National Electric Power Regulatory Authority; Empowering the Power

4Home 4Tariff4Upfront /Indicative Tariff

 
GENERATION DISTRIBUTION TRANSMISSION UPFRONT TARIFF
UPFRONT /INDICATIVE TARIFF FOR IPP'S

View Online

Downloads
4

May 15, 2008 - Decision of the Authority in the Matter of Acceptance of Revised Upfront Tariff for Wind Energy Generation dated January 17, 2007 by Milergo Pakistan Ltd. 250 MW Wind Power Project.

View Download
4 January 11, 2008 Indicative Tariff for COAL based Power Plants View Download
4 Decision of the Authority w.r.t acceptance of Upfront tariff for Reciprocating Engines Technology by Gulf Electric Power Ltd View Download
4

Decision of the Authority w.r.t acceptance of Upfront tariff for Reciprocating Engines Technology by Taiyo Hills (Pvt) Ltd 

View Download
4

Jan 17, 2007 Revised Upfront Tariff  for Wind Power Generation

View Download
4

Extension of validity date of upfront tariff for IPPs

View Download
4

Upfront Wind tariff: authority decision :

View Download
4

         Annexures:

View Download
4

Upfront tariff (Thermal Power Plants):

Detail
4

Indicative tariff:

Detail
4

Upfront tariff for Reciprocating Engine Technology.

View Download
4

Sep 14, 2006 - Revised upfront tariff for Reciprocating Engine Technology

View Download
4

         Annexure-I

View Download
4

         Annexure-II

View Download
4

Sep 14, 2006 - Revised upfront tariff for Wind Power Generation

View Download
 Copyright © 2007-08 National Electric Power Regulatory Authority. All Rights Reserved.