National Electric Power Regulatory Authority

Islamic Republic of Pakistan

  • 2025

    29-05-2025

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. FAIZULLAH KHAN S/O ABDUL QADEER KHAN. UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING WRONG BILLING

    View

    21-04-2025

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. NABI SHER UNDER SECTION 39 OF THE REGULATION OF GENERATION  TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT 1997. AGAINST PESCO. REGARDING CORRECTION OF BILL View

    14-04-2025

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. SHER SHAH S/O FAROOO SHAH THROUGH COUNSEL MR. HASSAN-U.K AFRIDI. ADVOCATE SUPREME COURT. UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING LOADSHEDDING. View

    27-03-2025

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. WAHID KHAN. UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION & DISTRIBUTION OF ELECTRIC POWER ACT. 1997. AGAINST PESCO. REGARDING ADJUSTMENT OF LOAD DETECTION BILL View

    12-03-2025

    DECISION IN THE MATTER OF COMPLAINT FILED BY M/S UNIVERSAL GAS, UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    05-03-2025

    DECISION IN THE MATTER OF CASE REFERRED BY THE HONORABLE PESHAWAR HIGH COURT. PESHAWAR IN WRIT PETITION NO. 3862- P/2023: MR KHALID AYUB & OTHERS VS FOP., PESCO & OTHERS View

    04-03-2025

    DECISION IN THE MATTER OF REVIEW MOTION FOR LEAVE FILED BY PESHAWAR ELECTRIC SUPPLY COMPANY AGAINST THE DECISION OF NEPRA CONSUMER COMPLAINTS TRIBUNAL DATED DECEMBER 11. 2023 IN THE MATTER OF COMPLAINT FILED BY LT. COL. (RTD.)  SIDDIQULLAH - ADMINISTRATOR ON BEHALF OF M/S MUHAMMAD TEACHING HOSPITAL. PESHAWAR UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997. AGAINST PESCO REGARDING ADJUSTMENT OF LOAD View

    24-02-2025

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. MUHAMMAD HAZRAT, SOHAIL MARBLE FACTORY. UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING ARREARS IN THE BILL View

    11-02-2025

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. IMRAN KHAN S/O ANWAR KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING DETECTION BILL View
  • 2024
    31-12-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. ABDUL GRAFOOR, UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT 1997 AGAINST PESCO REGARDING CORRECTION OF BILL
    02-10-2024
    DECISION IN THE MATFER OF COMPLAINT FILED BY MR. AHSANULLAH UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING FIXED CHARGES
    02-09-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. HAIDER ALl S/O ALI KHAN, M/S GALAXY INTERNATIONAL ESTATE, UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST FESCO REGARDING DETECTION BILL
    02-08-2024
    DECISION IN THE MATIER OF COMPLAINT FILED BY MR. WALL MUHAMMAD KRANIMIS SHOAIB STONE CRUSH PLANT UNDER SECTION 39 OF. THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF' ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING
    02-08-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY DIRECTOR. M/S AL-MADEENA MAT INDUSTRIES (PVT.1 LTD. UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING CORRECTION OF BILL
    31-05-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. DALAO SHAIR MANAGER. POWER PLANNING, PTML UFONE. UNDER SECTION 39 OF' THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING OVER BILLING
    31-05-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. MUHAMMAD AYAZ S/O ASLAM KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING CORRECTION OF BILL
    16-04-2024
    COMPLAINT FILED BY MR. KHATEER AEMAD UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING WRONG BILLING
    25-03-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. IMRAN KHAN S/O MUHAMMAD ASLAM KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING (A/C# 30 26932 01994O1)
    27-02-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. ABRAR-UL-HAQ ADVOCATE HIGH COURT, UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING FIXED CHARGES
    27-02-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. ASHFAQ UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING DETECTION BILLING
    15-02-2024
    DECISION IN THE MATFER OF COMPLAINT FILED BY MR. SHAHID BUTT' MANAGER RETAIL DEVELOPMENT. ATTOCK PETROLEUM LIMITED. UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING REMOVAL OF 1321W GRID LINES & POLES.
    17-01-2024
    DECISION IN  THE MATTER OF .COMPLAINT  FILED BY MR. FAZAL WAHID UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING
    17-01-2024
    COMPLAINT. FILED BY MR. MAJEED ULLAH UNDER SECTION .39. OF  THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING
    17-01-2024
    COMPLAINT FILED BY MR. MUMTAZ ALl UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
    17-01-2024
    COMPLAINT .FILED. BY .MR. HAMID KHAN.. UNDER SECTION. 39 OF THE I REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRl\ POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING
    17-01-2024
    COMPLAINT FILED BY MR. AJMAL KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER . ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
    17-01-2024
    COMPLAINT FILED BY MR. ZIA UL HAQ UNDER SECTION 39 OF THE REGULATION OF GENERATIONS  TRANSMISSION. AND DISTRIBUTION'. OF ... ELECTRIC POWER.. ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
    16-01-2024
    COMPLAINT FILED BY MR. GHULAM SAEED, UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING
    16-01-2024
    COMPLAINT FILED BY MR. HUSSAIN ULLAH, UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
    16-01-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. MUHAMMAD QASIM, UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
    16-01-2024
    DECISION IN. THE MATTER OF COMPLAINT FILED BY MR. TAJ ALl KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING
    16-01-2024
    COMPLAINT FILED BY MR. MUKHTIAR ULLAH UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING
    16-01-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. SHAFI ULLAH, UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
    09-01-2024
    COMPLAINT FILED BY MR. MUDASSIR KHAN, UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
    09-01-2024
    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. MUHAMMAD NADEEM, UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING
  • 2023

    27-12-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. TAIMOOR JANG KHAN, UNDER SECTION 39 OF THE REGULATION OF GENERATIONS TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    22-12-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. HAYATULLAH UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING ARREARS IN THE BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. FAWAD ALI UNDER SECTION 39 OF THE  REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING ( View

    13-12-2023

    COMPLAINT FILED BY MR. HIBAT KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. MUSHTAQ AHMAD UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. NASEEM KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. SHAMSHAD HUSSAIN UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. SUHAIL SHAH KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. ZULFIQAR UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION Or ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. TAJ MUHAMMAD UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF H ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    13-12-2023

    COMPLAINT FILED BY MR. JAVID KHAN UNDER SECTION 39 OF I E REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION �F ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EX ESSIVE BILLING View

    12-12-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY LT. COL. SIDDIQULLAH  ADMINISTRATOR ON BEHALF OF M/S MUHAMMAD TEACHING HOSPITAL. PESHAWAR UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997, AGAINST PESCO REGARDING ADJUSTMENT OF LOAD View

    12-12-2023

    COMPLAINT FILED BY MR. SYED WAQAS ABDULLAH UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING View

    28-11-2023

    DECISION IN THE MATTER OF MOTION FOR LEAVE FOR REVIEW AGAINST THE DECISION OF NEPRA CONSUMER COMPLAINTS TRIBUNAL IN THE MATTER OF COMPLAINT FILED BY MR. SAHIBZADA JAMIULLAH KHAN THROUGH COUNSEL MR. SHAFIQ AITZAZ KHATTAK ADVOCATE HIGH COURT, UNDER SECTION 39 OF THE REGULATION OF GENERATION1 TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST, PESCO REGARDING DETECTION Bill View

    20-11-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. GHULAM AFTAB S/O MUHAMMAD GULL. UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING CORRECTION OF BILL View

    13-11-2023

    COMPLAINT FILED BY MR. JANAB ALl UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING DETECTION BILL View

    11-08-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. JANAB ALl S/O CHAMAN ROZ KHAN. UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING CORRECTION OF BILL

    View

    11-08-2023

    COMPLAINT FILED BY PAKISTAN REFRIGERATION (PVT) LTD. UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING NON-IMPLEMENTATION OF DECISION OF ELECTRICAL INSPECTOR/PO

    View

    26-07-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. SAHIBZADA JAMIULLAH KHAN THROUGH COUNSEL MR. SHAFIO AITZAZ KHATTAK ADVOCATE HIGH COURT. UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING DETECTION BILL View

    26-07-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. SAEED NAWAZ. UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING LOW VOLTAGE AND FIXATION OF POLE! WIRES View

    19-06-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. JAN NISAR UNDER SECTION 39 OF THE REGULATION OF GENERATION. TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING DETECTION BILLING View

    15-06-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MUHAMMAD WAQAR SIO MUHAMMAD HAFEEZ UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING View

    05-06-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. JANAB ALl S/C CHAMAN ROZ KHAN, UNDER SECTION 39 OF THE REGULATION OF GENERATION TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING CORRECTION OF BILL View

    24-05-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY M/S FRONTIER FOUNDRY STEEL 1FF STEEL) UNDER SECTION 39 OF REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESHAWAR ELCTRIC SUPPLY COMPANY REGARDING MDI CHARGES View

    12-04-2023

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. NAVEED HASSAN ALLIANCE HEALTHCARE (PVT.) LTD. UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGADING CORRECTION OF BILL L (A/C# 30 26214 0049500). View
  • 2022

    03-11-2022

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. MIR BADSHAH S/O BAKHTA KHAN, UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING BILLING AT VACANT PREMISES (A/C# 18 26632 0736500). View

    07-07-2022

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. USMAN GUL. DGM ACCOUNTS, M/S GADOON TEXTILE MILLS LIMITED, UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST PESCO REGARDING WITHDRAWAL OF LATE PAYMENT SURCHARGE View

    10-02-2022

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. SHAKEEL AHMED S/O DANISH MUHAMMAD UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING CORRECTION OF BILL View
  • 2021

    20-09-2021

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. ATIF HAYAT KHAN S/OHAYAT KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING UNJUSTIFIED BILL View

    29-06-2021

    DECISION OF THE AUTHORITY REGARDING MOTION FOR LEAVE FOR REVIEW FILED BY PESCO AGAINST THE DECISION OF MEMBER (CONSUMER AFFAIRS) DATED 11TH JANUARY 2021 IN THE MATTER OF SARHAD RURAL SUPPORT PROGRAMME (SRSP) VS PESCO REGARDING PAYMENT OF ELECTRICITY DUES View

    01-06-2021

    DECISION IN THE MATTER OF COMPLAINT FILED BY M/S SARHAD RURAL SUPPORT PROGRAMME (SRSP) AGAINST PESCO REFERRED BY THE WAFAQI MOHTASIB (OMBUDSMAN)'S SECRETARIAT REGARDING UNJUSTIFIED BILLING View

    18-05-2021

    DECISION OF THE AUTHORITY REGARDING MOTION FOR REVIEW OF ORDER DATED 29TH DECEMBER 2020 UNDER RULE 16(6) OF NEPRA TARIFF (STANDARDS AND PROCEDURES) RULES, 1998 READ WITH OTHER ENABLING PROVISIONS � M/S NAUMAN ICE FACTORY VS PESCO View

    10-02-2021

    DECISION IN THE MATTER OF COMPLAINT FILED BY MR. RAB NAWAZ KHAN KHATTAK S/0 UMAR KHITAB IN PURSUANCE OF THE ORDERS OF THE HONORABLE PESHAWAR 1-HIGH COURT, PESHAWAR IN WRIT PETITION NO. 2904-P/2020: RAB NAWAZ KHAN KHATTAK VS NEPRA & OTHERS View

    11-01-2021

    DECISION IN THE MATTER OF COMPLAINT FILED BY SARHAD RURAL SUPPORT PROGRAMME (SRSP) UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING PAYMENT OF ELECTRICITY DUES PESCO-110/10/2020 View
    04-02-2021 DECISION IN THE MATTER OF COMPLAINT FILED BY CMPAK LIMITED (ZONG) UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT. 1997 AGAINST DISTRIBUTION COMPANIES REGARDING IMPOSITION OF SURCHARGES AND TAXES      View
  • 2020
    20-11-2020 DECISION IN THE MATTER OF COMPLAINT FILED BY MR. NASEER AHMED Sb RASHEED AHMED UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING EXCESSIVE BILLING (AC #42266620457500) View
    16-11-2020 DECISION IN THE MATTER OF COMPLAINT FILED BY MR. ALMAS KHAN UNDER SECTION 39 OF THE REGULATION OF GENERATION, TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER ACT, 1997 AGAINST PESCO REGARDING CORRECTION OF BILL View
    13-07-2020 DECISION IN THE MATTER OF COMPLAINT FILED BY PAKISTAN TELECOMMUNICATION COMPANY LIMITED (PTCL) UNDER SECTION 39 OF THE NEPRA ACT, 1997 AGAINST PESCO REGARDING CONVERSION OF DEDICATED DISTRIBUTION SYSTEM INTO COMMON DISTRIBUTION SYSTEM View
    24-01-2020  ORDER IN THE MATTER OF COMPLAINT FILED BY MR. RAB NAWAZ KHAN KHATTAK AND OTHERS IN PURSUANCE OF THE ORDERS OF THE HONORABLE PESHAWAR HIGH COURT, PESHAWAR IN WRIT PETITION NO. 5673-P/2018: RAB NAWAZ KHAN KHATTAK VS NEPRA & OTHERS View
  • 2018
    15-02-2018 Order in the matter of Complaint filed by Mr. Hazrat Hussain Assistant Director/CRP District Mardan under Section 39 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 against PESCO regarding Illegal Installation of Stone Crushing Plant View
  • 2017
    25-05-2017 Order of the Authority regarding Appeal filed by PESCO against the decisions of Member (Consumer Affairs) dated 23rd August 2016 in the Matter of Complaint of Bestway Cement Limited against PESCO regarding Security Deposit. View
    13-02-2017 Order in the matter of Complaint filed by Mr. Rab Nawaz Khan Khattak and Others under Section 39 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 against PESCO regarding Arrears in the Bills Complaint # PESCO-30/2016 View
  • 2016
    24-08-2016 Decision in the Matter of Complaint filed by Bestway Cement Limited under section 39 of the Regulations of Generation, Transmission and Distribution of Electric Power Act, 1997 against PESCO Complaint PESCO- 106/2014 View
  • 2015
    13-11-2015 Decision in the Matter of Complaint filed by General Manager & Project Director, Tarbela Dam under section 39 of the Regulations of Generation, Transmission and Distribution of Electric Power Act, 1997 against PESCO regarding Provision of Supply at One-Point. Complaint # PESCO-31/2015 View
    16-09-2015 Decision in pursuance to the order of the Honorable Peshawar High Court Dated 25th March 2015 in writ Petition No. 2958-P of 2013: Mian Muhammad Ayaz and Others against Peshawar Electric Supply Company (PESCO) and others Complaint # PESCO-32/2015 View
  • 2013
    06-02-2013 DECISION OF THE AUTHORITY IN THE MATTER OF REVIEW MOTION FILED BY S. KARAMAT ALI RIZVI AGAINST THE DECISION PASSED BY MEMBER (CONSUMER AFFARIS) WITH RESPECT TO COMPLAINT FILED BY S. KARAMAT ALI  RIZVI UNDER SECTION 39 OF THE NEPRA ACT AGAINST PESCO REGARDING PAYMENT OF COST OF BURNT METERS View
  • 2012
    16-10-2012 Decision of the Authority in the matter of Complaint filed by MrS. t All Rizvi Project Director, Energy Monitoring Cell, Finance Department, Government of Khyber Pakhtunkhwa under Section 39 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 against PESCO regarding Application of Tariff D-2 View
    03-10-2012 Complaint of Mr. Allah Wasaya s/o Muhammad Nawaz under Section 39 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, against PESCO regarding Illegal Billing. Complaint # PESCO-186/2011 View
    29-05-2012 DECISION OF THE AUTHORITY IN THE MATTER OF A REVIEW PETITION FILED BY PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO) AGAINST THE DECISION OF CONSUMER AFFAIRS DIVISION REGARDING COMPLAINT FILED BY MR. SALAHUDDIN V/S PESCO View
    29-05-2012 DECISION OF THE AUTHORITY IN THE MATTER OF A REVIEW PETITION FILED BY PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO) AGAINST THE DECISION OF CONSUMER AFFAIRS DIVISION REGARDING COMPLAINT FILED BY MR. HABIBULLAH V/S PESCO View
    29-05-2012 DECISION OF TIlE AUTHORITY IN THE MATTER OF A REVIEW PETITION FILED BY PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO) AGAINST THE DECISION OF CONSUMER AFFAIRS DIVISION REGARDING COMPLAINT FILED BY MS. RAZIA BEGUM V/S PESCO View
    29-05-2012 Decision of the Authority in the Matter of a Review Petition filed by PESCO against the Decision of Consumer Affairs Division regarding Complaint filed by Mr. Azizullah. Complaint # PESCO-91/2011 View
  • 2011
    26-09-2011 Complaint of Mr. Azizullah under Section 39 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, against PESCO regarding Unjustified Electricity Bill. View
    11-02-2011 Complaint of Dr. Akhtar Abbas s/o Niaz Hussain under Section 39 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, against PESCO regarding shifting of HT Line Laying over the Roof of the Complainant. View