of Burj Wind Energy (Private) Limited for a 13.5 MW Wind
Power Project at Gujjo, District Thatta, Sindh, Pakistan |
||
Issues framed for Hearing in the Matter of Tariff Petition filed
for 13.5 MW Wind Power Project At Gujju District Thatta Sindh By Burj
Wind Energy (Pvt) Limited |
||
24-12-2014 |
Notice - Licensee
Proposed Modification (LPM) in the Generation Licence of Grange Power
Limited (GPL) |
|
Application for
Licensee Proposed Modification in Generation Licence No. IGSPL/22/2009 —
Grange Power Limited |
||
24-12-2014 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the Month of
November 2014 for XWDISCOs along with Notification Thereof |
|
23-12-2014 |
Notice of
Admission - Generation Licence Application of Burj Wind Energy (Pvt)
Limtied (BWEPL) |
|
Application for a Generation Licence for a 13.5
MW Wind Power Project of Burj
Wind Energy (Pvt) Limtied (BWEPL) |
||
21-12-2014 |
Situations Vacant - Legal
Advisor, Assistant Legal Advisor |
|
18-12-2014 |
Notice - Licensee
Proposed Modification (LPM) in the Generation Licence of Hydrochina Dawood Power (Private) Limited
(HDPPL) |
|
Application
for Modification of the Generation License No. WPGL/05/2006 Of HYDROCHINA
Dawood Power (Pvt) Limited. |
||
17-12-2014 |
Hearing
Regarding Fuel Charges Adjustment For The Month Of November 2014 For
Ex-Wapda Distribution Companies |
|
XWDISCOs Energy Purchase Data
for the Month of November 2014 |
||
16-12-2014 |
Application for
Licensee Proposed Modification in Generation Licence No. IGSPL/22/2009 —
Grange Power Limited |
|
16-12-2014 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Zephyr Power
(Pvt) Limtied (ZPPL) |
|
Conversion of the Revised Generation License
Application for 50 MW Wind rower Project at Charo of Zephyr Power
(Pvt.) Limited |
||
16-12-2014 |
Notice - Licensee
Proposed Modification (LPM) in the Generation Licence of Sapphire Wind Power Company Limited (SWPCL) |
|
Sapphire Wind Power Company
Limited ("Company") — Application for Modification of the Generation
License |
||
10-12-2014 |
Draft Power Safety
Code for Transmission & Distribution Licensees 2014 for input/
Comments from all concerned stakeholders. |
|
09-12-2014 |
Notification - SRO 849(1)/2014 dated 26.09.2104 regarding the
option for accepting Upfront Tariff |
|
08-12-2014 |
Notification
(S.R.O. 1036(1)/2014) regarding amendments in NEPRA (Review
Procedure) Regulations, 2009 |
|
08-12-2014 |
Notification
(S.R.O. 1101(1)/2014 DATED 05-12-2014) of NEPRA Competitive Bidding
Tariff
(Approval Procedure) Regulations 2014 |
|
06-12-2014 |
Notice of Hearing - Tariff
Petition filed by Pakgen Power Limited for Coal Conversion |
|
06-12-2014 |
Notice of Hearing - Tariff Petition
filed by Lalpir Power Limited for Coal Conversion |
|
06-12-2014 |
Notice of Hearing - Tariff
Petition filed by Saba Power Company (Private) Limited for
Coal Conversion |
|
05-12-2014 |
Decision of the
Authority in the matter of Extension in Date of Financial Close for
Solar Power Projects under Upfront Solar Tariff |
|
05-12-2014 |
Notice of
Public Hearing - In the Matter of Monthly Fuel Charges Adjustment
Request of KESCL (Now K- Electric) for the Month of October, 2014 |
|
K-Electric Monthly
Fuel Cost Adjustment (FCA) due to Variation in Fuel and Power Purchase Price
for the Month of October 2014 |
||
04-12-2014 |
Revocation of Generation Licence of Arabian Sea Wind
Energy (Private) Limited (ASWEPL) |
|
02-12-2014 |
Decision of the
Authority Pertaining to Revocation of Generation Licence of
Green Electric (Private) Limited |
|
28-11-2014 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the Month of October
2014 for XWDISCOs along with Notification Thereof |
|
27-11-2014 |
Notice of
Admission - Generation Licence Application of FFBL Power
Company Limited (FPCL) |
|
Application for a
Generation License for FFBL Power Company Limited |
||
26-11-2014 |
NOTIFICATION
OF DISCO'S |
|
26-11-2014 |
Decision of the
Authority Pertaining to Revocation of Generation Licence of
Eastern Power Company Limited |
|
26-11-2014 |
Notice - Licensee Proposed Modification (LPM) in the generation licence
of Nadeem Power Generation Limited(NPGL) |
|
Application for Licensee
Modification in Generation Licence No. SGC/031/2005 dated 8th July 2005 of
M/s Nadeem Power Generation (Pvt.) Ltd. |
||
25-11-2014 |
Establishment of NEPRA Regional Office at Karachi |
|
25-11-2014 |
Draft NEPRA ARE (Alternative Renewable Energy) Distributed
Generation/ Net Metering Rules 2014 for input/ views/ comments from
stakeholders. |
|
22-11-2014 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence
of Hawa Energy (Private) limited
(HEPL) |
|
Application for
Modification in Generation Licence No.
WPGL/24/2014 of Hawa Energy (Private)
limited (HEPL)
|
||
22-11-2014 |
Notice of Admission - Generation Licence Application of Sind
Nooriabad Power Company Phase-II (Pvt) Limited (SNPCL-II) |
|
Generation Licence Application of Sind
Nooriabad Power Company Phase-II (Pvt) Limited (SNPCL-II) |
||
22-11-2014 |
Notice of Admission - Generation
Licence Application of Sindh Nooriabad
Power Company (Pvt) Limited (SNPCL) |
|
Generation
Licence Application of Sind Nooriabad
Power Company (Pvt) Limited (SNPCL) |
||
21-11-2014 |
Decision
of the Authority in the matter of Review Petition filed by
Fazal-e-Akbar & Company on behalf of Asad Umer (Member National
Assembly) under NEPRA (Review Procedure) Regulations 2009 with
respect to the Upfront Tariff of Coal dated 26.06.2014 |
|
21-11-2014 |
Decision of
National Electric Power Regulatory Authority in the matter of Application of
NBT Wind Power Pakistan II (Private) Ltd. Opting for Upfront Tariff for Wind
Power Projects |
|
21-11-2014 |
Notice of Hearing - Hearing regarding
Fuel Charges Adjustment for the Month of
October 2014 for EX-WAPDA Distribution
Companies |
|
NTDC-CPPA Energy
Purchase Data for the Month of October
2014 |
||
12-11-2014 |
Notice of
Admission - Generation Licence
Application of Ansari Powergen Company
(Pvt.) Limited (APCPL) |
|
Generation
Licence Application of Ansari Powergen
Company (Pvt.) Limited (APCPL) |
||
12-11-2014 |
Notice of Admission - Generation Licence
Application of Tay Powergen Company (Pvt) Limited (TPCPL) |
|
Generation Licence Application of Tay
Powergen Company (Pvt) Limited (TPCPL) |
||
12-11-2014 |
Notice of
Admission - Generation Licence
Application of Bandhi Powergen Company
(Pvt.) Limited (BPCPL) |
|
Generation
Licence Application of Bandhi Powergen
Company (Pvt.) Limited (BPCPL) |
||
12-11-2014 |
Decision of the Authority in the matter of
Motion for Leave for Review filed by
Roomi Fabrics Limited in the matter
of Approval of Power Acquisition Request
dated 27.01.2014 in Case # PAR-69 |
|
11-11-2014 |
Notification of DISCOs |
|
10-11-2014 |
Decision of the National Electric Power
Regulatory Authority in the Matter of Tariff
Adjustment at Commercial Operations Date of
FFC Energy Ltd. |
|
10-11-2014 |
Corrigendum —
Determination of the Authority in the matter of Thar Coal Upfront
Tariff |
|
10-11-2014 |
Approval of
Extension of Tariff effective from 1st January 2014 to
31st December 2014 in Contract dated 6th November 2002
between NTDC and TAVANIR, Iran for Supply of 74 MW |
|
07-11-2014 |
Rescheduling of Hearing
- Petition filed by Multan Electric Power Company Limited
(MEPCO) for the Determination of its Consumer-end Tariff
Pertaining tot he FY 2014 -15 |
|
07-11-2014 |
Decision of the
Authority in the Matter of Motion for Leave for Review
filed by Hub Power Company Ltd. (Narowal) against
Authority's Decision No. NEPRA/TRF-92/HUBCO-2008/5320-24
dated May 23, 2014 regarding adjustment in its Fuel Cost
Component for April 2014 |
|
01-11-2014 |
Petition filed by Sukkur Electric
Power Company Limited (SEPCO) for the Determination of its Consumer-end
Tariff Pertaining to the FY 2014-15 based on the Actual/ Estimated Results
of the FY 2013-14 as Test Year |
|
01-11-2014 |
Notice of Admission -
Tariff Petition filed by Pakgen Power Limited for Coal Conversion |
|
Tariff Petition filed by
Pakgen Power
Limited
for Coal Conversion of Existing RFO based Power Plant of 365 MW |
||
01-11-2014 |
Petition filed by Multan Electric
Power Company Limited (MEPCO) for the Determination of its Consumer-end
Tariff Pertaining to the FY 2014-15 based on the Actual/ Estimated Results
of the FY 2013-14 as test year |
|
MEPCO Tariff Petition for F.Y.
2014-15 |
||
01-11-2014 |
Notice of Admission -
Tariff Petition filed by Saba Power Company (Private) Limited for
Coal Conversion |
|
Tariff Petition filed by
Saba Power
Company (Private) Limited for Coal Conversion of Existing RFO based Power
Plant of 136.3 MW |
||
01-11-2014 |
Notice of Admission/ Hearing - Petition
filed by National Transmission & Despatch Company Limited (NTDCL) for
Determination of Transfer / Wheeling Charges for the Year 2014-15 |
|
NTDC Filing of Tariff Petition for
Determination of Transfer/ Wheeling Charges for the Year 2014-15 |
||
01-11-2014 |
Tariff Petition filed by
Lalpir Power Limited for Coal Conversion |
|
Tariff Petition filed by
Lalpir Power Limited for Coal Conversion of Existing RFO based Power
Plant of 362 MW |
||
01-11-2014 |
Rescheduling of Hearing in the Matter of
Monthly Fuel Charges Adjustment of Karachi Electric Supply Company
Limited (KESCL) for the Months of July, August and September, 2014 as
well as Quarterly Adjustment Request for the Quarter July-September,
2014 |
|
KESCL
Monthly Fuel Cost Adjustment (FCA) due to Variation in Fuel And Power
Purchase Price for the Month of September 2014 |
||
Adjustment in K-Electic (KE)
Schedule of Tariff on Account of Fuel Price and Power Purchase Cost
Variation for Quarter ended September 2014 |
||
Monthly Fuel Cost
Adjustment (FCA) due to Variation in Fuel and Power Purchase Price for the
Month of August 2014 |
||
Monthly Fuel Cost
Adjustment (FCA) due to Variation in Fuel and Power Purchase Price for the
Month of July 2014 |
||
01-11-2014 |
Notice of Public Hearing
- Hearing in the Matter of Power Acquisition Request (PAR) filed by
Karachi Electric Supply Company LTD. (KESCL) for Purchase of 12.5 MW
Power (Coal Fired) from Al-Abbas Sugar Mills Ltd. (AASML) under NEPRA
IPPR (Procedures & Standards), 2005 |
|
Power
Acquisition Request ("PAR") of K-Electric for Purchase of 12.5 MW Power
(Coal Fired) from Al Abbas Sugar Mills Limited ("AASML") |
||
Issues of Hearing
- Power Acquisition Request filed by K-Electric (formerly KESCL) in respect
of 12.5 MW (Coal Fired) from Al-Abbas Sugar Mills Limited (AASML)
under NEPRA’s IPPR 2005 |
||
31-10-2014 |
Decision of the Authority in the matter of
Fuel Charges Adjustment for the Month of September 2014 for
XWDISCOs along with Notification Thereof |
|
31-10-2014 |
Decision of the Authority regarding Request for Reconsideration of Tariff
Determinations for the Distribution Companies for the Financial Year 2013-14
under section 31(4) of NEPRA Act, 1997 |
|
29-10-2014 |
Notice of Public Hearing - Hearings in the matter of Monthly Fuel
Charges Adjustment of Karachi Electric Supply Company Limited (KESCL)
for the Month of September, 2014 as well as Quarterly Adjustment for
the Quarter July-September, 2014 |
|
29-10-2014 |
Notice of Public Hearing - in the Matter of
Application of Gulf Powergen (Private) Limited
(GPGPL)[Formely Gulf Rental Power (Private) Limited]
for the Grant of Generation Licence |
|
Application for a
Generation License of GPGPL |
||
Comments of
Stakeholders and Rejoinders of GPGPL |
||
Response to Issues Framed For the Hearing in the
Matter of Generation Licence Application of Gulf
Powergen (Pvt.) Limited |
||
29-10-2014 |
Notice of Public Hearing in the Matter of Application of Reshma Power
Generation Limited (RPGL) for the Grant of Generation Licence |
|
Application for a
Generation License of RPGL |
||
Comments of
Stakeholders and Rejoinders of RPGL |
||
Written
Submission on Behalf of Reshma Power Generation (Private) Limited for Grant
the Licence for Power Generation in Pursuance of the Application dated
08-04-2014 under Section 15 of the NEPRA Act, 1997 read with Rule 3 of the
NEPRA Generation Rules, 2000 in the Interest of Justice |
||
28-10-2014 |
Rescheduling of Public Hearing - in the Matter
of Application of K-Energy (Pvt.) Limited (KEPL) for
the Grant of Generation Licence |
|
Generation Licence
Application of K-Energy (Pvt.) Limited (KEPL)
for the grant of Generation Licence. |
||
Comments of
Stakeholders (GL Application of KEPL) |
||
Rejoinders of KEPL (GL
Application of KEPL) |
||
Summary of Issues-Raised by different
Stakeholders in the matter of Generation Licence
Application of K-Energy (Pvt) Ltd |
||
Replies of
K-Energy (Pvt.) Limited on Issues of Hearing |
||
23-10-2014 |
Notice of
Hearing in the Matter of Monthly Fuel Charges Adjustment Requests of
Karachi Electric Supply Company Limited (KESCL), (Now K-Electric) for
the Months of July & August, 2014 |
|
Monthly Fuel Cost
Adjustment (FCA) due to Variation in Fuel and Power Purchase Price for the
Month of August 2014 |
||
Monthly Fuel Cost
Adjustment (FCA) due to Variation in Fuel and Power Purchase Price for the
Month of July 2014 |
||
22-10-2014 |
Notice of Admission
- Generation Licence Application of Mirpurkhas
Sugar Mills Limited (MSML) |
|
Application for a Grant
of Generation Licence (1-10MW) for Mirpurkhas
Sugar Mills Limited |
||
22-10-2014 |
Hearing
Regarding Fuel Charges Adjustment for the Month of September 2014 for
EX-WAPDA Distribution Companies |
|
Energy Purchase Data
for the Month of September 2014 |
||
22-10-2014 |
Revised/Amended Standard Energy Wheeling
Agreement (EWA) for Further Comments from
Stakeholders. |
|
21-10-2014 |
Decision of the
Authority in the matter of Fuel Charges Adjustment for the Month of August
2014 for XWDISCOs along with Notification Thereof |
|
18-10-2014 |
Modification in Generation Licence of
Northern Power Generation Company Limited (NPGCL) |
|
18-10-2014 |
Modification in the Generation Licence of Jamshoro Power Company
Limited (JPCL) |
|
18-10-2014 |
Modification in Transmission Licence of
National Transmission and Despatch Company Limited
(NTDC) |
|
18-10-2014 |
Modification in the Generation Licence of Ashraf Sugar Mill Limited
(ASML) |
|
18-10-2014 |
Modification in the Generation Licence of Anoud
Power Generation Limited (APGL) |
|
18-10-2014 |
Notice of Admission - Generation Licence Application of Sanghar Sugar
Mills Limited (SSML) |
|
18-10-2014 |
Modification in the Generation Licence of
Kohinoor Mills Limited (KML) |
|
18-10-2014 |
Modification
in Generation Licence of Jamshoro Power Company Limited (JPCL) |
|
18-10-2014 |
Public Notice - for Entities Involved in
Rs-Sale/Re-Distriution of Electric Power After
Obtaining One Point Bulk Supply from Distribution
Companies |
|
18-10-2014 |
Modification
in Distribution Licence of Hyderabad Electric Supply Company Limited
(HESCO) |
|
18-10-2014 |
Public Notice - for Entities Involved in
Rs-Sale/Re-Distriution of Electric Power After
Obtaining One Point Bulk Supply from Distribution
Companies |
|
18-10-2014 |
Notice - Licence Proposed Modification
in the Generation Licence of Tenaga Generasi Limited |
|
Tenega Generasi Limited (TGL) - Application for
Licensee Proposed Modification of TGL's Generation Licence No.
WPGCL/04/2006 dated 23rd February 2012. |
||
16-10-2014 |
Draft
NEPRA (Sale of Electric Power by Renewable
Energy Companies) Guidelines, 2014.
Interested Parties may submit their comments (if
any) before 2nd November 2014 at
registrar@nepra.org.pk |
|
16-10-2014 |
Decision of the Authority in the
matter of Motion for Leave for Review filed by NTDC against Decision of the
Authority in the matter of Procurement of Power from 500 MW Chakothi
Hattian Hydropower Project |
|
16-10-2014 |
Decision of the Authority in the matter of Motion for
Leave for Review filed by NTDC against Decision of the Authority regarding
Procurement of Power from 640 MW Azad Pattan Hydropower Project located
in the State of Azad Jammu & Kashmir |
|
13-10-2014 |
Decision
of National Electric Power Regulatory Authority in
the matter of Application of China Sunec
Energy (Private) Ltd. Opting for Upfront Tariff
for Wind Power Projects |
|
11-10-2014 |
Petition Fee in
respect of Petition Filed by GEPCO for the Determination of Consumer
End Tariff Pertaining to FY 2014-15 |
|
Notice of Admission/ Public Hearing - Petition filed by Gujranwal
Electric Power Company Limited (GEPCO) for the determination of Its
Consumer-End tariff pertaining to the FY 2014-15 based on the
actual/estimated results of the FY 2013-14 as test year. |
||
11-10-2014 |
Notice - Licensee Proposed
Modification (LPM) in the Distribution Licence of Sapphire Power
Generation Limited (SPGL) |
|
Application for Licensee
Modification in Distribution License of
Sapphire Power
Generation Limited |
||
11-10-2014 |
Notice - Licensee Proposed
Modification (LPM) in the Generation Licence of Sapphire Power Generation
Limited (SPGL) |
|
Application for Licensee
Modification in Generation License of Sapphire Power Generation
Limited |
||
04-10-2014 |
Notice of Admission - Generation Licence application of Port Qasim
Electric Power Company (Pvt.) Ltd. |
|
Application for Grant of Generation Licence for Port
Qasim Coal-Fired MTh11320 (660x2) MW (Gross 15011) at Port Qassim,
Karachi, Sindh. |
||
03-10-2014 |
Gazette Notification - 1007(1)/2013 to 1017(1)/2013 regarding
XWDISCOs |
|
02-10-2014 |
Generation Licence No. IGSPL/46/2014 - Licence
Application No. LAG-266 Alliance Sugar Mills (Private) Limited (ASMPL) |
|
02-10-2014 |
Generation Licence No. WPGL/28/2014 - Licence Application
No. LAG-261 Titan Energy Pakistan (Pvt.) Limited (TEPPL) |
|
30-09-2014 |
Gazette Notifications - Amendment made in NEPRA
(Tariff Standards and Procedure) Rules, 1998, Amendment made in NEPRA
Performance Standards (Distribution) Rules 2005, Amendment made in NEPRA
Fines Rules, 2002, Amendment made in NEPRA (Uniform System of Accounts)
Rules, 2009 |
|
30-09-2014 |
Notice of Admission
- Generation Licence application of Blue Star Hydel (Pvt) Limited (BSHPL) |
|
Application for Generation License Pursuant To "NEPRA Licensing (Application
& Modification Procedure) Regulation 1999" for 1 MW Solar Power Plant by
Blue Star Hydel (Private) Limited |
||
30-09-2014 |
Notice of Admission
- Generation Licence application of Blue Star Electric (Pvt) Limited
(BSEPL) |
|
Application for Generation License Pursuant To "NEPRA Licensing (Application
8s Modification Procedure) Regulation 1999" for 1 MW Solar Power Plant by
Blue Star Electric (Private) Limited |
||
29-09-2014 |
Petition for Determination
of EPC Tariff for PakPattan Hydropower Project of 2.82 MW (Gross)
Capacity at Pakpattan Canal, District Pakpattan in Province of the Punjab |
|
29-09-2014 |
Generation Licence No. SGC/106/2014 - Licence Application
No. LAG-258 Mehran Sugar Mills Limited (MSML) |
|
29-09-2014 |
Petition for Determination of EPC Tariff for Marala
Hydropower Project of 7.64 (Gross) MW Capacity at Upper Chenab Canal
(UCC), District Sialkot in Province of the Punjab. |
|
29-09-2014 |
Notice - Licensee proposed modification in the generation licence
of Karimi Energy (Pvt.) Limited (KEPL) |
|
Application for Licensee proposed modification
in the generation licence of Karimi Energy (Pvt.) Limited |
||
25-09-2014 |
Hearing in the Matter of Tariff Petition filed by UCH-II Power (Pvt.)
Limited for the Modification of Tariff of 404 MW CCPP Located at Dera
Murad Jamali District Naseerabad Balochistan |
|
23-09-2014 |
Corrigendum/ Nandipur Power Project of NPGCL. |
|
19-09-2014 |
Re-Schedule of Hearing - Extension in Financial Close Date of Upfront Solar
Tariff |
|
19-09-2014 |
Notice of Admission/ Hearing - Petition filed by Islamabad electric
Supply Company Limited (IESCO)for the determination of its Consumer-End
tariff pertaining to the FY 2014-15 based on the actual results of the FY
2013-14 as test year |
|
19-09-2014 |
Hearing regarding fuel charges adjustment for the month of August 2014
for EX-WAPDA Distribution Companies |
|
Energy Purchase Data
of EX-WAPDA Distribution Companies for the Month of August 2014 |
||
17-09-2014 |
Draft
National Electric Power Regulatory Authority
Competitive Bidding Tariff
(Approval Procedure) Regulations, 2014.
Comments are invited from Parties/Stakeholders on the above Regulations within
15 days (before 2nd October, 2014) on the
following address
Registrar NEPRA
NEPRA Tower, Attaturk Avenue (East), G-5/1,
Islamabad
Tele: 051-2013200, 051-9206500
Comments may also be sent through e-mail at
registrar@nepra.org.pk.
|
|
16-09-2014 |
Notice of Admission/Public Hearing Petition
filed by Quetta Electric Supply Company (QESCO) for the Determination
of its Consumer-End Tariff pertaining to the FY 2014-15 based on the actual
/estimated results of the FY 2013-14 as test Year:
Time: 10:30 AM Date:
26-09-2014 Venue: Serena Hotel Quetta |
|
Quetta Electric Supply Company (QESCO) Tariff Petition for the the Year 2014-15 |
||
16-09-2014 |
Notice of Hearing - Extension in
Financial Close Date of Upfront Solar Tariff |
|
16-09-2014 |
Generation Licence No.
WPGL/25/2014 Licence Application No. LAG-262 Jhimpir Power (Private)
Limited (JPPL) |
|
16-09-2014 |
Generation Licence No.
WPGL/27/2014 Licence Application No. LAG-260 NBT Wind Power Pakistan III
(Pvt.) Limited (NBTWPPPL-III) |
|
16-09-2014 |
Generation Licence No.
WPGL/26/2014 Licence Application No. LAG-259 NBT Wind Power Pakistan II
(Pvt.) Limited (NBTWPPPL-II) |
|
16-09-2014 |
Generation Licence No.
SGC/105/2014 - Licence Application No. LAG-265 Habib Sugar Mills Limited
(HSML) |
|
12-09-2014 |
Decision of thte Authority in the Matter of
Application for Unconditional Acceptance of Bagasses Upfront Tariff filed by
Hamza Sugar Mills Limited (HSML) for its 15 MW New Bagasse
Based Cogeneration Power Plant, Jettha Bhutta, Khapur, Distric Rahim Yar
Khan, Punjab |
|
Generation Licence Application Shahmurad
Sugar Mills Limited |
||
12-09-2014 |
Notice of Hearing - Extension in
Financial Close Date of Upfront Solar Tariff |
|
12-09-2014 |
Public Notice - Hearing
in the Matter of Tariff Petition filed by Northern Power Generation
Company Limited (NPGCL) for Determination of Reference Generation Tariff
of 425-460 MW CCPP at Nandipur, District Gujranwala |
|
Tariff Petition for 425-460 MW CCP at
Nandipur of NPGCL |
||
10-09-2014 |
Generation
Licence No. IGSPL/44/2014 - Licence Application No. Lag-253 RYK Mills
Limited. |
|
05-09-2014 |
Notice of Admission/Public Hearing request filed by National
Transmission & Despatch Company (NTDC) for approval of Negotiated
Feasibility Stage Tariff |
|
NTDC Request 1100 MW
Kohala Hydropower Project— Approval of
Feasibility Stage Tariff Proposal
Issues Framed in the
Matter of Request Filed by National Tranmission And Despatch Company (NTDC)
for Approval of Negotiated Feasibility Stage Tariff in Respect of Power
Procurement from 1100 Mw Kohala Hydropower Project |
||
02-09-2014 |
Notifications (SRO 732 (1)/2014,
733(I)/2014, SRO 734 (1)/2014, 735(1)/2014, (All dated 12-08-2014) regarding
amendments in National Electric Power Regulatory Authority Rules
|
|
01-09-2014 |
Decision of the Authority in the matter of Fuel
Charges Adjustment for the Month of July 2014 for XWDISCOs
along with Notifications Thereof |
|
30-08-2014 |
Notice of Public Hearing -
Petition filed by Sitara Energy Limited for Determination of Generation
Tariff |
|
28-08-2014 |
Hearing in the matter
of monthly Fuel Charges Adjustment Request of K-Electric Company Ltd.
(KE)
for the Months of April, May & June 2014 as well as Quarterly Adjustment
request for the Quarter April-June, 2014 including Yearly Indexation of O&M
Cost Component. |
|
28-08-2014 |
Generation Licence
Application of K-Energy (Pvt.) Limited (KEPL)
for the grant of Generation Licence. |
|
Re-Scheduling of Public
Hearing
- Notice about Rescheduling of Public Hearing in the Matter of Application
of K-Energy (Pvt.) Limited (KEPL) for the Grant of Generation Licence |
||
28-08-2014 |
Corrigendum - The World "Chairman" inadvertently appears in the NEPRA's
Annual Report 2012-13 |
|
27-08-2014 |
Notice of Admission/ Hearing - Petition
filed by LESCO for the Determination of its Consumer-end Tariff Pertaining
to the FY 2014-15 based on the actual / estimated results of the FY 2013-14
as test year. |
|
27-08-2014 |
Notice of 2nd Hearing - Development of
Upfront Solar Tariff |
|
25-08-2014 |
Notice of Re-Scheduling
- Petition filed by PESCO for the Determination of its Consumer-end
Tariff Pertaining to the FY 2014-15 based on the actual results of the FY
2013-14 as test year. |
|
22-08-2014 |
Notice of
Public Hearing -Hearing regarding Fuel Charges Adjustment for the
Month of July 2014 for EX-WAPDA Distribution Companies |
|
12-08-2014 |
Licence Proposed Modification in the Generation
Licence of UEP Wind Power (Pvt.) Limited. |
|
UEP Wind Power (Private)
Limited - Application for Licensee Proposed Modification |
||
12-08-2014 |
Draft NEPRA Guidelines for
Determination of Consumer-end Tariff for X-WAPDA DISCO's |
|
Draft
NEPRA Guidelines for determination of consumer end tariff (Methodology and
process )Distribution
of Petition Formats ( FINAL) v 1.2
Formats for Generation Plan
and Power Purchase Costs v 1.2 |
||
20-08-2014 |
Notice of Admission
- Generation Licence Application of Almoiz Industries Limited (AMIL) |
|
Application for the grant of 45MW Generation License for
our new project Almoiz Industries Limited, Mianwali (Plant-2). |
||
20-08-2014 |
Notice of Admission - Generation Licence
Application of Thal Industries Corporation Limited (TICL) |
|
Application for the grant of 30MW Generation License for our
new project The Thal Industries Corporation Ltd. Plant-1 (Layyah Sugar
Mills), Layyah |
||
Application for the grant of 20MW Generation License for our
new project The Thal Industries Corporation Ltd. Plant-2 (Safina
Sugar Mills) Lalian, Chinot |
||
11-08-2014 |
Postponement of Public
Hearing in the Matter of Application of K-Energy (Private) Limited
(KEPL)
for the Generation Licence. |
|
11-08-2014 |
Postponement of Hearing
in the matter of Monthly Fuel Charges Adjustment of K-Electric (Formerly
KESCL) for the months of April, May and June 2014 |
|
08-08-2014 |
Notice of Admission -
Public Hearing - Petition filed by Bahria Town (Pvt) Limited (BTPL)
Rawalpindi for Determination of its Consumer-end Tariff for the period July
2014 to June 2015 |
|
08-08-2014 |
Notice of Admission -
Hearing - Petition filed by FESCO for Determination of its
Consumer-end Tariff pertaining to the FY 2014-15 based based on the actual
results of the FY 2013-14 as test year. |
|
08-08-2014 |
Notice of Admission -
Hearing - Petition filed by PESCO for Determination of its
Consumer-end Tariff pertaining to the FY 2014-15 based based on the actual
results of the FY 2013-14 as test year. |
|
07-08-2014 |
Hearing in the Matter of
Monthly Fuel Charges Adjustment of K-Electric (Formerly KESCL)
for the Months of April, May and June 2014 |
|
Monthly Fuel Cost Adjustment (FCA) due to
Variation in Fuel and Power Purchase Price for the Month of June 2014. |
||
Monthly Fuel Cost Adjustment (FCA) due to
Variation in Fuel and Power Purchase Price for the Month of May 2014. |
||
Monthly Fuel Cost Adjustment (FCA) due to Variation in Fuel
and Power Purchase Price for the Month of April 2014. |
||
04-08-2014 |
Draft Authority has proposed certain amendments
in NEPRA (Review Procedure) Regulations, 2009"; Stack-holders are
requested to file their comments (in any) within 15 days. |
|
25-07-2014 |
Decision of the Authority in the matter of
Fuel Charges Adjustment for the month of June 2014 for
XWDISCOs along with Notifications Thereof |
|
24-07-2014 |
Notice of Admission/ Public
Hearing - Petition filed by Sitara Energy Limited (SEL) for
Determination of Generation Tariff |
|
24-07-2014 |
Corrigendum - Generation
Licence Application of Titan Energy Pakistan (Pvt.) Limited (TEPPL) |
|
19-07-2014 |
Hearing Regarding Fuel
Charges Adjustment for the Month of June 2014 for EX-WAPDA
Distribution Companies. |
|
17-07-2014 |
Notice of Admission
- Generation Licence Application of First Solar (Private) Limited
(FSPL) |
|
First Solar (Private)
Limited - Application for a
Generation License of 02 MW Solar Power Project |
||
17-07-2014 |
Notice of Admission
- Generation Licence Application of Habib Sugar Mills Limited
(HSML) |
|
Habib Sugar Mills
Limited - Application for Generation Licence for grant of 3 MW. |
||
17-07-2014 |
Notice of Admission
- Generation Licence Application of Alliance Sugar Mills (Pvt.)
Limited (ASMPL) |
|
Application for a new Generation License of M/s Alliance
Sugar Mills (Private) Limited (ASML) |
||
15-07-2014 |
Notice of Public Hearing
- in the Matter of Application of K-Energy (Pvt.) Limited (KEPL)
for the grant of Generation Licence. |
|
Generation Licence
Application of K-Energy (Pvt.) Limited (KEPL)
for the grant of Generation Licence. |
||
14-07-2014 |
Decision of the Authority regarding Request
for Reconsideration of Tariff Determinations for the WAPDA
Distribution Companies for the Financial Year 2013-14 under
Section 31(4) of NEPRA Act 1997 |
|
12-07-2014 |
Notice of Hearing
- Development of Upfront Solar Tariff |
|
11-07-2014 |
Notice of Public Hearing
- Development and Determination of Upfront Tariff for Small Hydro
Power Generation Projects upto 25MW Installed Capacity |
|
09-07-2014 |
Determination of the
Authority in the Matter of Thar Coal Upfront Tariff |
|
03-07-2014 |
Notice of Admission - Generation Licence
Application of Titan Energy Pakistan (Pvt) Limited (TEPPL) |
|
Application of Titan Encrin, Pakistan (Private) Limited
(TEPPL)
For grant of Generation License in respect of 9MW Wind Power Project at
aimpir District Thatta Sindh |
||
03-07-2014 |
Notice of Admission - Generation Licence
Application of Jhimpir Power (Pvt) Limited (JPPL) |
|
Jhimpir Power (Pvt) Limited (JPPL) Application for a
Generation License for a 49.6MW Wind Power Project |
||
03-07-2014 |
Notice of Admission
- Generation Licence Application of Roshan
Power (Private) Limited (RPPL) |
|
Application for a Generation License of 10 MW Solar
Power Project Roshan Power (Private) Limited |
||
01-07-2014 |
NOTIFICATION (SRO 582 (I)/2014)
REGARDING AMENDMENTS IN NEPRA (FEES) RULES, 2002 |
|
01-07-2014 |
To Whom It May
Concern - Clarification with regard to
Communication sent to NEPRA |
|
30-06-2014 |
Grid Code
Addendum No. II for Grid Integration of Photovoltaic (PV) & Concentrated
Solar Power (CSP) Plants |
|
30-06-2014 |
Decision of the Authority in the
matter of Fuel Charges Adjustment for the Month
of May 2014 for XWDISCOs along with
Notifications Thereof |
|
27-06-2014 |
Decision of the Authority in the matter of Motion for
Leave for Review filed by Water & Power Development Authority against
Authority's Determination of Bulk Supply Tariff for Financial Year 2013-14 |
|
26-06-2014 |
Notice of Admission
Generation Licence Application of NBT Wind Power
Pakistan-III (Pvt) Limited |
|
Application for a Generation License NBT Wind
Power Pakistan III (PVT) Limited 250MW |
||
26-06-2014 |
Notice of Admission
Generation Licence Application of
Mehran Sugar Mills Limited (MSML) |
|
Application for a Generation License of
Mehran Sugar Mills Limited (MSML) for
Grant of 1 M.W to l4.6 M.W |
||
26-06-2014 |
Notice of Admission Generation Licence
Application of NBT Wind Power Pakistan-II (Pvt)
Limited |
|
Application for a Generation License NBT Wind
Power Pakistan II (PVT) Limited 250MW |
||
21-06-2014 |
Rescheduling Public Hearing to be Conducted
Under Rule 3(1) Suo Moto Proceeding, in the Matter
of TOU Metering of Cellular Companies |
|
21-06-2014 |
Notice of Public
Hearing - Rescheduling of Public Hearing to be
Conducted under Rule 3(1) Suo Moto Proceeding, in
the matter of Changing Terms and Conditions of Life
Line Consumers as Proposed by EX-WAPDA DISCOs |
|
27-06-2014 |
Decision of the Authority in the matter of Motion for
Leave for Review filed by Water & Power Development Authority against
Authority's Determination of Bulk Supply Tariff for Financial Year 2013-14 |
|
26-06-2014 |
Determination of the Authority in
the matter of Generation Licence Application of
Blue Star Hydel (Private) Limited |
|
26-06-2014 |
Decision of the Authority regarding
Reconsideration Request filed by Government of Pakistan in the
matter of Upfront Tariff for Coal Power Projects |
|
25-06-2014 |
Decision
of the Authority in the Matter of Application for
Unconditional Acceptance of Bagasse Upfront
Tariff filed by RYK Mills Limited (RYKML)
for its 30 MW New Bagasse Based Cogeneration Power
Plant at RYK Mills, Rukanabad, Tehsil Liaqatpur,
District Rahim Yar Khan, Punjab |
|
21-06-2014 |
Rescheduling Public Hearing to be Conducted Under
Rule 3(1) Suo Moto Proceeding, in the Matter of TOU
Metering of Cellular Companies |
|
21-06-2014 |
Notice of Public
Hearing - Rescheduling of Public Hearing to be
Conducted under Rule 3(1) Suo Moto Proceeding, in
the matter of Changing Terms and Conditions of Life
Line Consumers as Proposed by EX-WAPDA DISCOs |
|
20-06-2014 |
Decision of
National Electric Power Regulatory Authority
in the matter of Application of Jhimpir
Power (Private) Ltd. Opting for Upfront
Tariff for Wind Power Projects |
|
20-06-2014 |
Decision of
National Electric Power Regulatory Authority
in the matter of Application of
Hawa Energy (Private) Ltd. Opting for Upfront
Tariff for Wind Power Projects |
|
20-06-2014 |
Hearing Regarding Fuel Charges Adjustment
for the Month of May 2014 for
EX-WAPDA Distribution Companies. |
|
20-06-2014 |
Notice of Admission - Generation Licence
Application of Hamza Sugar Mills Limited (HSML) |
|
Hamza Sugar Mills Ltd -
Application fer a Generation License of 15M.W.
High Pressure Bagasse Based Power Generation Project |
||
Mehran Sugar Mills Limited - Application for a
Generation License for Grant of 1 M.W to 14.60 M.W. |
||
20-06-2014 |
Notice of Admission - Generation Licence
Application of Safe Solar Power (Private) Limited
(SSPPL) |
|
Safe Solar Power (Pvt.) Ltd -
Application for a Generation License |
||
19-06-2014 |
Decision of the Authority in the matter of Upfront Tariff for New
Bagasse Based Co-generation Projects — Extension for Date of
Acceptance of Upfront Tariff |
|
19-06-2014 |
Notice of Admission - Generation Licence
Application of Reshma Power Generation
Limited (RPGL) |
|
Application for a
Generation License of Reshma Power Generation
(Pvt.) Limited for its 96.96 MW (Gross ISO)
Power Project Located at 4.5 km. Link Manga-Raiwind
Road Raiwind, District Kasur, Punjab, Pakistan |
||
19-06-2014 |
Notice of Admission
- Generation Licence Application of Gulf
Powergen (private) Limited (GPPL) (Formerly Gulf
Rental Power (Private) Limited (GRPPL) |
|
Application for grant of Generation Licence
for 84 MW Gulf Powegen (Pvt.) Thermal Power
Plant |
||
19-06-2014 |
Notice
of Admission - Generation Licence Application of
RYK Mills Limited (RYKML) |
|
Application for a new Generation License of M/s
RYK Mills Limited |
||
19-06-2014 |
Naudero Energy (Pvt.) limited - Modification
In Generation License |
|
19-06-2014 |
Dadu Energy (Pvt.)
Limited - Modification in Generation License |
|
18-06-2014 |
Determination of the Authority in
the matter of Licensee Proposed Modification of
Hi-Tech Pipes & Engineering Industries (Pvt.)
Limited in Generation Licence No. SGC/86/2012. |
|
17-06-2014 |
Notice
of Public Hearing - Public Hearing to be conducted
under Rule 3(1) Suo Moto Proceeding, in the matter
of TOU Metering of Cellular Companies |
|
17-06-2014 |
Notice of Public Hearing
- Public Hearing to be conducted under Rule 3(1) Suo
Moto Proceeding, in the matter of Changing Terms and
Conditions of Life Line Consumers as Proposed by
EXWAPDA DISCOs |
|
17-06-2014 |
Decision of the Authority in the
matter of Motion for Leave for Review filed by
Peshawar Electric Supply Company Ltd. (PESCO)
against Tariff Determination of the Authority dated
April 28, 2014 |
|
16-06-2014 |
Decision of the Authority in the matter of
Motion for Leave for Review filed by
Gujranwala Electric Power Company Ltd (GEPCO)
against Tariff Determination of the Authority dated
January 16, 2014 |
|
16-06-2014 |
Decision of the Authority in the matter of
Motion for Leave for Review filed by Faisalabad Electric
Supply Company Ltd (FESCO) against Tariff Determination of the
Authority dated February 6, 2014 |
|
13-06-2014 |
Decision of the Authority in the matter of Motion
for Leave for Review filed by
Sukkur Electric Power Company Ltd. (SEPCO)
against Tariff Determination of the Authority dated
March 03, 2014 |
|
14-06-2014 |
Notice of Public Hearing - Petition filed by Karimi
Energy (Private) Limited (KEPL) for the
Determination of Feasibility stage Generation Tariff
in Respect of 3.6 MW run of River Jabri Bedar Hydro
Power Project |
|
12-06-2014 |
Decision of the Authority in the matter of
Motion for Leave for Review filed by Hyderabad Electric
Supply Company Ltd. (HESCO) against Tariff Determination of the
Authority dated February 20, 2014 |
|
12-06-2014 |
Decision of the Authority in the
matter of Motion for Leave for Review filed
by Lahore Electric Supply Company Ltd. (LESCO)
against the Authority's Tariff Determination dated
January 02, 2014 |
|
12-06-2014 |
Decision of the
Authority in the matter of Motion for Leave for
Review filed by Multan Electric Power Company
Ltd. (MEPCO) against the Authority's
Determination dated January 17, 2014 |
|
12-06-2014 |
Decision of the Authority in the matter of
Motion for Leave for Review filed by Quetta Electric Supply
Company Ltd. (QESCO) against the Tariff Determination of the
Authority dated January 27, 2014 |
|
12-06-2014 |
Notice for
Hearing - Proceedings for Review of Upfront Tariff
for New Bagasse based Co-Generation Power Projects |
|
11-06-2014 |
Decision of the
Authority in the Matter of Application for Unconditional
Acceptance of Bagasse Upfront Tariff filed by Chiniot
Power Limited (CPL) for its 57 MW New Bagasse Based
High-Pressure Cogeneration Power Plant at 26 KM Jhang Road,
Chiniot, Punjab (Adjacent to Ramzan Sugar Mills Ltd.) |
|
05-06-2014 |
Gazette
Notifications - Tariff Notification |
|
03-06-2014 |
Gazette
Notifications regarding XWDISCOs, XWGENCOs, and IPPs |
|
27-05-2014 |
Notice of
Admission/ Public Hearing - Petition filed by Punjab
Power Development Company Limited (PPDCL) for the
Determination of EPC stage Generation Tariff in respect of
2.82 MW run of canal Pakpattan Hydropower Project. |
|
26-05-2014 |
Notice of Admission/ Public
Hearing - Petition filed by Punjab Power Development
Company Limited (PPDCL) for the Determination of EPC
stage Generation Tariff in respect of 7.64 MW run of Canal
Marala Hydropower Project |
|
27-05-2014 |
Decision of
the Authority in the matter of Fuel Charges Adjustment for
the Month of April 2014 for XWDISCOs along with
Notifications thereof |
|
26-05-2014 |
Notice of Admission -
Generation Licence Application of Alliance Sugar Mills
(Pvt) Limited (ASMPL) |
|
Application for a
Generation Licence of 13.5 MW for Alliance Sugar Mills
(Pvt.) Limited
Captive Power Plant |
||
Application
request for the Generation Licence for WHR based 15 MW to
Lucky Cement Ltd from its Plant situated at Mian Indus
Highway, Pezu, District lakki Marwat, Khaiber Pakhtunkhwa |
||
23-05-2014 |
Notice of
Admission - Generation Licence Application of Lucky
Cement Limited (LCL) |
|
26-05-2014 |
Reschedule of Hearing -
Revision of Indexation/ adjustment Mechanism of the Fuel
Cost Component of Bagasse based Captive Power Plants -
Adopting Coal Price Mechanism Prescribed in the
Upfront Tariff for New Bagasse Based Co-Generation Power
Projects |
|
23-05-2014 |
Corrigendum
- Approval of National Electric Power Regulatory Authority
in the matter of Application of Safe Solar Power (Private)
Limited for Unconditional Acceptance of Upfront Solar Tariff
for 10 MW Solar Power Plant |
|
23-05-2014 |
Decision of the Authority in
the Matter of Fuel Price Adjustment for February 2014 Hub
Power Company Ltd. for the month of April 2014 |
|
23-05-2014 |
Approval of National Electric Power Regulatory
Authority in the matter of Application of Bukhsh
Energy (Private) Limited for Unconditional
Acceptance of Upfront Solar Tariff for 10 MW Solar
Power Plant |
|
21-05-2014 |
Notice of Public
Hearing in the matter of Licensee Proposed
Modification (LPM) of K-Electric-KEL
(Formerly Karachi Electric Supply Company Limited -
KESC)
Copy of Application |
|
21-05-2014 |
Notice of Admission - Generation Licence
Application of Quaid-e-Azam Solar Power (Pvt.)
Limited (QSPPL) |
|
Application for
grant of Generation Licence Application in the name
of Quaid-e-Azam Solar Power (Private) Limited
for 100MW Solar Power Plant at Bahawalpur |
||
06-02-2014 |
KESCL Application for Modification of Generation
Licence IGL/04/20021 |
|
Guideline Regarding Wheeling of Electricity from One Point
to another in respect of generation facilities, engaged in
a business of selling of electricity to Bulk Power